Manu George

Sales Engineer at Holyoake Industries Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Brisbane Area, AU

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Project Management Certifications – Project Scheduling & Budgeting, Planning, Cost Estimation, Time Management, Risk Management
    HUMANSOFT Holding

Experience

    • New Zealand
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Sales Engineer
      • Feb 2021 - Present

    • Australia
    • Wholesale
    • 1 - 100 Employee
    • Commercial Estimator
      • Jun 2020 - Feb 2021

    • Canada
    • Design Services
    • 300 - 400 Employee
    • Service Consultant
      • May 2020 - Feb 2021

      Design work for HVAC / MEP works, HVAC estimation, Technical specification writing & Procurement support services. Provide Solutions for IT, Education, Health Services & Waste Management Services. Design work for HVAC / MEP works, HVAC estimation, Technical specification writing & Procurement support services. Provide Solutions for IT, Education, Health Services & Waste Management Services.

    • Australia
    • Construction
    • 1 - 100 Employee
    • Estimator
      • Jul 2019 - Apr 2020

      Estimator Estimator

    • United Kingdom
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Snr. HVACEstimator
      • Apr 2018 - Jun 2019

    • Australia
    • Wholesale
    • 1 - 100 Employee
    • Commercial Estimator
      • May 2017 - Feb 2018

    • Egypt
    • Construction
    • 700 & Above Employee
    • Senior Project Engineer
      • May 2001 - Nov 2016

      Prepare concept & detail design taking into consideration salient architectural features, design inputs for load calculations, highlighting assumptions and raising queries for information requirements Ensure design code compliance with the local statutory requirements. Prepare equipment, ducting, chiller, condenser piping layout sketches for drafting team inputAssisting in providing rivet families to the draftersPrepare load calculations, schematics and equipment schedules Set project level of detailing as per stage and phase Estimate required man hours for engineering and drafting. Review the same with head of department for resource allocation Attend project coordination meetings Coordinate with international consultants and other departments Update standard details as per project requirements Prepare and maintain stake holder information for equipment selection, maintain and update project folder. Prepare specifications, Cost benefit analysis and Bill of Quantities. Review major equipment submission and respond to contractors RFI as per site engineer’s request Follow-up with local authorities for design approval Evaluation of tenders and coordinate with project out sourcing vendorsPrepare Building automation systems, schematics and control diagrams Show less

    • Project Engineer
      • Apr 2005 - Apr 2010

      Cooling and heating load calculation and design of duct systemsDesign of system details including fan, filter, compressors and heating and cooling coilsCalculation and selection of size of air-conditioning and ventilation equipment including chillers, fan coil units, air handling units, direct expansion packages, ducted split units, cooling towers and exhaust fansSize calculation and selection of AHU, Chillers , Condenser pumps, Chilled water pumps expansion tanks, oil tanks, and booster pumpsSpecification of software computation for HVAC equipmentDesign of fresh air and exhaust systems and refrigeration systems Preparation of project schedules and monitoring projectsResponsibility for the efficient and safe operation, maintenance, construction and repair of HVAC systems Show less

    • Quality Engineer
      • Jan 2001 - May 2001

      Checking the internal coating of pipies in kuwait metal pipe industries. Preparing reports for the activities during the coating process. Checking the internal coating of pipies in kuwait metal pipe industries. Preparing reports for the activities during the coating process.

    • Piping Engineer
      • Aug 1998 - Jan 2001

      Involved in supervision & Installation of hydrocarbon pipelines on offshore and onshore areas, loading and unloading of arms, pressure tanks, pedestal cranes, pig launchers & receivers. The job also involved preparation of pipe spool pieces, testing activities for prefabricated strings and post installed sections of pipes of various diameters. Inspection of cold insulation needed to be carried out as per EIL’s procedures. I also reviewed pipeline layouts and isometric drawings for pipe line erection. Show less

Education

  • S.J.C.I.T
    B.E, MECHANICAL
    1994 - 1998
  • Bangalore University
    Bachelor of Engineering (B.E.), Mechanical Engineering
    1994 - 1998

Community

You need to have a working account to view this content. Click here to join now