Manoj Ojha
Head - Rolling Projects at Jspl Limited- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Gujarati, Bangla -
Topline Score
Bio
Experience
-
Jspl Limited
-
India
-
Mining
-
400 - 500 Employee
-
Head - Rolling Projects
-
Jun 2022 - Present
-
-
-
Hindalco Industries Limited
-
India
-
Mining
-
700 & Above Employee
-
Vice President -Projects
-
Mar 2022 - Sep 2022
-
-
Asst. Vice President - Engineering & Projects
-
Dec 2010 - Apr 2022
Project Management –Preparation of schedule (Macro & micro both), interfacing with various agencies for adherence to the schedule. Aluminium Rolling Mill, Hot mill, Cold mill with finishing facilities. Erection activities at site- co-ordinating with various agencies, ensuring correct drawings, materials for smooth erection, reviewing project execution schedule periodically for smooth erection and commissioning. Cost management – Reviewing, project cost, itemized costing of material/equipments and packages on turnkey/non-turnkey basis in order to ascertain potential cost escalation areas. Planning & Budgeting- Planning budget & resource for targeted project activities, smooth execution. Industrial relations- Directing & managing industrial relations to ensure constructive work environment in project site and managing the site activities complete. People Management- Develop & review organizational structure for effective human resource utilization & their skills and knowledge up-gradation.Successful Commissioning of Phase -1 of Aluminium Rolling mill complex completed. Looked After Plant Engineering activities as Head Engineering (Both Mechanical + Electrical ) Maintenance head. (2015-2017).Currently leading the Flat Rolling Projects- Phase 2 worth 6500 Crs INR , as Project Lead for upcoming Cold Rolling Mill complex and a finishing lines. New AC Fin coating facilities to be set up at Taloja Unit- as a part of Government's initiative " Aatmnirbhar Bharat" worth - 400 Crs INR. , being stationed at Mumbai Head Office. Show less
-
-
-
ESSAR ENGINEERING SERVICES
-
India
-
Consumer Services
-
1 - 100 Employee
-
Asst. Vice President (Engineering)
-
Jan 2007 - Dec 2010
Steering entire Engineering activities across Steel Melt Shop, Casters & Rolling Mills. Conducting technology selection and feasibility study of EAF, LF, BOFs, VD-VOD, Casters-Slab caster & CSP, Billet & Bloom Casters, Flat Rolling Mills as Technologist; Co – ordination with the equipment suppliers and clients. Executing CSP technology for Casters, Tunnel Furnaces and Rolling Mills scheduling activities for achieving 2.5 million MT Hot Rolled coils produced from CSP Mill. Overseeing project procurement, co-ordination for complete casters and Rolling mill complex. Planning & scheduling activities to meet Time Schedule for completing the deliverables for engineering activities to be carried out. Show less
-
-
-
Bhushan Power and Steel Limited
-
India
-
Mining
-
1 - 100 Employee
-
Dy. General Manager - (CSP Project)
-
Aug 2005 - Dec 2006
The company is setting up an integrated steel plant of 2.2 MT capacity for making Hot Rolled Coils through CSP Technology in Rengali, Orissa. Project is having a cost of Rs. 7800 Crores. Role: Heading Entire project of CSP – Caster, Tunnel Furnace & Mill including Six Stand Finishing Mill, downcoilers and coil conveying system. Overseeing complete erection, commission and operation of Caster & mill with optimum efficiency. Effectively dealing with SMS Siemag, Germany, suppliers of the CSP technology for completion of the project in concurrence with our consultants MECON. Performing technical clarifications/co-ordination with consultants concurrence to the suppliers - both Overseas and indigenous. Complete Erection & Commissioning of rolling mill; Cold & Hot trial and successful rolling of hot rolled coils. Show less
-
-
-
TATA STEEL LIMITED
-
India
-
Appliances, Electrical, and Electronics Manufacturing
-
1 - 100 Employee
-
Sr. MANAGER -(Engineering & Projects)
-
Aug 2004 - Aug 2005
Overseeing conceptualization and technology selection across 2.4 MT TSCR Thin Slab Casting & Rolling. Making comparison statement in tandem with M.N. Dastur (Consultants). Coordinating with Civil, Structural, Electrical & Automation groups in view of the project. Providing justification & recommendations to the top management for technology selection. Linking it with the process requirements for smooth functioning after commissioning. Ensuring adherence to time schedule for completion and following up with the concerned department. Planning & scheduling activities to meet the time schedule, costing of equipments, etc. Show less
-
-
-
-
Manager- Rolling Mill (CSP- Operations)
-
Sep 1999 - Sep 2004
Spearheading operations of CSP mill including Tunnel Furnaces, Six stand finishing mill, Downcoilers and machines like Cut – To –Length, Slitting Machines and other project jobs. After completion of the projects, responsible for Mill operations. Administering operations for smooth rolling of different sections and grades in a shift with optimum quality in CSP mill. Planning the product mix to suit the requirements in line with the plant situation. Interfacing with other departments as In Charge like Maintenance, Planning, Quality Control, Coil Yard, Roll Shop, Utilities, Caster and Steel Melting Shops for smooth functioning. Ensuring adherence to production plan with minimum yield loss, non- prime generation, with maximum output level. Monitoring High speed steel (HSS) rolls & pass life-improving activities by introducing new developments. Show less
-
-
-
-
Dy. MANAGER - HSM (PROJECTS & OPERATIONS)
-
Sep 1994 - Sep 1999
JVSL (Now JSW) was a green field project worth Rs. 5000 Crores for setting up an integrated Steel Plant. Role: Spearheading entire operations for execution of Greenfield project from conceptualization to execution and commissioning stage. Drawing modifications using CAD as the main tool & incorporating latest drawing revisions for equipment. Making design changes if required to suit requirements. Conducting techno commercial negotiations with suppliers. Making comparison statements followed by placing orders. Undertaking complete erection and commissioning of Mechanical Equipments like Vertical Edger, Rotary Crop Shear, Water Circulation System, Hydraulic Systems etc., for H.S.M. Project. Responsible for HSM operations as a Shift-In-Charge after commencement of commercial production. o Reversing Roughing Mill, Coil Box, Six Stand Finishing Mill, Laminar cooling and downcoiler area. Also additional responsibility for Roll shop area. Show less
-
-
Education
-
Birla Institute of Technology
Bachelor of Engineering (B.E.), MECHANICAL ENGINEERING -
St. Xaviers college Ranchi
Intermediatre Science (ISc)