Mangar Costel

Project Coodinator at S.C. NASDIS CONSULTING SRL.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Galaţi, Galaţi, Romania, RO

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Shipbuilding
    • 1 - 100 Employee
    • Project Coodinator
      • Aug 2006 - Present

       Project Coordinator for: •2018-2021 C6273, C6306, C6289, C6298 -Cruise ships-Vard Tulcea-Outfitting detail design, production info. •2017-C6272–Carnival’s Third Vista Cruise Ship–VARD Tulcea-Outfitting detail design for some units •2016-2017-Floating Crane Transhipper Unit-Basic design •2015-2016-Ultra-luxury cruise ship built by Fincantieri –Detail design(hull&outfitt.) •2012-2014-TBSC LNG passenger/car ferry built by Davie Shipyard Canada for STQ Canada–Detail design. 2011-2012–80T B.P. Anchor Handling Tug/Support Vessel for Topaz Marine - Hull scantling (ABS rules),Class drawings, FEM Analysis (Femap10)  Lead engineer for: •2010-Convoy 'A58'+'C59'–Inland Tanker/ADN Type for CFT France–Basic design. •2009-2010-Floating Platform/Dock–10000 tones lifting capacity built by STX RO Offshore Tulcea – Basic design. •2008 - 2009-Scarabeo-8 Semi- sub Drilling Rig – built by Fincantieri Shipyard, Palermo - Superstructure detail design  Consultant for: •Howaldtswerke-Deutsche Werft, Kiel, Germany (08/2006-11/2006) Project: M/Y Eclipse - Hull 3D modeling (Tribon M3) & preliminary drawings; •Abeking & Rasmussen Shipyard, Lemwerder, Germany (05/2007-12/2007) Project: SWATH Ship - Detail design (Hull 3D Modeling (Nupas) & Workshop drawings); •Fincantieri Palermo Shipyard (08/2008-12/2008) Project: Scarabeo-8 Drilling Rig Semi-sub – Technical consultancy •SMB Consulting GmbH, Bremerhaven, Germany (03/2009-11/2009); Project: E-ship, Owner - Enercom - Detail design (Hull 3D Modeling (Nupas-Cadmatic) & Workshop drawings); •HB Hunte Engineering GmbH, Oldenburg, Germany (12/2010 - 06/2011) Project: Cable Layer – 7000 dwt ' Beluga Connection' - Class drawings, Hull 3D Modeling (Nupas-Cadmatic) •GVA Consultants AB, Gothenburg, Sweden (06/2012 - 08/2013) Project: - Category B (Cat-B) Semi – submersible well intervention rigs (Basic design), owned and operated by Aker Solutions' subsidiary Aker Oilfield Services; - Category D (Cat-D) Semi – submersible rig (Basic design); Show less

  • Damen Shipyard Galati
    • Galati, Romania
    • Ship Design Engineer
      • Feb 2006 - Jul 2006

  • S.C. WANSAT S.R.L.
    • Galati, Romania
    • Shipbuilding Engineer
      • May 2005 - Jan 2006

      Subcontractor for Aker Shipyard Braila Subcontractor for Aker Shipyard Braila

    • Shipbuilding Engineer
      • Aug 2003 - Apr 2005

      Subcontractor for Damen Shipyard Galati and Aker Shipyard Braila Subcontractor for Damen Shipyard Galati and Aker Shipyard Braila

Education

  • Faculty of Naval Architecture,' Dunarea de Jos' University of Galati, Romania
    Master's degree, Naval Architecture
    2005 - 2007
  • Faculty of Naval Architecture,' Dunarea de Jos' University of Galati, Romania
    Diplomat Engineer, Ships and Ocean Engineering

Community

You need to have a working account to view this content. Click here to join now