Maksim Kruglik
Civil/Structure Superintendent at CASALE PROJECT a. s.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Русский Native or bilingual proficiency
-
Английский Limited working proficiency
Topline Score
Bio
Peter Swan
Maxim is a hard working Specialist, who knows and understands the professional requirements of his work, and is a pleasure to work with.
Peter Swan
Maxim is a hard working Specialist, who knows and understands the professional requirements of his work, and is a pleasure to work with.
Peter Swan
Maxim is a hard working Specialist, who knows and understands the professional requirements of his work, and is a pleasure to work with.
Peter Swan
Maxim is a hard working Specialist, who knows and understands the professional requirements of his work, and is a pleasure to work with.
Credentials
-
NAKS Certificate - II Level – СВР-10АЦ-II-02631
NAKSNov, 2019- Oct, 2024 -
C-27-189566 - Identification number of the NOSTROY Specialist
NOSTROYJan, 2019- Oct, 2024 -
Health, Safety & Environmental Guide for Supervisor
Tecnicas ReunidasMay, 2015- Oct, 2024 -
Advanced training "Construction control" (Especially dangerous, technically complex and unique objects) -2017
TekhnoProgress -
Advanced training "Construction control" - Industrial, Energy Security and Safety of Hydraulic Structures (2017)
TekhnoProgress -
Essential of First Aid (2012)
Technip -
Non-destructive testing specialist II level - 2019
TekhnoProgress -
Technical supervision over construction process. Quality Control over Installation and Construction Activities, Materials, Processes and Services. Function of General Contractor (2011)
Tecnicas Reunidas -
Visual inspection control (2019)
TekhnoProgress
Experience
-
CASALE PROJECT a. s.
-
Czechia
-
Industrial Machinery Manufacturing
-
100 - 200 Employee
-
Civil/Structure Superintendent
-
Aug 2022 - Present
• Management of the construction process of the following types of construction works: Early work, Pilling works, pilling test, Underground works, Civil works; Carefully monitoring of Subcontractor in terms of schedule and quality. Recovery actions whenever detect deviation; Planning and analysis of schedule construction works, labor resources, supplier’s material and technical documentation delivery schedule; Detect and rectify design errors, make the necessary changes; Implement acceptance of work performed, organization of inspections; Ensuring compliance with the technological sequences of construction; Coordination between the different types of construction works; Work with the project and executive documentation; ITP development (Inspection Test Plan); Preparation of Method of Work Execution and Flow Chart.• Verification of the scope of work performed for compliance with the QPL• Providing of safe work performance and control over compliance with technical, environmental and fire safetyAchievements:• Organization of Temporary Site Facilities• Organization of construction works Show less
-
-
Lead Civil/Structure Supervisor
-
May 2019 - Aug 2022
• Management of the construction process of the following types of construction works: Early work, Pilling works, Underground works, Civil works (including Slip formwork for Prilling Tower), Steel Structures erection, Equipment installation in the Prilling Tower, Elevator installation, Urea Conveyor installation; Carefully monitoring of Subcontractor in terms of schedule and quality. Recovery actions whenever detect deviation; Planning and analysis of schedule construction works, labor resources, supplier’s material and technical documentation delivery schedule; Detect and rectify design errors, make the necessary changes; Implement acceptance of work performed, organization of inspections; Ensuring compliance with the technological sequences of construction; Coordination between the different types of construction works; Work with the project and executive documentation; ITP development (Inspection Test Plan); Preparation of Method of Work Execution and Flow Chart; • Verification of the scope of work performed for compliance with the QPL• Providing of safe work performance and control over compliance with technical, environmental and fire safetyAchievements:• Successful organization of slipform concreting of the Prilling Tower and installation of urea production equipment.• Construction and installation works completed in accordance with the scheduled Show less
-
-
-
Maire Tecnimont
-
Italy
-
Industrial Machinery Manufacturing
-
100 - 200 Employee
-
Lead Construction Supervisor
-
Sep 2016 - May 2019
• Management of the construction process of the following types of construction works: Civil works, Steel Structures erection, installation of Reformer, Cooling Tower and Flare system assembly; Carefully monitoring of Subcontractor in terms of schedule, quality and cost. Recovery actions whenever detect deviation; Planning and analysis of schedule construction works, labor resources, supplier’s material and technical documentation delivery schedule; Detect and rectify design errors, make the necessary changes; Implement acceptance of work performed, organization of inspections; Ensuring compliance with the technological sequences of construction; Coordination between the different types of construction works; Work with the project and executive documentation; ITP development (Inspection Test Plan); Preparation of Method of Work Execution and Flow Chart. • Providing of safe work performance and control over compliance with technical, environmental and fire safety Achievements: • Organization of construction works on the Main Ammonia Plant and completion in accordance with the construction schedule. • Reference Letter Show less
-
-
-
South Tambey LNG
-
Construction
-
1 - 100 Employee
-
Piling & Civil work Supervisor
-
Nov 2015 - Sep 2016
• Management of the construction process of the following types of construction works: Early works (including Pile driving, Static pile test, soil thermostabilizing), Civil works (including Slip formwork), Preliminary works for Modules installation; Carefully monitoring of Subcontractor in terms of schedule, quality and cost. Recovery actions whenever detect deviation; Planning and analysis of schedule construction works, labor resources, Supplier’s material and technical documentation delivery schedule; Detect and rectify design errors, make the necessary changes; Implement acceptance of work performed, organization of inspections; Ensuring compliance with the technological sequences of construction; Coordination between the different types of construction works; Work with the project and executive documentation; ITP development (Inspection Test Plan); Preparation of Method of Work Execution and Flow Chart. • Providing of safe work performance and control over compliance with technical, environmental and fire safety Achievements: Organization of construction works and completion in accordance with the construction schedule. • Successful organization of slipform concreting • Timely preparation of the site for the reception and installation of enlarged modules. Show less
-
-
-
Tecnicas Reunidas
-
Mechanical Or Industrial Engineering
-
1 - 100 Employee
-
Civil & Steel Structures Supervisor
-
Apr 2014 - Nov 2015
• Management of the construction process of the following types of construction works: Civil works and Steel Structures erection; Carefully monitoring of Subcontractor in terms of schedule and quality; Planning and analysis of schedule construction works, labor resources, Supplier’s material delivery schedule; Detect and rectify design errors, make the necessary changes; Implement acceptance of work performed, organization of inspections; Ensuring compliance with the technological sequences of construction; Coordination between the different types of construction works; Work with the project and executive documentation; ITP development (Inspection Test Plan); Preparation of Method of Work Execution and Flow Chart; • Providing of safe work performance and control over compliance with technical, environmental and fire safetyAchievements:• Organization of construction works on the hydrogen production Plant and completion in accordance with the construction schedule.• Reference Letter Show less
-
-
Steel Structures Supervisor
-
Feb 2011 - Apr 2014
• Management of the construction process of the Steel Structures erection; • Providing of safe work performance and control over compliance with technical, environmental and fire safetyAchievements:• Resumption of construction and installation work has been ensured after the replacement of the main subcontractor in 2010 and the completion of construction in accordance with the construction schedule• Reference Letter
-
-
-
ECC-VECO
-
Civil Engineering
-
1 - 100 Employee
-
Steel Structures Supervisor
-
Aug 2008 - Feb 2011
• Management of the construction process of the Steel Structures erection; • Providing of safe work performance and control over compliance with technical, environmental and fire safety Achievements: • Construction and installation works completed in accordance with the scheduled • Reference Letter • Management of the construction process of the Steel Structures erection; • Providing of safe work performance and control over compliance with technical, environmental and fire safety Achievements: • Construction and installation works completed in accordance with the scheduled • Reference Letter
-
-
Education
-
Pacific State University
Engineer's degree, Industrial and Civil Construction