Makhful Adhim
Jr RNO at PT.GCI Indonesia (JIESAI)- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
PT.GCI Indonesia (JIESAI)
-
Telecommunications
-
300 - 400 Employee
-
Jr RNO
-
Jan 2015 - Present
• Technical Support for SSV and Cluster for outdoor and indoor cell using TEMS Investigation 16.3.3. and Volte Test Using Nemo Outdoor 7. • Monitoring SSV and Cluster PAC Optimization Drive test progress. • Analyzing DT Result from SSV and Cluster PAC Optimization and make optimization suggestion for bad spot. • Make Report and SSV and Cluster PAC Optimization Using TEMS Discovery 10.08 and Report Volte Using Nemo Analysis 7. • Responsible to achieve KPI value (RRC Connection Request Success Rate, ERAB-Drop Rate, HOSR, PDCP DL Throughput, PDCP UL Throughput). • Review SSV and PAC Cluster Optimization Report with ZTE and Smartfren. • Auditing Neighbor for Achieve Handover Success Rate. • Coordinate Cluster PAC owner for achieve the target from Customer. Show less
-
-
-
PT.Nexwave
-
Surabaya dan Sekitarnya, Jawa Timur, Indonesia
-
DT Engineer
-
Jun 2010 - Jan 2015
• Performing RF Network Drive Test Using Nemo Outdoor and TEMS Investigation. • Cut over Drive test measurement and troubleshoot. • Tuning test to optimize Coverage. This measurement must be analyzed and repeated until the accepted quality is reached. • Investigate Call Drop, Call Failed, Handover, and Coverage Problem. • Making report using Nemo Analyzer, Actix and Mapinfo. • Support and Coordinate with PLO Engineer to increase acceptance site. • Coordinate with Team Project to Solve bad quality RF Issue. • Customer Complain Handling. • Support to review site with PIC Indosat. Show less
-
-
-
PT.MayaSakti
-
Surabaya
-
BTS Engineer
-
Jan 2010 - Jun 2010
• Coordinate with Team Project to Install Modul EVDO Esia. • Field Test using QXDM for ATP after Installing Modul EVDO. • Coordinate with PIC ESIA For Acceptance(ATP) EVDO site. • Make Report Field Test EVDO ESIA. • Calibrate Base Station (BTS) to Support MBC(Multi Band Cell). • Commissioning BTS After Calibration MBC Support. • Install BBU Modul at BTS rack • Coordinate with Team Project to Install Modul EVDO Esia. • Field Test using QXDM for ATP after Installing Modul EVDO. • Coordinate with PIC ESIA For Acceptance(ATP) EVDO site. • Make Report Field Test EVDO ESIA. • Calibrate Base Station (BTS) to Support MBC(Multi Band Cell). • Commissioning BTS After Calibration MBC Support. • Install BBU Modul at BTS rack
-
-
Education
-
PENS-ITS
D4 Telecommunications Engineering