Maniarasan S

Tunnel shift Manager at L&T Heavy Engineering
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Chennai, Tamil Nadu, India, IN
Languages
  • English Full professional proficiency
  • Tamil Full professional proficiency
  • Hindi Professional working proficiency
  • French Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • India
    • Manufacturing
    • 300 - 400 Employee
    • Tunnel shift Manager
      • Dec 2022 - Present

    • Senior Tunnel Engineer
      • Sep 2022 - Mar 2023

    • Senior engineer
      • Sep 2018 - Nov 2022

      Utlity EngineerWith Gulf standard experienceConstruction of Water line, sanity line, telephone line, storm waterline,I have completed a project from the first till the end son have knowledge in Diagram approval, material purchase, site preparation, execution, shutdown, handing over to client and ministery, documentation and bill preparation.

    • Execution engineer
      • Nov 2014 - Nov 2022

      Construction of tunnel and associated stations in CMRL projectPackage 1&5Major role: GROUTING ENGINEERExecution of grouting works in both station and tunnel with my teamIN TUNNELConstruction of 28no of CROSS PASSAGESEach cross passage lies in various soil zone from hard rock to loose sandy soil SOIL STABILIZATION through various technique *JET GROUTING from surface to make pile columns, *TAM GROUTING for gap filling between soil replacement piles *INJECTION GROUTING were surface grouting not possible *CHEMICAL GROUTING were soil collapse and water pressure is moreSoil stabilization for TBM launching and breakthrough *JET GROUTING *TAM GROUTING Show less

    • Russian Federation
    • Construction
    • 1 - 100 Employee
    • Site Engineer
      • Sep 2013 - Nov 2014

      Construction of Cross passage in tunnel of CMRL project Soil stabilation through JET GROUTING Arrangement of all machinaries,materials,manpower for production of piles and complete each site before target Excavation inside tunnel shorecreting,reinfocement,concreteing. Construction of Cross passage in tunnel of CMRL project Soil stabilation through JET GROUTING Arrangement of all machinaries,materials,manpower for production of piles and complete each site before target Excavation inside tunnel shorecreting,reinfocement,concreteing.

  • Ruby builders
    • Chennai Area, India
    • Site Supervisor
      • May 2013 - Aug 2013

      Construction of G+2 Residential apartment Started with Layout marking and completed upto full FRAMED STRUCTURE (columns,beams,slab,staircase,watertank) ROLE Study site diagram, Check Quality of materials and Order day to day materials, Construction of G+2 Residential apartment Started with Layout marking and completed upto full FRAMED STRUCTURE (columns,beams,slab,staircase,watertank) ROLE Study site diagram, Check Quality of materials and Order day to day materials,

Education

  • Anna University
    Bachelor's degree, Civil Engineering
    2009 - 2013

Community

You need to have a working account to view this content. Click here to join now