Manoj Ojha

Head - Rolling Projects at Jspl Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Mumbai, Maharashtra, India, IN
Languages
  • Gujarati, Bangla -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • India
    • Mining
    • 400 - 500 Employee
    • Head - Rolling Projects
      • Jun 2022 - Present
    • India
    • Mining
    • 700 & Above Employee
    • Vice President -Projects
      • Mar 2022 - Sep 2022

    • Asst. Vice President - Engineering & Projects
      • Dec 2010 - Apr 2022

       Project Management –Preparation of schedule (Macro & micro both), interfacing with various agencies for adherence to the schedule. Aluminium Rolling Mill, Hot mill, Cold mill with finishing facilities. Erection activities at site- co-ordinating with various agencies, ensuring correct drawings, materials for smooth erection, reviewing project execution schedule periodically for smooth erection and commissioning. Cost management – Reviewing, project cost, itemized costing of material/equipments and packages on turnkey/non-turnkey basis in order to ascertain potential cost escalation areas. Planning & Budgeting- Planning budget & resource for targeted project activities, smooth execution.  Industrial relations- Directing & managing industrial relations to ensure constructive work environment in project site and managing the site activities complete.  People Management- Develop & review organizational structure for effective human resource utilization & their skills and knowledge up-gradation.Successful Commissioning of Phase -1 of Aluminium Rolling mill complex completed. Looked After Plant Engineering activities as Head Engineering (Both Mechanical + Electrical ) Maintenance head. (2015-2017).Currently leading the Flat Rolling Projects- Phase 2 worth 6500 Crs INR , as Project Lead for upcoming Cold Rolling Mill complex and a finishing lines. New AC Fin coating facilities to be set up at Taloja Unit- as a part of Government's initiative " Aatmnirbhar Bharat" worth - 400 Crs INR. , being stationed at Mumbai Head Office. Show less

    • India
    • Consumer Services
    • 1 - 100 Employee
    • Asst. Vice President (Engineering)
      • Jan 2007 - Dec 2010

       Steering entire Engineering activities across Steel Melt Shop, Casters & Rolling Mills.  Conducting technology selection and feasibility study of EAF, LF, BOFs, VD-VOD, Casters-Slab caster & CSP, Billet & Bloom Casters, Flat Rolling Mills as Technologist;  Co – ordination with the equipment suppliers and clients.  Executing CSP technology for Casters, Tunnel Furnaces and Rolling Mills scheduling activities for achieving 2.5 million MT Hot Rolled coils produced from CSP Mill.  Overseeing project procurement, co-ordination for complete casters and Rolling mill complex.  Planning & scheduling activities to meet Time Schedule for completing the deliverables for engineering activities to be carried out. Show less

    • India
    • Mining
    • 1 - 100 Employee
    • Dy. General Manager - (CSP Project)
      • Aug 2005 - Dec 2006

      The company is setting up an integrated steel plant of 2.2 MT capacity for making Hot Rolled Coils through CSP Technology in Rengali, Orissa. Project is having a cost of Rs. 7800 Crores. Role:  Heading Entire project of CSP – Caster, Tunnel Furnace & Mill including Six Stand Finishing Mill, downcoilers and coil conveying system.  Overseeing complete erection, commission and operation of Caster & mill with optimum efficiency.  Effectively dealing with SMS Siemag, Germany, suppliers of the CSP technology for completion of the project in concurrence with our consultants MECON.  Performing technical clarifications/co-ordination with consultants concurrence to the suppliers - both Overseas and indigenous.  Complete Erection & Commissioning of rolling mill; Cold & Hot trial and successful rolling of hot rolled coils. Show less

    • India
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Sr. MANAGER -(Engineering & Projects)
      • Aug 2004 - Aug 2005

       Overseeing conceptualization and technology selection across 2.4 MT TSCR Thin Slab Casting & Rolling.  Making comparison statement in tandem with M.N. Dastur (Consultants).  Coordinating with Civil, Structural, Electrical & Automation groups in view of the project.  Providing justification & recommendations to the top management for technology selection.  Linking it with the process requirements for smooth functioning after commissioning.  Ensuring adherence to time schedule for completion and following up with the concerned department.  Planning & scheduling activities to meet the time schedule, costing of equipments, etc. Show less

    • Manager- Rolling Mill (CSP- Operations)
      • Sep 1999 - Sep 2004

       Spearheading operations of CSP mill including Tunnel Furnaces, Six stand finishing mill, Downcoilers and machines like Cut – To –Length, Slitting Machines and other project jobs.  After completion of the projects, responsible for Mill operations.  Administering operations for smooth rolling of different sections and grades in a shift with optimum quality in CSP mill.  Planning the product mix to suit the requirements in line with the plant situation.  Interfacing with other departments as In Charge like Maintenance, Planning, Quality Control, Coil Yard, Roll Shop, Utilities, Caster and Steel Melting Shops for smooth functioning.  Ensuring adherence to production plan with minimum yield loss, non- prime generation, with maximum output level.  Monitoring High speed steel (HSS) rolls & pass life-improving activities by introducing new developments. Show less

    • Dy. MANAGER - HSM (PROJECTS & OPERATIONS)
      • Sep 1994 - Sep 1999

      JVSL (Now JSW) was a green field project worth Rs. 5000 Crores for setting up an integrated Steel Plant. Role:  Spearheading entire operations for execution of Greenfield project from conceptualization to execution and commissioning stage.  Drawing modifications using CAD as the main tool & incorporating latest drawing revisions for equipment.  Making design changes if required to suit requirements.  Conducting techno commercial negotiations with suppliers.  Making comparison statements followed by placing orders.  Undertaking complete erection and commissioning of Mechanical Equipments like Vertical Edger, Rotary Crop Shear, Water Circulation System, Hydraulic Systems etc., for H.S.M. Project.  Responsible for HSM operations as a Shift-In-Charge after commencement of commercial production. o Reversing Roughing Mill, Coil Box, Six Stand Finishing Mill, Laminar cooling and downcoiler area. Also additional responsibility for Roll shop area. Show less

Education

  • Birla Institute of Technology
    Bachelor of Engineering (B.E.), MECHANICAL ENGINEERING
    1990 - 1994
  • St. Xaviers college Ranchi
    Intermediatre Science (ISc)
    1988 - 1990

Community

You need to have a working account to view this content. Click here to join now