Malik Mussaddique

Trainee Engineer - Wireline Logging & Maintenance at GI Technologies (Beijing) Co., Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Pakistan, PK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • China
    • Oil and Gas
    • 1 - 100 Employee
    • Trainee Engineer - Wireline Logging & Maintenance
      • Sep 2019 - Present

      • Acquired theoretical training of all concerned subjects of Oil & Gas exploration and logging at China University of Petroleum. • Trained to maintain and operate downhole wireline equipment. • Procedures to perform maintenance and assembly on all downhole tools and trucks. • Acquired the general principles & gained knowledge behind the design of logging tools. • Assist in presenting proper bids for potential clients • Acquired theoretical training of all concerned subjects of Oil & Gas exploration and logging at China University of Petroleum. • Trained to maintain and operate downhole wireline equipment. • Procedures to perform maintenance and assembly on all downhole tools and trucks. • Acquired the general principles & gained knowledge behind the design of logging tools. • Assist in presenting proper bids for potential clients

    • Management Ambassador - Plant Maintenance
      • Feb 2019 - Sep 2019

      • Developed roadmap plan for implementation with Timelines - Data Collection - Identification of Plants and Equipment based on Failure Mode & Effect Analysis (FMEA) • Proposed & authorized condition based monitoring techniques for an existing system • Restructured and developed - Standard operating procedures – SOP’s - Checklist for every identified plant and equipment - Activity Frequency & Responsibility Matrix - Procedure of Team Training • Performed successful FMEA on existing plant and defined mitigation strategies. • Identified & recommended tools and equipment for successful implementation of CBM. • Performed Cost benefit analysis (CBA) on several CBM tools. • Worked cross functionally with production, quality and financial department to get a sum of PKR 0.7 Million approved for CBM implementation. • Advantages of Condition Based Monitoring implementation - Performed Cost Benefit Analysis of Preventive Maintenance Production Opportunity Cost, saving 24 days out of 96 days annually from maintenance due to CBM resulting in estimated annual savings of PKR 0.43 Billion annually. - Computed annual PKR 0.14 Million labour cost saving due to preventive maintenance’s cost benefit analysis - Performed CBA on Breakdown Maintenance of 7 manufacturing plants resulting in 50% savings in breakdown maintenance cost after successful implementation of CBM. - Saved PKR 0.17 Million by eliminating outsource emissions testing of 63 chimney’s spread across 9 plants to satisfy (SEQS) by conducting them internally. - Analysed and proposed annual electrical and natural gas consumption savings of 91.83 MW and 10,622 MMBTU resulting in PKR 3.2 Million and PKR 0.4 Million respectively; annually, upon successful implementation of CBM. - Planning and undertaking scheduled maintenance. - Supervised a 20 member technical team, created and implemented maintenance procedures. Show less

    • Pakistan
    • Chemical Manufacturing
    • 100 - 200 Employee
    • Mechanical Supervisor
      • Jan 2019 - Jan 2019

      Worked for a month during the Turnaround of Urea Plant. • Directed & Supervised a team of 35 personnel under the guidance of senior Mechanical Engineer. • Read & Understood Engineering Drawings to understand plant facility. • Maintain the supply of materials required to maintain machines & equipment. • Optimized and managed Manpower according to requirement. • Ensured the implementation of Safety Procedures & Policies. Worked for a month during the Turnaround of Urea Plant. • Directed & Supervised a team of 35 personnel under the guidance of senior Mechanical Engineer. • Read & Understood Engineering Drawings to understand plant facility. • Maintain the supply of materials required to maintain machines & equipment. • Optimized and managed Manpower according to requirement. • Ensured the implementation of Safety Procedures & Policies.

    • Pakistan
    • 1 - 100 Employee
      • Mar 2017 - Sep 2018

      International Student formula racing competition (FSAE) Formula North held in Barrie, Canada.• Led a 9 member team to build a formula style racing car, being the first ever South Asian team to compete at Formula North in June 2018. • Designed a complete Intake System under the FSAE Rules.• Designed, fabricated & assembled complete Powertrain, Drivetrain & Chassis.• Overhauling of CBR-F4i 600cc engine and tuning of engine under the FSAE Rules.• Designed & Fabricated 4-2-1 type Exhaust system for vehicle• Worked with the fabrication team to fabricate the Chassis. Show less

      • Jan 2016 - Feb 2017

      I took an active role as design team member, held interviews for recruits and gained hands on experience for the assembly process and parts fabrication as well for an international formula student competition

    • Pakistan
    • Airlines and Aviation
    • 700 & Above Employee
    • Internship Trainee
      • Jul 2017 - Aug 2017

      Worked as an Intern for almost a month in PIA’s Engineering Department, where I worked as a team member in different jobs gaining technical hands on experience of Engine, Turbine & Pneumatic overhauls. During this period, I learned a structure way to carry out an engineering job considering HSE measures Worked as an Intern for almost a month in PIA’s Engineering Department, where I worked as a team member in different jobs gaining technical hands on experience of Engine, Turbine & Pneumatic overhauls. During this period, I learned a structure way to carry out an engineering job considering HSE measures

Education

  • NED University of Engineering and Technology
    Bachelor of Engineering (B.E.), Mechanical Engineering
    2014 - 2018
  • DJ Science College
    Intermediate, Pre-Engineering
    2012 - 2014
  • Hira Public Secondary School
    Matriculation, Science
    2010 - 2012

Community

You need to have a working account to view this content. Click here to join now