Man Chung Leung

Project and Design coordinator at Space4
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Birmingham, England, United Kingdom, UK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Construction
    • 1 - 100 Employee
    • Project and Design coordinator
      • Nov 2022 - Present

    • Programming
      • Apr 2022 - Oct 2022

    • Engineering Project Coordinator
      • May 2020 - Sep 2021

      - Plan and coordinate projects from start to finish, including organising the schedule of work - Take charge of work coordination of ceiling, curtain wall, aluminium cladding and façade systems - Plan the work and oversee the buying of necessary materials and equipment - Manage the construction site on a day-to-day basis, such as monitoring the labour force and subcontractors, checking materials, inspecting work and supervising quality control - Ensure the project is delivered on time and on budget by setting benchmarks - Prepare and submit material samples and drawings - Participate in design and progress meetings for stakeholder management - Arrange on-site inspections, welding tests and pull-out tests to maintain health and safety - Liaise and check design documents with clients, consultants, surveyors and architects Projects involved: 2 commercial building projects Show less

    • Construction Project Coordinator
      • Sep 2019 - May 2020

      - Coordinated and monitored the interior fitting-out works, rides and shows set - Prepared and submitted material samples and drawings - Participated in design and progress meetings and factory visits - Arranged on-site inspections, welding tests and pull-out tests - Communicated closely with clients, consultants and architects Project involved: Hong Kong Disneyland Resort Project – Arendelle Completion Package - Coordinated and monitored the interior fitting-out works, rides and shows set - Prepared and submitted material samples and drawings - Participated in design and progress meetings and factory visits - Arranged on-site inspections, welding tests and pull-out tests - Communicated closely with clients, consultants and architects Project involved: Hong Kong Disneyland Resort Project – Arendelle Completion Package

    • Project Engineering
      • Jan 2018 - Sep 2019

      - Took charge of work coordination of ceiling, curtain wall, aluminium cladding and façade systems - Arranged material ordering and logistics - Prepared and submitted material samples and drawings - Participated in design and progress meetings and Chinese factory visits - Arranged on-site inspections, welding test and pull-out tests - Liaised with clients, consultants and architects Project involved: - Land border development project (i.e. Liantang / Heung Yuen Wai Boundary Control Point) Show less

    • Construction Project Coordinator
      • Jul 2013 - Nov 2017

      - Carried out work coordination of ceiling, aluminium cladding and façade systems - Prepared and submitted material samples - Prepared working and as-built drawings for interim payment, claims and variation order items - Attended design and progress meetings and Chinese factory visits - Arranged on-site inspections, welding tests, pull-out tests, material delivery coordination, work quality assessment and recording - Monitored work progress to ensure work safety - Liaised with clients, consultants, quantity surveyors and architects Projects involved: - 9 high-rise residential building projects - 4 underground and railway projects (including Mass Transit Railway tunnels and stations) - 2 public facilities projects (i.e. HKSKH St. James Church and M Plus Museum) Show less

    • Hong Kong
    • Civil Engineering
    • 1 - 100 Employee
    • Autocad Draftsman
      • Feb 2012 - May 2013

      - Prepared working drawings and as-built drawings Projects involved: 2 underground and railway projects (including Mass Transit Railway tunnels and interchange) - Prepared working drawings and as-built drawings Projects involved: 2 underground and railway projects (including Mass Transit Railway tunnels and interchange)

Education

  • Hong Kong College of Technology
    Higher National Diploma, Building Construction Technology
    2015 - 2018

Community

You need to have a working account to view this content. Click here to join now