Octavian T.

Executive Director at GLOBAL Construct
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Romania, RO
Languages
  • Română Native or bilingual proficiency
  • Engleză Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Netherlands
    • Construction
    • 1 - 100 Employee
    • Executive Director
      • Sep 2019 - Present

    • Construction Project Manager
      • May 2017 - Sep 2021

      www.manupfaster.ro www.manupfaster.ro

    • France
    • Wholesale Building Materials
    • 700 & Above Employee
    • Construction Manager
      • May 2018 - Sep 2019

    • United Arab Emirates
    • Construction
    • 1 - 100 Employee
    • Superintendent
      • May 2016 - Mar 2018

      Large scale reclamation and coastal protection where these include transport of fill material, spreading, compaction works and rock placing for revetment and breakwaters in accordance to the contract specifications and with minimal tolerances using appropriate technologically advanced land based and marine equipment.1. DUBAI, EXPO 2020 – Earthworks (Trench excavations for water and sewage pipelines)Large scale trench excavations for water and sewage pipelines where these include transport of fill material, spreading, back-filling, compaction works using advance technology equipment, Trimble Global Positioning System (GPS) survey guidance system on machines and different types protective systems: Sloping, Benching, Shoring and Shielding.2. KALBA CITY – Beach DevelopmentDevelopment of Kalba beach project, extending along a 7.7km stretch from the border of Kalba City with Fujairah City to Kalba Khor. Large scale reclamation and coastal protection project where these include transport of fill material, spreading, compaction works, dredging and rock placing for revetment and breakwaters (onshore and offshore works), using Trimble Global Positioning System (GPS) survey guidance system for trimming slopes and placing core or/and armour rocks.3. AL YAMMAHI – developing a private marina in Dadna-Fujairah Mobilization and site arrangement, profiling – excavation, profiling backfilled material – fill, placing and profiling core rock (10-1000 kg), placing and profiling armor rock (3-5 tones). All the rock material was placed in shallow as well as deep water conditions using land based equipment (long reach excavators with bucket and grab) and Trimble Global Positioning System (GPS) survey guidance system

    • France
    • Environmental Services
    • 700 & Above Employee
    • Site Manager
      • Sep 2014 - Feb 2016

      Project : Construction Works For The Rehabilitation Of Centralized Irrigation Systems Along Upper Prut RiverResponsible for overseeing and directing construction project from conception to completion, ensuring that the execution of construction project is completed on time and within budget, that the client’s specifications and requirements are met.Rehabilitation area of irrigation system for about nine hundred and eighty (980) ha including:- earth works ( soil excavation, leveling, fill and backfill, compacting)- dredging works ( river dredging for installing new River Intake Structure: system with three suction steel pipes DN 800 mm )- installing new pipe network (total length of pipes: about 32944 m, HDPE pipe ND 160 mm - 450 mm / GRP pipe ND 600 mm-1200 mm / STEEL pipe ND 600 mm-800 mm also concrete manhole, air release valves, intersections valves, hydrant, SCADA monitoring system)- civil works ( construction of 2 pump stations with 9 main pumps - brick walls, concrete foundation structure, steel structure )

    • Netherlands
    • Civil Engineering
    • 700 & Above Employee
    • Superintendent Civil/Rock Works
      • Aug 2013 - Sep 2014

      Project: Constanta Port Northern Breakwater ExtensionThe completion of the offshore breakwater aims to expand the existing breakwater by 1.05 km, in water 26 meters deep, a fact that will improve the exploitation conditions and the safety of the vessels entering the Port of Constanta (the biggest Romanian port along the Black Sea). Plan, schedule and supervise the daily works :- a total of more than 3 million tons of stone, different diameters was stocked, load and transport to offshore site. Collaborating with offshore site manager we manage to supply the necessary of rocks by loading from the stock in to side-stone dumping vessels and send it to the breakwater.I was responsible for all operations starting with purses order to the rock suppliers, building stock pile (up to 40 m high ) of rocks, and shipping to the breakwater using excavators (6 to 8 / shift), dumpers (8-10 / shift), front loaders (4-6 / shift) and man power ( 60 -100 / shift).For the slopes of the breakwater we have to produce 16189 units of concrete ACCROPODE II (3 MC, 9 MC and 12 MC), using 192 steel molds, up to 900 MC per day fresh concrete. The production of an ACCROPODE II unit consists of preparation and assembly of form-work, supply of concrete, pouring and vibrating the concrete in the form-work, striking the molds and curing of the concrete. I was responsible for the operation of all fabrication works, that all activities are carried out in a safe and controlled manner in accordance with the safe working procedures, inspection and testing, managing the work progress and help when needed

    • Senior Site Manager
      • Apr 2011 - Aug 2013

      Contract under RED FIDIC conditionsThe project includes the following works:new distribution network for drinking water 11606 mnew draining network for domestic waste-water 13239 mdomestic waste-water pumping stations 10 piecesdischarge pipe for pumping stations 6998 mconnections to consumers 837 piecesrisers 837 piecesmanhole and drain valves 28 pieces135 pieces of fire hydrantsrebuilding the road system to its original state Contract under RED FIDIC conditionsThe project includes the following works:new distribution network for drinking water 11606 mnew draining network for domestic waste-water 13239 mdomestic waste-water pumping stations 10 piecesdischarge pipe for pumping stations 6998 mconnections to consumers 837 piecesrisers 837 piecesmanhole and drain valves 28 pieces135 pieces of fire hydrantsrebuilding the road system to its original state

    • Senior Site Manager
      • Mar 2008 - Mar 2011

      1. “Water and waste-water supply system rehabilitation and development, including pumping stations” – SULINA TownContract under RED FIDIC conditions. New drinking water distribution network – 17298 mNew domestic waste-water sewage – 16465 mDomestic waste-water pumping stations- 4 piecesDischarge pipe for pumping stations – 5700 mConnections to consumers – 1268 piecesRisers – 1212 piecesManhole and drain valves – 90 piecesFire hydrants – 178 pieces2. “Expanding and rehabilitating water treatment facilities in Sulina territorial unit” Contract under YELLOW FIDIC conditions. The project includes the following works:Reconstruction of waste-water treatment plant for SULINAThe capacity design was calculated for a maximum daily flow during rain of 1200 MC / day.Rehabilitation of: cribs, drinking water transmission pipes, filters, station, water tank with a capacity of 600 MC of drinking water, pumping station up to the connection to drinking water distribution networks, water analysis laboratory;New chlorination station, a new building where two new water chlorination system will be installed using ozone treatment, activated carbon filters and sand dispatcher to monitor the water supply system by introducing SCADA supervisory system.3. October 2009 – December 2010Project coordination: “SULINA Beach Improvement”- Sulina, Tulcea CountyContract under YELLOW FIDIC conditions. The project includes the following works:Road works - wooden walkways flooring's, access roads 6750 mNew drinking water distribution network – 3460 mNew domestic waste-water sewage – 2140 mDomestic waste-water pumping stations – 1 pieceDischarge pipe for pumping stations – 3200 m17 pieces of fire hydrants

    • Site Manager
      • Sep 2004 - Feb 2008

      Project Coordination: “Block of flats Gf+3”. Total value without VAT -1.300.000 euroProject Coordination: “Building construction B+Gf+M”. Total value without VAT-120.000 euroPlan, coordinate, check and supervise work; Site inspections to check the quality of works and their compliance with the execution graphs;Monitor activities and their compliance to the general and special specifications, to the conditions of the contract, technical specifications, project technical and detailed design;Check, correct and approve of payment of subcontractors;Draft the payment orders;Site inspection to supervise the works;Monitoring the execution of the Subcontractor activities in compliance to the general and special specifications, to the conditions of the contract, technical specifications, project technical and detailed design;Prepare daily, weekly and monthly production reports;Subcontractor selection.

Education

  • Universitatea Tehnică „Gheorghe Asachi” din Iași
    Diplomat Environmental Engineer, Hydro-technical constructions, Planning and Protection of Water and Soil
    1998 - 2003

Community

You need to have a working account to view this content. Click here to join now