    • Mexico
    • Oil and Gas
    • 1 - 100 Employee
    • Operaciones
      • Jul 2013 - Present

      Training Coaching of Engineers and Technicians Protections Equipment: SEL, Siemens, GE, ABB, Alstom Automation: IEC 61850, MSG Goose, DNP 3.0 Protection systems concepts Short circuit calculations, symmetrical components Power Transformers Instrument Transformers Control and Protection GENERATION SYSTEM Control AVR Training Coaching of Engineers and Technicians Protections Equipment: SEL, Siemens, GE, ABB, Alstom Automation: IEC 61850, MSG Goose, DNP 3.0 Protection systems concepts Short circuit calculations, symmetrical components Power Transformers Instrument Transformers Control and Protection GENERATION SYSTEM Control AVR

    • France
    • Civic and Social Organizations
    • Sr. Engineering technical and administrator project leader
      • Aug 2009 - Jun 2013

      Design and management of protection, control (P&C) and automation panels in an Engineering to Order scenario Technical design, cost budget review, validation, feasibility and risk analysis of P&C panels and control buildings. Milestones and tasks: managing all projects with efficient communication with customer as well as with other internal areas Engineering coordination: mechanical, electrical, automation, quality assurance. Communication and Planning: Direct customer contact, technical negotiation, receive the engineering approval, control the time schedule Supervision of the testing (FAT): protection and control logic settings. specifying the type of test to be performed on specific protection philosophy. Project closure Tasks: Analyze and submit the project gross margin report, documentation of cost deviations vs. the original sales order. Onsite Support to Customer: Provide trainings on new relays, protection philosophy Technical Guidance and Support: SEL Internal: Provide new ideas, suggestions on technical issues to Proposal department on international bids. Main Achievements: • Average cost savings per projects 10% to 15% • Saving on Engineering process lead time -30% • -30% of design phase time reduction • Bench mark in the engineering design and timing • 100% on time delivery in my projects • Leadership managing resources in between areas • Experience on International projects in México, Argentina, Guatemala, Panama, etc. • Customer CFE (MX utility) full satisfaction and recognition Show less

    • Azerbaijan
    • Banking
    • 700 & Above Employee
    • Manager, Power Substation site and Commissioning
      • Jan 2007 - Aug 2009

      On Site management for 400KV substations. Commissioning for the primary equipment and protections: On site Project management SAT (Site Acceptance and Testing) tests validation on site Final Test management on site Project plan design, implementation and validation Resources management on site Negotiation and documentation of deviations with the customer Negotiation of milestones closure with customer Negotiation of deliverables with subcontractors Project closure: Documentation on lessons learned Process map documentation for the commissioning Support on technical proposals and engineering development Main Achievements: • 100% on time delivery • Savings in materials -20% • Cost Savings with subcontractors • Customer Quality full acceptance, no further rework Show less

    • Engineer Specialist
      • Jun 1998 - Dec 2001

      Power System Distribution Substations: Plan, design and implement the Control and Protections maintenance plans for substations Responsible for Substation preventive maintenance for Protection and Control Performing preventive maintenance program, design and renovation of the power system substations Technical Training: Design and execute Training Program to utility owner’s engineers. Main Achievements • On Time Maintenance performance • Training the professionals and technicians of utility owner within a time span of 3 months. Show less

Education

  • Universidad Nacional de Rosario
    ELECTRICAL ENGINEER, Protection and Control Managment
    1989 - 1994
  • Universidad Nacional de Rosario

Community

You need to have a working account to view this content. Click here to join now