Majid Javadi

Senior Electrical Engineer at Thompson Controls Pty Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Woodcroft, New South Wales, Australia, AU
Languages
  • English Full professional proficiency
  • Persian Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Member of the Institution of Engineers Australia
    Engineers Australia
    Jan, 2013
    - Nov, 2024

Experience

    • Australia
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Senior Electrical Engineer
      • Dec 2022 - Present

    • United Kingdom
    • Industrial Machinery Manufacturing
    • 700 & Above Employee
    • Electrical Project Engineer
      • Dec 2017 - Dec 2022

      Projects: 2*580kW ventilation fans for Ramp 5 Ensham Coal mine. 2*260kW ventilation fans for Moranbah North Coal mine (Anglo American). 2*1200kW ventilation fans for Carborough Downs Coal mine (Fitzroy). 4*1080kW ventilation fans forMoranbah North Coal mine (Anglo American). 2*3050kW ventilation fans for Tanami mine (Newmont). 2*1200kW ventilation fans for Ironbark Coal mine (Fitzroy). Responsibilities: Providing all detailed designs including but not limited to: MV SLD, LV SLD & MCC, PLC wiring diagrams, etc. Equipment and supplier evaluation and selection. Developing ITPs and test sheets. Preparing and developing of electrical schematics and P&ID drawings. Providing Cable calculations & schedule, Load list, Instrument list, I/O list, etc. Liaising with the client and managing suppliers and manufacturers. Inspecting and attending FAT of LV switchboards, control panels and switchrooms. Participating in site supervision and inspection during installation and commissioning. Providing technical support during procurement, manufacturing, installation & commissioning. Coordinate and conduct fan system commissioning. Providing preliminary design and equipment selection for tendering and preparation of tender documentation.

    • Australia
    • Environmental Services
    • 1 - 100 Employee
    • Electrical Project Engineer
      • Jun 2012 - Jul 2016

      Project: - Commercial tyre recycling plant in Warren/NSW Responsibilities: - Served as the only electrical engineer reporting to operations project manager and director, successfully designed all electrical, instrumentation and control system from scratch. - Designed Overall SLD, main switchboard SLD, schematics using Solidworks and AutoCAD software. - Designed all MCC’s (MCC1 to MCC10) schematics, wiring & terminal diagrams, remote I/O’s using Solidworks. - Calculated earthing and prepared earthing layout and lightning using AutoCAD software. - Designed lighting using Dialux, lighting layout and lighting panels. - Prepared cable sizing / schedule, cable route layout, consumer list, load calculations, power transformer sizing. - Designed PLC and control system configuration using AutoCAD and prepared I/O list. - Managed switchboard manufacturer and all aspects of project planning and execution for electrical system, including installation, commissioning of the first module, and tracked performance ensuring on-time completion. - Lead team of electricians/apprentices during installation, commissioning - Collaborated with mechanical design engineers, technical director and project manager. - Supported the preparation and development of P&ID’s.

    • Electrical Engineer
      • Jun 2011 - Jan 2012

      Projects: - Khorasan iron steel pelletizing plant with a capacity of 2.5 million tons of DR grade pellets per year. - Belt conveyors/material handling in sugar cane factory. Responsibilities: - Designed LV main switchboards, MCC switchboards, schematics, wiring diagrams and terminal diagrams. - Prepared all basic designs & specifications. - Prepared 33kV single line diagram (SLD), 6.6kV SLD and LV SLD using AutoCAD. - Calculated power transformer sizing, capacitor bank, diesel generator. - Prepared and designed plans for Sub-stations, lighting, earthing, cable routes. - Designed lighting using Dialux software. - Provided cable sizing and schedule, motor/consumer list and load calculations. - Assisted the preparation and development of P&ID’s using AutoCAD software. - Provided instrumentation specifications & data sheets, switchboard data sheet, power transformer data sheet. - Designed PLC detailed drawings, wiring diagrams, terminal diagram, logic diagram and control system configuration, prepared I/O list and instrument list. - Reported to projects manager and director. - Attended in weekly meetings with the clients and liaise with suppliers and manufacturers. - Supervised and inspected site during installation and commissioning (belt conveyors in sugar cane factory).

    • Iran
    • Oil and Gas
    • 1 - 100 Employee
    • Electrical Engineer
      • Feb 2010 - May 2011

      Projects: - Power distribution renovation project in bitumen factory in Tehran refinery - Bitumen factory project in Abadan refinery. - Exporting terminal project in Bandar Imam. - Exporting terminal project in Bandar Abas. - Incinerator project in Arak refinery Responsibilities: - Reviewed, checked and approved all electrical designs and drawings for the “power distribution renovation” project including but not limited to: 20kV single line diagram (SLD) and LV SLD, load calculations, power transformer sizing, lighting layout, lighting switchboards, earthing calculations & layouts, datasheets, logic diagrams, technical specifications, typical installation details, cable sizing & schedule, cable routes. - Reviewed, checked and approved suppliers and manufacturers drawings and documents - Evaluated relevant tender’s documents and contracts. - Reviewed, checked and approved all instrumentation and control drawings and documents for the Exporting terminal project and Abadan project including but not limited to: instrumentation and control system specifications, instrumentation data sheets, logic and loop diagrams, I/O and instrument lists, cable routs, hook-up, P&ID’s, typical installation details. - Inspected and participated in FAT (20kV switchboard, LV distribution boards, power transformers, and cables). - Participated in site supervision and inspection during installation and commissioning. - Provided technical support during procurement, construction and commissioning. - Managed manufacturers (LV & MV switchboard, transformers, cables, etc.), suppliers, consultant, contractors and technical meetings  - Assisted with the preparation of subcontractor contracts and relevant technical specifications, ensuring all proper documentation was in place. - Provided investigation and problem resolution during commissioning of exporting terminal in Bandar-Abas and incinerator in Arak refinery, resulting in decreased turnaround time and budget.

    • Electrical Engineer
      • Aug 2001 - Mar 2010

      Projects: - Seven sugar cane projects with the capacity of 100,000 tons sugar per year each. Responsibilities: Following responsibilities are for all units in each project such as: raw house, mill house, water treatment, power house, conveyors, lime kiln, buildings, and warehouses. - Participated in factory inspection and test (FAT) of all 6.6 kV switchgears, LV main switchboards, MCC’s, PLC’s and control cabinets, power transformers, cables, cable trays, etc. for all sugar cane projects. - Collaborated with procurement department and site based supervisors & engineers. - Reported to project managers and quality control manager. - Reviewed all electrical designs, control designs and technical documents before manufacturing and procurement. - Evaluated relevant tenders and contracts using sound business acumen. - Periodically travelled and participated in site inspection during installation and commissioning to ensure electrical, instrumentation and control system are in compliance with the clients’ requirement and design. - Provided technical support during procurement, construction and commissioning. - Performed troubleshooting and maintenance, recognizing potential issues and resolving quickly. - Liaised with client, stakeholders and managed contractors, suppliers, manufacturers (LV & MV switchboard, cables transformers, etc.). - Designed all LV-MCC’s & MV-MCC’s switchboards for a sugar cane factory including SLD’s, schematics, wiring diagrams and terminal diagrams. - Reviewed, checked and approved all electrical designs, instrumentation & control system designs for a water treatment plant in sugar cane factory including: electrical schematics, wiring diagrams, cable sizing and schedule, cable tray & routes, load/motor list, instrument & I/O list, logic diagram, PLC drawings, loop diagram, etc.

    • Electrical Engineer
      • Jan 2008 - Oct 2008

      Project:  -Buildings in largest gas plant project in south of Iran (Asaluyeh) Responsibilities:  -Designed lighting, socket outlet, earthing, lightning including calculations and layouts using AutoCAD, Dialux.  -Prepared cable sizing and schedule, SLD for main switchboards and distribution boards.  -Collaborated with other discipline’s engineers.  -Attended in weekly meeting with client. Project:  -Buildings in largest gas plant project in south of Iran (Asaluyeh) Responsibilities:  -Designed lighting, socket outlet, earthing, lightning including calculations and layouts using AutoCAD, Dialux.  -Prepared cable sizing and schedule, SLD for main switchboards and distribution boards.  -Collaborated with other discipline’s engineers.  -Attended in weekly meeting with client.

    • Instrument Engineer
      • Jul 2000 - Aug 2001

      - Managed instrumentation maintenance, as head of maintenance team, in Para-Xylene (PX) plant in Bandar Imam Petrochemical phase one. - Managed instrumentation maintenance, as head of maintenance team, in Para-Xylene (PX) plant in Bandar Imam Petrochemical phase one.

    • Electrical & Instrument Supervisor - Engineer
      • Jan 1999 - Feb 2000

      - Supervised installation and commissioning of all electrical & instrumentation systems, including power transformers, 6.6 kV sub-stations, power distribution, M.V&L.V switchgears, MCC panels, PLC & DCS panels, cabling, and conveyors. - Liaise with client, contractors, engineering department. - Reported to project manager. - Provided investigation and problem resolution during installation and commissioning. - Supervised installation and commissioning of all electrical & instrumentation systems, including power transformers, 6.6 kV sub-stations, power distribution, M.V&L.V switchgears, MCC panels, PLC & DCS panels, cabling, and conveyors. - Liaise with client, contractors, engineering department. - Reported to project manager. - Provided investigation and problem resolution during installation and commissioning.

    • Electrical Technician
      • Jun 1995 - Oct 1996

Education

  • Azad university
    Bachelor's Degree, Electrical Engineering
    1991 - 1996

Community

You need to have a working account to view this content. Click here to join now