Manaf Al Hassan

FM & Projects Manager at Ministry of Foreign Affairs and International Cooperation
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
AE

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Government Administration
    • 200 - 300 Employee
    • FM & Projects Manager
      • Oct 2019 - Present

    • United Arab Emirates
    • Construction
    • 700 & Above Employee
    • Sr. MEP Coordinator/ MEP Project Manager
      • Nov 2013 - Sep 2019

    • Construction
    • 200 - 300 Employee
    • Construction Manager
      • Jun 2012 - Oct 2013

      ----Duties: Management & Coordination of all activities related to MEP (Mechanical, Electrical, Plumbing, Transportation & all other technical services) of the project. Prospective project management, planning and programming. Preconstruction activities and consultant co-ordination. Primary contact with vendors for MEP. Construction Administration & Quality/Management. Maintains relationship with the client representative for MEP and takes part in all relevant meetings. Overall responsible for meeting contract requirements in terms of scope, performance, quality and safety related to MEP. Directs activities of the head office, site office and various offices (Design, mechanical, electrical, and special equipment) assigned to the project execution, all related to MEP. Supervises the performance of the project control and administration activities, including planning, scheduling for MEP. Responsible for the analysis of works performed (monthly report - final report) and the assessment of consequences where needed. Give the proposal for allocation of sub-contractor to the Project Manager. Execute the handing over procedure of the MEP scope on site with the Consultant and the Client. Cost control for MEP during the construction. Keep contact to all relevant technical authorities. -----In present, I am working in construction of: ABU DHABI FUTURE SCHOOLS, Phase 2 The project consists of 3 schools; each school is 3 storeys, 8 wings, 3 huge multipurpose yards and service buildings with area of 19,000m2. Client: Abu Dhabi General Services PJSC (Musanada). Management: HILL International Co. Consultant: Dewan Architects and Engineers Co. Contractor: AMANA Contracting & Steel Buildings Co. MEP Contractor: Emirates Technical Associates Co. MEP Contract Value: 121 Million AED (Lump-sum). Project Dimensions: 58,800m2. Currently I am working as a site manager for 1 school with the MEP contractor. Show less

    • United Arab Emirates
    • Construction
    • 700 & Above Employee
    • Sr.Mechanical Engineer / Acting MEP Coordinator
      • Apr 2008 - May 2012

      ---- Duties:  Management & Coordination of all activities related to MEP (Mechanical, Electrical, Plumbing, Transpor- tation & all other technical services) of the project.  Prospective project management, planning and programming.  Preconstruction activities and consultant co-ordination.  Primary contact with vendors for MEP.  Manage international Standards & Guidelines.  Construction Administration & Quality/Management.  Maintains relationship with the client representative for MEP and takes part in all relevant meetings.  Attends and organize all site meeting within the engineer /Consultant for MEP.  Overall responsible for meeting contract requirements in terms of scope, performance, quality and safety related to MEP.  Directs activities of the head office, site office and various offices (Design, mechanical, electrical, and special equipment) assigned to the project execution, all related to MEP.  Supervises the performance of the project control and administration activities, including planning, scheduling for MEP.  Responsible for the analysis of works performed (monthly report - final report) and the assessment of consequences where needed.  Give the proposal for allocation of sub-contractor to the Project Manager.  Cost control for MEP during the construction.  Keep contact to all relevant technical authorities. ---- In present, I am working in construction of: JW MARRIOTT ABU DHABI HOTEL RESORT & SPA  The project is a breathtaking waterfront resort consists of a 10 building hotel complex, 88 chalets, a Venetian style walk (with serviced suites, F&B outlets and commercial outlets), serviced apartments building and a spa.  Client: Abu Dhabi National Hotels - ADNH.  Management: MACE Co.  Consultant: OTAK Co.  Project Value: 1.70 Billion AED (Re-measured).  Project Dimensions: 140,000m2.  More details at: http://www.adnh.com/site/abudhabi.php. Show less

    • Mechanical Or Industrial Engineering
    • 400 - 500 Employee
    • Projects Engineer – Design and Installation Department
      • Aug 2006 - Apr 2008

      ---- Duties:  HVAC systems designing and maintaining.  Workers guiding and supervising.  Coordination with client, consultant, and main contractor.  Customers convincing.  Systems and materials pricing.  Old systems troubleshooting. ---- During this period I have experienced the following:  Initial study of architectures plans & submits the most suggested suitable A/C Systems.  Cooling & heating load calculations using (HAP 4.03, Block Load 3.05).  Air conditioning equipments selection.  Pre-Drawing an initial design of A/C equipments & the required pipes network for chilled water system, & duct routing for packaged system.  Pipe design & head loss calculations.  Duct design & static pressure calculations.  Quantities take off. ---- Also, I have performed the following projects:  Al-Hejaz Towers – Jordan - 1200 TR – ESC System (new untraditional system) + Packaged system – $1.32m budget for HVAC system only.  The Specialty Hospital – Jordan – Special Water Chillers & AHU Systems for Operating and ICU suits – 515 TR – $465,000 budget for HVAC system only.  Darwazeh Furniture Showroom – Amman – 430 TR – ESC System.  Al-Hadi Mosque – Jordan – 60 TR – FCU & Chillers system.  Complex Villas – Jordan – Different Capacities – Ducted Split Systems.  Tawfeeq Ameera Building – Jordan – 145 TR – Ducted Split System.  Many Factories – Jordan (in Sahab & Irbid) – Industial Chiller Systems.  Al-Majd Station Studio – Jordan – 9 TR – Packaged System.  Jordan Electrical Power Co. /400KV Substation – Jordan – 18 TR - Air-handlers System. Show less

Education

  • Hashemite University
    Bachelor, Mechanical Engineering
    2002 - 2006

Community

You need to have a working account to view this content. Click here to join now