Marc McMahon
Regional Sales at Bunn Box, Inc.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Bunn Box, Inc.
-
United States
-
Environmental Services
-
1 - 100 Employee
-
Regional Sales
-
Jan 2021 - Present
Located in Fort Wayne, Indiana with facilities and services extending throughout Northern and Central Indiana. Bunn Box offers fast, reliable and fair waste disposal and recycling services for residential, commercial and industrial customers, including flexible on-demand or recurring delivery and collection of closed-top dumpsters and open-top roll off containers ranging in size from 2 cubic yards to 40 cubic yards, industrial compactors, concrete and asphalt crushing and recycling, and waste sorting and documentation services to help your project achieve LEED® certification. Show less
-
-
-
GE HealthCare
-
United States
-
Hospitals and Health Care
-
700 & Above Employee
-
OTR & OPSI Manger
-
Jan 2014 - Jan 2021
Commercial Operations, Materials and Production Sales and Inventory. Manage the OTR team, business PSI and exectuion of inventory and parts demand forecast. GE Ambassador Medical - Ultrasound system refurbishment and remanufacturing, Circuit board and system repair, Portable ultrasound repair depot, Trophon repair depot, Probe refurbishment Part harvest services, Preparation & paint booths, Full GE QMS & FDA Registered site, ISO 13485 certified Commercial Operations, Materials and Production Sales and Inventory. Manage the OTR team, business PSI and exectuion of inventory and parts demand forecast. GE Ambassador Medical - Ultrasound system refurbishment and remanufacturing, Circuit board and system repair, Portable ultrasound repair depot, Trophon repair depot, Probe refurbishment Part harvest services, Preparation & paint booths, Full GE QMS & FDA Registered site, ISO 13485 certified
-
-
-
GE Energy Connections
-
United States
-
Electric Power Transmission, Control, and Distribution
-
300 - 400 Employee
-
Functional Quality Leader
-
Feb 2011 - Jan 2014
Responsible for Quality Management System (QMS) creation and maintanence of documentation covering 60 sites. Overall administration of the Audit program, finding resolution, participation in audits, NCN and RCA resolution, effectivenss verification for findings and Customer Issue resolution. Level II Auditor, RCA certified and Methods and Work Instruction Course trainer. Responsible for Quality Management System (QMS) creation and maintanence of documentation covering 60 sites. Overall administration of the Audit program, finding resolution, participation in audits, NCN and RCA resolution, effectivenss verification for findings and Customer Issue resolution. Level II Auditor, RCA certified and Methods and Work Instruction Course trainer.
-
-
-
GE
-
United States
-
Industrial Machinery Manufacturing
-
700 & Above Employee
-
IT Project Manager
-
Jul 2007 - Feb 2011
Responsible for the IT requirements to transition Small AC prodcut from Canada to Mexico. Moved Motors business FP&A tool (Cognos) from C&I server to and Energy server away from C&I support. Transitioned My Workplace customer invoicing information from C&I to Energy. Developed transition list of applications needed to support the sourcing transition from C&I to Energy.
-
-
PSI Leader Motors & Controls
-
Aug 2002 - Jul 2007
Lead role in driving inventory reductions and turns improvements by over 1 point a year. Established line rates for the plants based on forecasting sales and inventory levels, reduced obsolete/slow moving inventory by over $1.9M, established stocking levels for stock products and customer stocking programs, Customer Service (RK & PK Levels - PK's 95%). Implemented a new Order Ship Build (OSB) system for the business and demand planning module (Oracle). Developed inventory and production plans to support transfer of work programs (TOW). Show less
-
-
Materials Manager
-
Jan 2001 - Aug 2002
Responsible for Inventory Reductions, Turns Improvement, Customer Service, Requests & Promises Kept, Receiving, Stocking, Transportation, Supplier Material Stream, Master Scheduling & Inventory Mgmt. Implemented a new MRP system (MES) manufacturing execution system, while establishing a new controlled stockroom, kanbans, locations and controls to maintain 98% accuracy on stock.
-
-
Manager, Shop Operations
-
Nov 1999 - Jan 2001
Responsible for daily operations of the Taylor Street commercial AC motor plant including 3 supervisors and 325 union employees. Running line rates of 13-15k motors a week with an average lot size of 15. Responsible for Cost, Delivery and EHS requirements.
-
-
Manager, Manufacturing Engineering and Materials
-
Apr 1998 - Jan 2000
Broadway Plant, Electric Vehicle (Motion Systems) business.Responsible for Inventory Reduction, Turns Improvement, Customer Service, Productivity, Quality, Contribution Margin, Creating Operating Plans, Requests & Promises Kept. Implemented a new purchasing system that directily tied to the MRP system (Oracle).
-
-
Sourcing and Value Engineer
-
Mar 1994 - Apr 1998
Responsible for Price, Quality, Delivery & Inventory Reduction, commodities included all Class "C" items. Fasteners, clampbolts, Springs, Foreslide parts, Switches, Relays, Powdered Metal parts, Screw Machine parts, small stampings. Supported 23 Manufacturing sites both foreign and domestic with an inventory buy of over $30 million, implemented consignment, stocking programs and contracts with suppliers. Supported New Product Introductions working with supplires on cost out opportunities in the design stages of a new product. Show less
-
-
-
GE Aircraft
-
Fort Wayne, Indiana Area
-
Producibility Engineer & Methods and Process Engineer
-
Sep 1988 - Mar 1994
Responsible for Manufacturing Cost, Quality & Delivery. (T700 Dec, -80 PMC, F110 EMSP, F110 IPE and F118 EMSP) Responsible for Methods and Processes - Planning Instructions, Equipment, Tooling, Process Improvements & Development and Retrofit Instructions. Defined all items required to manufacture electronic controls and cables. Responsible for Manufacturing Cost, Quality & Delivery. (T700 Dec, -80 PMC, F110 EMSP, F110 IPE and F118 EMSP) Responsible for Methods and Processes - Planning Instructions, Equipment, Tooling, Process Improvements & Development and Retrofit Instructions. Defined all items required to manufacture electronic controls and cables.
-
-
-
General Electric
-
Fort Wayne, Indiana Area
-
Product Assurance Engineer
-
Feb 1986 - Sep 1988
Administered the Quality Control Program, Characteristic Verification Process (CVP). Responsible for 12 exempt auditors oversite of the overall program. for Cables and Electronic Controls. Also oversite for production, engine line and field return disposition. Administered the Quality Control Program, Characteristic Verification Process (CVP). Responsible for 12 exempt auditors oversite of the overall program. for Cables and Electronic Controls. Also oversite for production, engine line and field return disposition.
-
-
Education
-
ITT Technical Institute-Fort Wayne
Masters, Project Management -
ITT Technical Institute-Fort Wayne
Bachelors, Automation, Manufacturing Engineeering -
ITT Technical Institute-Fort Wayne
Associates, Electronic Technology, Engineering