Malik Abdul Azis

Network Solution & Infrastructure Engineer (HRB) at MyRepublic ID
  • Claim this Profile
Contact Information
Location
West Java, Indonesia, ID

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Indonesia
    • Telecommunications
    • 500 - 600 Employee
    • Network Solution & Infrastructure Engineer (HRB)
      • May 2022 - Present

      1. Detail survey along with contractor / subcon 2. Handle from start survey location, form survey, proposal device requirement for submit documentation to management 3. Design Topology Logical & Physical FTTx for new customer include material requirement 4. Calculate Capex&Opex (BOQ) device requirement Fiber Optic 5. Deskstudy Potential site New Customer (Apartment, Corporate, SME) 6. Coordination to all stake holder (Warehouse, Leader Team Sub-Region, Active Device Team & Operational Team) 7. Monitoring New Site Project from start survey to RFS Show less

    • Indonesia
    • Telecommunications
    • 700 & Above Employee
    • Project Design Engineer
      • May 2021 - May 2022

      1. Design route ISP/OSP used Bentley Software 2. Design migration HFC to FFTH Include Core Connection & Schematic 3. Calculate Capex & Opex (BOQ) device requirement 4. Coordination to field team for additional device & coordination to permit area team for the migration locations 5. Prepare drawing for survey team 1. Design route ISP/OSP used Bentley Software 2. Design migration HFC to FFTH Include Core Connection & Schematic 3. Calculate Capex & Opex (BOQ) device requirement 4. Coordination to field team for additional device & coordination to permit area team for the migration locations 5. Prepare drawing for survey team

    • Indonesia
    • IT Services and IT Consulting
    • 700 & Above Employee
    • Access Engineer
      • Feb 2021 - May 2021

      1. Coordination with contractor/subcon to achieve the target of SLA in accordance for installation dropwire cable to customer 2. Mapping route from GoogleEarth 3. Troubleshoot area if it happens interruption 4. Check Standart OLT (POP), ODC, ODP with OTDR & OPM Tools 1. Coordination with contractor/subcon to achieve the target of SLA in accordance for installation dropwire cable to customer 2. Mapping route from GoogleEarth 3. Troubleshoot area if it happens interruption 4. Check Standart OLT (POP), ODC, ODP with OTDR & OPM Tools

    • Indonesia
    • Telecommunications
    • 1 - 100 Employee
    • Fiber Optic Engineer
      • Feb 2018 - Jan 2021

      1. Coordination with contractor/subcon to achieve the target of SLA in accordance 2. Design & Mapping route from GoogleEarth 3. Design OSP & ISP FTTx, FTTH, FTTb Include Core Connection & Schematic 4. Calculate BOQ from actual output device 5. Arrange and Check BAST from contractor/subcon 6. Test standart connection with OTDR & OPM Tools 7. Project handle finished : - Design Maping FTTH Horizontal Residence Include Core Connection & Schematic - Survey & Design Pop Bogor, Pop Garut, Pop Tasik - Innercity Surakarta - Fiberisasi XL Jambi - Ultimate Java Backbone Cimahi - Bandung - Garut - Ultimate Java Backbone Wanareja - Cilacap - Purwokerto Show less

    • Indonesia
    • Technology, Information and Internet
    • 100 - 200 Employee
      • Apr 2014 - Jan 2018

      1. Detail survey along with contractor / subcon2. Handle from start survey location, design route MLD ISP/OSP (Autocad), form survey, proposal device requirement for presentation to customer3. Deskstudy Site FiberCo Project Indosat, FBB, Customer Indomaret & Alfamart All Region 4. Design Clustering Central Office (OLT) OSP & ISP FTTx, FTTH, FTTb Include Core Connection & Schematic5. Calculate Capex&Opex (BOQ) device requirement Fiber Optic6. Evaluation Active & Passive Device from subcon (ALU, NERA, HUAWEI, ZTE)7. Migration FBB (Re-Engineering unused core) Over GPON8. Audit Database Core Fiber Optic National9. Management Data UGIS Show less

      • Aug 2012 - Mar 2014

      1. Handle from start survey location, installation,UAT Testing speed internet2. Coordination to customer achieve the target of SLA3. Device configuration TP-Link, Switch (CISCO, FIBERHOME), Radio PTP/PTMP (RUCKUS & ALTAI), Access Point Indoor (ARUBA, CISCO, BELAIR)

Education

  • Universitas MH Thamrin
    S1, Information Technology
    2015 - 2019

Community

You need to have a working account to view this content. Click here to join now