Marcio Galardo

Asset Management Engineer at Light
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Rio de Janeiro, Rio de Janeiro, Brazil, BR
Languages
  • Português Native or bilingual proficiency
  • English Full professional proficiency
  • Espanhol Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

João Vieira Araujo

Márcio Galardo é comprometido, resiliente, sério, organizado e eficiente. Sua sólida formação acadêmica e facilidade de relacionamento completam o perfil desse excelente profissional.

Camila Souza

Tive o prazer de trabalhar com Marcio por cinco anos na Light Energia. O que mais me impressiona no Márcio é a sua capacidade ímpar de manter a calma e sem nunca perder o controle. Marcio possui fortes competências técnicas, participou de grandes projetos desde a implementação da PCH Lajes até o gerenciamento de projetos de pesquisa e desenvolvimento. Ademais, destaco a sua força, resiliência, empatia e suas qualidades enquanto pessoa, fundamentais para qualquer bem-estar de uma empresa. Guardo excelentes memórias dos tempos em que trabalhamos juntos e não hesito em recomendá-lo para qualquer função no mundo empresarial.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Mechanical Engineer
    Crea-RJ
    Aug, 2011
    - Oct, 2024

Experience

    • Hong Kong
    • Artists and Writers
    • Asset Management Engineer
      • Nov 2022 - Present

      • Management of Operation and Maintenance (O&M) contracts;• Support to senior management, presenting trend scenarios in the market and possible risks for decision-making;• Control of contracts to ensure compliance with contractual clauses;• Management of short-term market exposure presented in weekly meetings;• Control of the financial statements, identifying the main deviations and presenting possible corrections;• Management of energy purchase and sale contracts - registration, validation, provision of guarantees, accounting, penalty management;• Provide support for Regulation activities - preparation of contributions to Public Consultations by ANEEL and MME;• Management of penalties for insufficient energy ballast, through the monitoring and projection of the energy balance of the power plants;• Disclosure of results and indicators for the company's IR. Show less

    • Field Engineer
      • Sep 2014 - Nov 2022

      • Operation and Maintenance Engineer responsible for the Lajes Hydroelectric Plant (technical responsibility);• Power plant contract management;• Inventory control and material acquisition plan;• Coordinating the implementation of projects on the site;• Planning, support and intervention in mechanical equipment (turbines, valves, gates, pumps, filters, compressors, heat exchangers, hydraulic units, among other equipment that make up the system), for preventive, predictive and corrective maintenance;• Commissioning of mechanical equipment;• Controlling budget, schedules, payment events, elaboration of technical specifications, analysis of proposals, creation of requisitions.Responsible for conducting the implementation and O&M works of the 17.5 MW hydroelectric plant with more than 100 employees on site. Expertise in project analysis, construction supervision, testing and commissioning of electromechanical equipment, O&M contract management, inventory control, schedule control and payment event chart, preparation of technical specifications and requisitions, among others.• Responsible for R&D projects at Light Energia, namely: • Jaíba Solar, a photovoltaic solar energy project. Acting in the control of schedule and payment events, for the development of basic and executive projects, environmental studies, book publication. • Solar photovoltaic project, which consisted of the implementation of 8 evaluation modules with different climates in Brazil to evaluate the technical and economic performance of generation in 7 different technologies and the installation of a 3 MWp Cidade Azul plant in Tubarão-SC. The role was to control the schedule and eventgram for the development and implementation of the project. • Project for remote assistance in maintenance through augmented reality, to assist teams in remote maintenance, with the aim of reducing travel costs and assistance time. Show less

    • Engineer Full
      • Sep 2013 - Aug 2014

      • Conduction of the Fontainha and São Judas Tadeu Wind Farm project, in licensing, control of anemometric measurements and qualification and registration in energy auctions.• Development of the basic project, licensing and technical analysis of proposals for the construction of the Lajes hydroelectric plant.

    • Engineer
      • Nov 2011 - Aug 2013

      • Documentation analysis and reporting of the implementation of the Alto Sertão 1 wind farm for management. The project consisted of the implementation of 14 wind farms with 294.4 MW, totaling 184 wind turbines. Installation of a 2-kilometer, 1700 mm diameter pipeline to make the water supply operation in RJ more flexible, in addition to the implementation of mechanical equipment such as suction cups, butterfly valves, overhaul of the overhead crane, among others.

    • Brazil
    • Government Administration
    • 700 & Above Employee
    • Scholarship / Metallurgical Engineering
      • Aug 2011 - Oct 2011

      Master's Scholarship in Metallurgical Engineering, with studies in the area of: Finite Element Simulation of Residual Stresses and Distortions in the Arc Welding Process of Steel Plates. Master's Scholarship in Metallurgical Engineering, with studies in the area of: Finite Element Simulation of Residual Stresses and Distortions in the Arc Welding Process of Steel Plates.

    • Project Implementation - Internship
      • Dec 2010 - Aug 2011

      Internship in General Engineering Manages, worked in the implementation of various projects in Volta Redonda – RJ/Brazil. Recovery of acid Revitalization Unit 1 and 2 and return of the pickling line tanks; Revitalization of Effluent Treatment Station Filters of the Hot Roller 2; Reconditioning of Cranes; Increased dust removal system; Adequacy of Protection Systems and Fire Fighting; Replacement of chuck of the steel sheet winding line; Replacement of the electric busbar powered by festoon system. Show less

Education

  • Ibmec
    Master of Business Administration - MBA, Project management
    2018 - 2019
  • Universidade Federal Fluminense / UFF
    Master in Metallurgical Engineering, Arc Welding Modeling on Steel Sheets (ABAQUS)
    2011 - 2014
  • UFRJ - Universidade Federal do Rio de Janeiro
    Specialization in Electrical Engineering
    2015 - 2016
  • Universidade Federal Fluminense / UFF
    Mechanical Engineer
    2006 - 2011
  • Universidade de Brasília
    Extension, International School on Solar Energy
    2018 - 2018
  • Instituto Educacional de Cultura Internacional
    Basic, Intermediate and Advanced, Teaching English as a Second Language
    2007 - 2009

Community

You need to have a working account to view this content. Click here to join now