Malcolm James

LNG SME OPERATIONS AND CONSTRUCTION MANAGER at Artelia Germany
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Slovakia, SK
Languages
  • some Dutch, some German and some French Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Goran Jojic

Malcolm is smart and dynamic person, committed to his work. He is very efficient Lead instrument construction engineer and Commissioning engineer . As a leader he is very objective-oriented and he gives excellent support to the team. Malcolm was responsible for clearance of punch lists and all pre-commissioning / commissioning work associated with complete plant start-up of the Residue hydrocracking plant in Slovnaft, Bratislava, Slovakia.I appreciate his analytical thinking and his ability to find solutions for any problem by improvements of processes

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Construction
    • 1 - 100 Employee
    • LNG SME OPERATIONS AND CONSTRUCTION MANAGER
      • Jan 2022 - Present

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Subject Matter Expert - construction and commissioning at Shell LNG
      • Apr 2002 - Present

      Retail LNG

    • Global Retail LNG - Execution focal point
      • Jul 2018 - Present

    • Field Specialist Consultant
      • Jul 2018 - Present

      Responsible for licencing, permitry, field engineering and construction and commissioning of LNG refueling stations across europe.

    • Shell Process Automation System Lead and advanced alarm implementation focal point
      • Jan 2011 - Sep 2011

      Extension to my previous position and now responsible for the worlds largest automation project with 100000 wired I/O points, including 28000 foundation fieldbus devices, other roles as below.

    • Advanced Alarm Management Focal point
      • Jun 2010 - Sep 2011

      Managing the role out and implementation of AAM/ACM/AEA across the QSGTL project. I am now managing the Process Automation Group for Advanced Alarm Management/ACM and AEA and other critical issues in Qatar. Across all contracts ~100000 wired I/O and ~450000 alarm points.

    • Senior consultant and engineer
      • Mar 2009 - Mar 2010

      Company representative for Main Automation Contract and lead of Shells Asset Delivery Team and Implementation Contactor FAT Coordinator, based in Honeywell's office in Newhouse, Scotland. Directly supervising and managing all activities for the FAT of the largest single automation contract ever attempted with 1118 system cabinets in Newhouse.Responsible to deliver the Process Automation System site wide to site, crossing all company and contractual boundaries to efficiently deliver the complete PAS FAT's for site construction. We had a large team in Newhouse peaked at over 200 engineers and testers with multiple contractors. I am the single full time Company representative responsible for this activity.

    • Consultant and senior engineer
      • Apr 2002 - Mar 2009

      I executed the role of client representative for the Pearl GTL project in Qatar initially based in London, then Scotland and then Qatar. I was responsible for technical assurance and system integration for the site wide control and telecommunication systems, with additional responsibility for inter-discipline coordination and telecommunications. Employed as a consultant in control and automation, instrumentation and telecommunications for worldwide projects for Shell and its partners. I have been responsible for all aspects of design, construction, commissioning, training, operations and maintenance of worldwide Shell operations. Engaged on Persian LNG (6 * 8MMTA), as project engineer coordinating the whole FEED document package as well as controlling my own discipline (Instrument and Telecommunication) work, this was executed in Yokohama, Japan. Previously engaged in projects for: Iran SMDS, Brunei LNG, Gabon Upstream Oil and Gas, Bintulu SMDS, Malaysia LNG and Mexico LNG, China gas transmission (WEP), Bolivia Gas, Bulgaria Oil refinery, Namibia Floating LNG (Kudu) and sub-sea development, Australia Floating LNG (Sunrise) and Nigeria LNG including several assignments to these locations. Some of these projects had very large utility systems for waste water treatment and generator systems up to 1500MW.The engagements have been in every aspect of a project from conceptual design through to start-up and initial operations. Including: HAZID, HAZOP and IPF (SIL Classification).I was a member of the Shell DEP author team so have been involved in revising and preparing new and revised company standards and methods. I have been engaged to train Shell staff, its partners and contract personnel in use and development of Shell in house standards, tools and methods.During this time I was the telecommunication focal point for Shell Global Solutions.

    • Independent project or construction engineer/manager
      • Jan 2018 - Jun 2018

      Construction and engineering consultant Construction and engineering consultant

    • United Kingdom
    • Utilities
    • 300 - 400 Employee
    • Nuclear Construction director, started as E&I construction manager
      • Oct 2015 - Dec 2017

      Construction director for a new Nuclear reprocessing facility £900m, team size maximum ~1800 across all disciplines. Started as E&I construction manager, promoted to deputy construction director within 6months then construction director. Fully trained iand experienced n the nuclear site licence conditions, attended regular meetings face to face with ONR, dealing with safety issues and emergency planning, CDM trained and C1 nuclear security clearance.Extensively involved and responsible for site QHSSE, all construction and re-engineering , HVAC and containment including detailed management, planning and schedule activities using Primavera P6 and MSP, setting of KPI's, managed extensive change, incentives, supply chain, claim management and negotiation.

    • Germany
    • Oil and Gas
    • 700 & Above Employee
    • I&C Commissioning Manager
      • Jan 2015 - Oct 2015

      Engaged fo Commissioning gas processing import terminal, mostly supported construction with resolving detailed design issues and implementation. Engaged fo Commissioning gas processing import terminal, mostly supported construction with resolving detailed design issues and implementation.

    • United Kingdom
    • Construction
    • 400 - 500 Employee
    • Project manager and Asian region Manager
      • Jul 2013 - Nov 2014

      Managing a diverse team of expatriates and local staff in concept design, detail design, construction and completions and Management Of Change on a brownfield control and automation rejuvenation project.Promoted company interests across the region and negotiated supply chain management for engineering and construction services and equipment supplies. Managing a diverse team of expatriates and local staff in concept design, detail design, construction and completions and Management Of Change on a brownfield control and automation rejuvenation project.Promoted company interests across the region and negotiated supply chain management for engineering and construction services and equipment supplies.

    • Oil and Gas
    • 700 & Above Employee
    • E, I and T lead engineer
      • Mar 2013 - Jul 2013

      Previously working for BG on the Jackdaw project based in Reading UK. This was a sour gas process and material selection to suit. Previously working for BG on the Jackdaw project based in Reading UK. This was a sour gas process and material selection to suit.

    • Oil and Gas
    • 700 & Above Employee
    • Project Engineer
      • Jul 2012 - Mar 2013

      Company representative for Auk Redevelopment project responsibel for E and I and Telecom, Engaged heavily in layout and electrical engineering design issues, with bridge link to new riser platform. Functional and process safety reviews and flow assurance. Company representative for Auk Redevelopment project responsibel for E and I and Telecom, Engaged heavily in layout and electrical engineering design issues, with bridge link to new riser platform. Functional and process safety reviews and flow assurance.

    • Denmark
    • Oil and Gas
    • 700 & Above Employee
    • Head of Electrical and Automation departments
      • Sep 2011 - Jul 2012

      Employed as senior general manager, and head of Electrical, Automation and Telecommunications.I have 14 direct reports and 2 trainees. Fundemental in staff reviews and training. Game changer for Funtional and process safety according to IEC 61511. Detailed knowledge of Norsok standards applied where operating for Statoil. I reported to the director of engineering. Employed as senior general manager, and head of Electrical, Automation and Telecommunications.I have 14 direct reports and 2 trainees. Fundemental in staff reviews and training. Game changer for Funtional and process safety according to IEC 61511. Detailed knowledge of Norsok standards applied where operating for Statoil. I reported to the director of engineering.

    • Switzerland
    • Automation Machinery Manufacturing
    • 700 & Above Employee
    • Lead Instrument and Electrical engineer
      • Jan 2001 - Apr 2002

      Lead Instrument and Electrical engineer for Total Fina Elf project for Miocene development offshore Angola. I was responsible for all E and I and telecommunications activities for a 370,000 tonne FPSO.I was previously the senior instrument engineer (and Deputy Lead) on a Shell FLNG project. I was been responsible for the complete instrument and control system and telecommunication systems for the BDP/BDEP for Shells first FLNG production and Marine controls, berthing aid systems and control, telecom and safety systems including HAZID/HAZOP, including loading arms, turrets and subsea and flow assurance. In depth involvement with Fire and Gas sytems and detector selection and layout.Senior engineer on the Total Fina Elf Dalia FPSO Project for Angola, responsible for engineering and contractual interfacing and general instrumentation and telecommunication detail engineering for production and Marine control, berthing aids and loading arms and safety systems and for the oil processing plant mounted on a 340,000 tonnes, 300 metre floating production storage and offloading platform, including sub-sea systems and risers, including flow assurance..

    • Oil and Gas
    • 100 - 200 Employee
    • Principal instrument and control engineer
      • May 2000 - Dec 2000

      Engaged as consultant for a new LNG terminal project. Responsible for engineering and design consultancy for all LNG terminal facilities, Ship LNG loading and unloading facilities, LNG storage, Boil off gas, vaporisers, send out facilities, analysers and all utilities. Bid evaluation, design and engineering of all engineered equipment, all safety and control systems associated with a state of the art LNG terminal. Engaged as consultant for a new LNG terminal project. Responsible for engineering and design consultancy for all LNG terminal facilities, Ship LNG loading and unloading facilities, LNG storage, Boil off gas, vaporisers, send out facilities, analysers and all utilities. Bid evaluation, design and engineering of all engineered equipment, all safety and control systems associated with a state of the art LNG terminal.

    • Japan
    • Industrial Machinery Manufacturing
    • 700 & Above Employee
    • Instrument superintendent
      • Aug 1999 - May 2000

      Employed as Lead instrument construction engineer and commissioning engineer for the Slovnaft Block 57 Hydro-cracker projects (LC finer – Lummus process). Responsible for clearance of punch lists and all pre-commissioning/commissioning work associated with complete plant start-up in Bratislava, Slovakia. Including the implementation/integration and start-up of all systems and re-engineering of new solutions on site. This include the refractory dryers on fired waste heat recovery boilers. Employed as Lead instrument construction engineer and commissioning engineer for the Slovnaft Block 57 Hydro-cracker projects (LC finer – Lummus process). Responsible for clearance of punch lists and all pre-commissioning/commissioning work associated with complete plant start-up in Bratislava, Slovakia. Including the implementation/integration and start-up of all systems and re-engineering of new solutions on site. This include the refractory dryers on fired waste heat recovery boilers.

    • United States
    • Defense and Space Manufacturing
    • 700 & Above Employee
    • Construction superintendent Instrumentation
      • Dec 1997 - Aug 1999

      Where I was employed as senior instrument construction superintendent on the EFPA Slovnaft Block 66 FCC (UOP process), MTBE, Alkylation and Merox (UOP) units. Overall responsibility for the design (part IEC part Russian GOSH standards) and engineering in The Hague NL/Tampa USA and then construction and later commissioning of all systems in Bratislava, Slovakia, where I was also directly responsible for the concept and implementation of a direct labour hire this eventually proved to save almost 40% of installation costs versus the lowest traditional sub-contractor bid. My duties have also covered developing P&ID’s, DCS, all instrument engineering tools, specifications, sub-contracts, evaluating contractors, bid evaluation, detail engineering, requisitioning and estimating and all contract negotiations. I was before this engaged on DSM Dexst NAK4 and Urea UF2 projects in the Netherlands and on 6 months on assignment in Germany (with Uhde) as the lead and senior control-instrument engineer. My duties have covered developing P&ID’s, DCS, FGS, and ESD specifications, Sub-Contracts, evaluating bids, requisitioning and estimating and contract negotiations.

    • senior instrument construction superintendent
      • Jun 1995 - Aug 1999

      on the EFPA Slovnaft Block 66 FCC (UOP process), MTBE, Alkylation and Merox (UOP) units. Overall responsibility for the design and engineering in The Hague NL/Tampa USA and then construction and later commissioning of all systems; where I was also directly responsible for the concept and implementation of a direct labour hire this eventually proved to save almost 40% of installation costs versus the lowest traditional sub-contractor bid. My duties have also covered developing P&ID's, DCS, all instrument engineering tools, specifications, sub-contracts, evaluating contractors, bid evaluation, detail engineering, requisitioning and estimating and all contract negotiations. Previously engaged on DSM Dexst NAK4 and Urea UF2 projects in the Netherlands and on 6 months on assignment in Germany (with Uhde) as the lead and senior control-instrument engineer. My duties have covered developing P&ID's, DCS, FGS, and ESD specifications, Sub-Contracts, evaluating bids, requisitioning and estimating and contract negotiations.

    • Lead instrument construction engineer and commissioning engineer
      • Dec 1997 - Aug 1999

      LC Finer (Lummus process). Responsible for clearance of punch lists and all pre-commissioning/commissioning work associated with complete plant start-up; Including implementation/integration and start-up of all systems. Re-engineering of new solutions on site. LC Finer (Lummus process). Responsible for clearance of punch lists and all pre-commissioning/commissioning work associated with complete plant start-up; Including implementation/integration and start-up of all systems. Re-engineering of new solutions on site.

    • Netherlands
    • Industrial Machinery Manufacturing
    • 300 - 400 Employee
    • senior Instrument Engineer
      • Nov 1992 - Jun 1995

      assigned to the Shell Per+ project and worked on a New Power Generation Plant. My duties have covered writing the control and safeguarding narratives, developing PEFS, specifications, DCS, Sub-contracts, evaluating bids, requisitioning and estimating and contract negotiations. Assignment to New Jersey USA. assigned to the Shell Per+ project and worked on a New Power Generation Plant. My duties have covered writing the control and safeguarding narratives, developing PEFS, specifications, DCS, Sub-contracts, evaluating bids, requisitioning and estimating and contract negotiations. Assignment to New Jersey USA.

    • United States
    • Defense and Space Manufacturing
    • 700 & Above Employee
    • senior engineer
      • Jul 1992 - Nov 1992

      senior, lead and construction supervisor senior, lead and construction supervisor

    • Instrument/Electrical Project Engineer
      • Feb 1991 - Jun 1992

      Multiple international e and I roles Multiple international e and I roles

    • Instrument Lead Engineer
      • Jan 1989 - Jan 1990

      Dupont and Hyundai Dupont and Hyundai

    • Capital project engineer
      • Jan 1984 - Jan 1989

      Site engineer power station Site engineer power station

Education

  • Trinity College
    BSc, Control and Instrumentation
    2000 - 2002

Community

You need to have a working account to view this content. Click here to join now