Maksim Kruglik

Civil/Structure Superintendent at CASALE PROJECT a. s.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Krasnodar, Russia, RU
Languages
  • Русский Native or bilingual proficiency
  • Английский Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Peter Swan

Maxim is a hard working Specialist, who knows and understands the professional requirements of his work, and is a pleasure to work with.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • NAKS Certificate - II Level – СВР-10АЦ-II-02631
    NAKS
    Nov, 2019
    - Oct, 2024
  • C-27-189566 - Identification number of the NOSTROY Specialist
    NOSTROY
    Jan, 2019
    - Oct, 2024
  • Health, Safety & Environmental Guide for Supervisor
    Tecnicas Reunidas
    May, 2015
    - Oct, 2024
  • Advanced training "Construction control" (Especially dangerous, technically complex and unique objects) -2017
    TekhnoProgress
  • Advanced training "Construction control" - Industrial, Energy Security and Safety of Hydraulic Structures (2017)
    TekhnoProgress
  • Essential of First Aid (2012)
    Technip
  • Non-destructive testing specialist II level - 2019
    TekhnoProgress
  • Technical supervision over construction process. Quality Control over Installation and Construction Activities, Materials, Processes and Services. Function of General Contractor (2011)
    Tecnicas Reunidas
  • Visual inspection control (2019)
    TekhnoProgress

Experience

    • Czechia
    • Industrial Machinery Manufacturing
    • 100 - 200 Employee
    • Civil/Structure Superintendent
      • Aug 2022 - Present

      • Management of the construction process of the following types of construction works: Early work, Pilling works, pilling test, Underground works, Civil works; Carefully monitoring of Subcontractor in terms of schedule and quality. Recovery actions whenever detect deviation; Planning and analysis of schedule construction works, labor resources, supplier’s material and technical documentation delivery schedule; Detect and rectify design errors, make the necessary changes; Implement acceptance of work performed, organization of inspections; Ensuring compliance with the technological sequences of construction; Coordination between the different types of construction works; Work with the project and executive documentation; ITP development (Inspection Test Plan); Preparation of Method of Work Execution and Flow Chart.• Verification of the scope of work performed for compliance with the QPL• Providing of safe work performance and control over compliance with technical, environmental and fire safetyAchievements:• Organization of Temporary Site Facilities• Organization of construction works Show less

    • Lead Civil/Structure Supervisor
      • May 2019 - Aug 2022

      • Management of the construction process of the following types of construction works: Early work, Pilling works, Underground works, Civil works (including Slip formwork for Prilling Tower), Steel Structures erection, Equipment installation in the Prilling Tower, Elevator installation, Urea Conveyor installation; Carefully monitoring of Subcontractor in terms of schedule and quality. Recovery actions whenever detect deviation; Planning and analysis of schedule construction works, labor resources, supplier’s material and technical documentation delivery schedule; Detect and rectify design errors, make the necessary changes; Implement acceptance of work performed, organization of inspections; Ensuring compliance with the technological sequences of construction; Coordination between the different types of construction works; Work with the project and executive documentation; ITP development (Inspection Test Plan); Preparation of Method of Work Execution and Flow Chart; • Verification of the scope of work performed for compliance with the QPL• Providing of safe work performance and control over compliance with technical, environmental and fire safetyAchievements:• Successful organization of slipform concreting of the Prilling Tower and installation of urea production equipment.• Construction and installation works completed in accordance with the scheduled Show less

    • Italy
    • Industrial Machinery Manufacturing
    • 100 - 200 Employee
    • Lead Construction Supervisor
      • Sep 2016 - May 2019

      • Management of the construction process of the following types of construction works: Civil works, Steel Structures erection, installation of Reformer, Cooling Tower and Flare system assembly; Carefully monitoring of Subcontractor in terms of schedule, quality and cost. Recovery actions whenever detect deviation; Planning and analysis of schedule construction works, labor resources, supplier’s material and technical documentation delivery schedule; Detect and rectify design errors, make the necessary changes; Implement acceptance of work performed, organization of inspections; Ensuring compliance with the technological sequences of construction; Coordination between the different types of construction works; Work with the project and executive documentation; ITP development (Inspection Test Plan); Preparation of Method of Work Execution and Flow Chart. • Providing of safe work performance and control over compliance with technical, environmental and fire safety Achievements: • Organization of construction works on the Main Ammonia Plant and completion in accordance with the construction schedule. • Reference Letter Show less

    • Construction
    • 1 - 100 Employee
    • Piling & Civil work Supervisor
      • Nov 2015 - Sep 2016

      • Management of the construction process of the following types of construction works: Early works (including Pile driving, Static pile test, soil thermostabilizing), Civil works (including Slip formwork), Preliminary works for Modules installation; Carefully monitoring of Subcontractor in terms of schedule, quality and cost. Recovery actions whenever detect deviation; Planning and analysis of schedule construction works, labor resources, Supplier’s material and technical documentation delivery schedule; Detect and rectify design errors, make the necessary changes; Implement acceptance of work performed, organization of inspections; Ensuring compliance with the technological sequences of construction; Coordination between the different types of construction works; Work with the project and executive documentation; ITP development (Inspection Test Plan); Preparation of Method of Work Execution and Flow Chart. • Providing of safe work performance and control over compliance with technical, environmental and fire safety Achievements: Organization of construction works and completion in accordance with the construction schedule. • Successful organization of slipform concreting • Timely preparation of the site for the reception and installation of enlarged modules. Show less

    • Mechanical Or Industrial Engineering
    • 1 - 100 Employee
    • Civil & Steel Structures Supervisor
      • Apr 2014 - Nov 2015

      • Management of the construction process of the following types of construction works: Civil works and Steel Structures erection; Carefully monitoring of Subcontractor in terms of schedule and quality; Planning and analysis of schedule construction works, labor resources, Supplier’s material delivery schedule; Detect and rectify design errors, make the necessary changes; Implement acceptance of work performed, organization of inspections; Ensuring compliance with the technological sequences of construction; Coordination between the different types of construction works; Work with the project and executive documentation; ITP development (Inspection Test Plan); Preparation of Method of Work Execution and Flow Chart; • Providing of safe work performance and control over compliance with technical, environmental and fire safetyAchievements:• Organization of construction works on the hydrogen production Plant and completion in accordance with the construction schedule.• Reference Letter Show less

    • Steel Structures Supervisor
      • Feb 2011 - Apr 2014

      • Management of the construction process of the Steel Structures erection; • Providing of safe work performance and control over compliance with technical, environmental and fire safetyAchievements:• Resumption of construction and installation work has been ensured after the replacement of the main subcontractor in 2010 and the completion of construction in accordance with the construction schedule• Reference Letter

    • Civil Engineering
    • 1 - 100 Employee
    • Steel Structures Supervisor
      • Aug 2008 - Feb 2011

      • Management of the construction process of the Steel Structures erection; • Providing of safe work performance and control over compliance with technical, environmental and fire safety Achievements: • Construction and installation works completed in accordance with the scheduled • Reference Letter • Management of the construction process of the Steel Structures erection; • Providing of safe work performance and control over compliance with technical, environmental and fire safety Achievements: • Construction and installation works completed in accordance with the scheduled • Reference Letter

Education

  • Pacific State University
    Engineer's degree, Industrial and Civil Construction

Community

You need to have a working account to view this content. Click here to join now