MALAY GHOSH

Resident Construction Manager at Deepak Construction - India
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
IN
Languages
  • English -
  • Bengali -
  • Hindi -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • India
    • Real Estate
    • 1 - 100 Employee
    • Resident Construction Manager
      • Jul 2015 - Present

      Monitoring entire project , planning , attend meeting , coordinate with contractor and client etc. Monitoring entire project , planning , attend meeting , coordinate with contractor and client etc.

    • Resident Construction Manager
      • Jul 2015 - Present

    • Construction Manager
      • Jul 2015 - Present

    • India
    • Construction
    • 700 & Above Employee
    • Assistant Construction Manager
      • Aug 2011 - Jun 2015

      Responsibilities - Structure Coordination & Monitoring erection & fabrication of Steel.Jhansi railway workshop extension projectResponsibilities - Coordination & Monitoring erection & fabrication of piping

    • Assistant Construction Manager
      • Jun 2010 - Aug 2011

      Project: SMS FORGING SHOPResponsibilities - Coordination & Monitoring of Fabrication and erection of Steel Structure for steel plant:Project- Expansion of existing plant of Maruti Suzuki India Limited (MSIL C LINE), Manesar, GurgaonResponsibilities - Coordination & Monitoring erection & fabrication of Steel Structure

    • India
    • Construction
    • 700 & Above Employee
    • Sr. Engineer
      • Apr 2009 - Mar 2010

      Responsibilities: Coordination & Supervision of following activities: • Monitoring Fabrication of structural steel (Pipe Rack, Compressor shed & Technical Structure around 4,000 MT). • Monitoring of Fit up, Weld visual, Blasting-Painting,& WQT Responsibilities: Coordination & Supervision of following activities: • Monitoring Fabrication of structural steel (Pipe Rack, Compressor shed & Technical Structure around 4,000 MT). • Monitoring of Fit up, Weld visual, Blasting-Painting,& WQT

    • India
    • Oil and Gas
    • 700 & Above Employee
    • Supervising Senior
      • Oct 2007 - Mar 2009

      Completed Vadinar Bina Pipe Line Project: Coordination & Supervision of following activities: • ROU Grading • Trenching Stringing of pipes • Mainline Welding Joint coating • Preparation of pipe book • Lowering of pipe string • Tie-in-welding • OFC laying • Back filling of pipeline • Restoratio & Hydrostatic-test Completed project for(BHARAT OMAN REFINERIES LTD)at Bina Refinery for monitoring of mechanical job(Piping and Structural)of following: 1. Cryogenic Nitrogen Plant. 2. Cooling tower. 3. Raw water treatment Plant. 4. Fire Proofing. 5. Erection & Fabrication of Air Fin Cooler. 6. Insulation of Column Show less

    • India
    • Oil and Gas
    • 700 & Above Employee
    • Site In-Charge
      • Jun 2006 - Sep 2007

      Project name: Digboi Refinery Project/Numaligarh Refinery Project, Assam. Responsibilities: Coordination & Supervision of following activities: (i) Fabrication, Erection, Testing, Painting of fixed cum floating roof Oil storage tank (Dia- 24 m. & Height 14 m.) related Piping at Digboi Refinery. (ii) Structural Job (Super Structure) (iii) Crude Oil Piping. Project name: Digboi Refinery Project/Numaligarh Refinery Project, Assam. Responsibilities: Coordination & Supervision of following activities: (i) Fabrication, Erection, Testing, Painting of fixed cum floating roof Oil storage tank (Dia- 24 m. & Height 14 m.) related Piping at Digboi Refinery. (ii) Structural Job (Super Structure) (iii) Crude Oil Piping.

    • Site Engineer
      • Jun 2005 - Jun 2006

      Project name: Paradeep Haldia CrudeOil Pipe Line Project, Orissa. Responsibilities: Coordination & Supervision of following activities: i) Piping Job (Carbon Steel-AG/UG) , fabrication & erection of steel structure ii) Equipment erection iii) F.R.P. Piping Project name: Paradeep Haldia CrudeOil Pipe Line Project, Orissa. Responsibilities: Coordination & Supervision of following activities: i) Piping Job (Carbon Steel-AG/UG) , fabrication & erection of steel structure ii) Equipment erection iii) F.R.P. Piping

    • Asstt. Engineer (FireFighting System)
      • Oct 1998 - Apr 2005

      Responsibilities: Monitoring of Fire protection &Detection System / fabrication and erection of steel structure. (i) Hydrant system (ii) Cooling System (iii) Sprinkler system (iv) Foam System (v) Carbon Steel Piping Responsibilities: Monitoring of Fire protection &Detection System / fabrication and erection of steel structure. (i) Hydrant system (ii) Cooling System (iii) Sprinkler system (iv) Foam System (v) Carbon Steel Piping

Education

  • Naihati Narandra Vidiyaniketan, Kolkata
    Heigher secondery, science
    1991 - 1994
  • Bhatpara Amar Krishna Pathshala
    class 10th
    1982 - 1991

Community

You need to have a working account to view this content. Click here to join now