Majdi Ataya, PE
President at Onward Engineering- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Native or bilingual proficiency
-
Arabic Full professional proficiency
Topline Score
Bio
Barbara Feeler
Mr. Ataya and I worked for a City during a time of Municipal Code re-write. Weekly meetings were held and Mr. Ataya was always prepared. During this time during winter storms the City suffered damage to several different streets. Mr. Ataya was responsible for coordinating with FEMA and bringing the projects to completion with the City's major street closed for over 2 months for repairs. Mr. Ataya prepares complete staff reports and presents well prepared reports to City Council and Planning Commission.
Barbara Feeler
Mr. Ataya and I worked for a City during a time of Municipal Code re-write. Weekly meetings were held and Mr. Ataya was always prepared. During this time during winter storms the City suffered damage to several different streets. Mr. Ataya was responsible for coordinating with FEMA and bringing the projects to completion with the City's major street closed for over 2 months for repairs. Mr. Ataya prepares complete staff reports and presents well prepared reports to City Council and Planning Commission.
Barbara Feeler
Mr. Ataya and I worked for a City during a time of Municipal Code re-write. Weekly meetings were held and Mr. Ataya was always prepared. During this time during winter storms the City suffered damage to several different streets. Mr. Ataya was responsible for coordinating with FEMA and bringing the projects to completion with the City's major street closed for over 2 months for repairs. Mr. Ataya prepares complete staff reports and presents well prepared reports to City Council and Planning Commission.
Barbara Feeler
Mr. Ataya and I worked for a City during a time of Municipal Code re-write. Weekly meetings were held and Mr. Ataya was always prepared. During this time during winter storms the City suffered damage to several different streets. Mr. Ataya was responsible for coordinating with FEMA and bringing the projects to completion with the City's major street closed for over 2 months for repairs. Mr. Ataya prepares complete staff reports and presents well prepared reports to City Council and Planning Commission.
Credentials
-
Multi-Engine Private Pilot License
- -
Registered Civil Engineer
California
Experience
-
Onward Engineering
-
United States
-
Civil Engineering
-
1 - 100 Employee
-
President
-
Jan 2004 - Present
Majdi Ataya, PE, is the President of Onward Engineering and a Project Manager on key contracts. He is extremely familiar with the process of design engineering, construction management and inspection. Majdi understands the importance of excellent communication. With over 30 years of experience in the public works, design, & construction management industries, Majdi is an effective project manager offering a level of expertise sought by many. Services provided by Onward Engineering include preparing engineering design plans, PS&E packages, bid documents for CIP projects, review subdivision and development plans, plan check capital improvement projects, and provide construction management and inspection services. His responsibilities include: -Staff Management -Chair Project Meetings -Quality Assurance & Quality Control -Engineering Review Show less
-
-
-
ASCE Orange County
-
United States
-
Civil Engineering
-
1 - 100 Employee
-
Member
-
1981 - 2016
-
-
-
-
Deputy Director of Public Works
-
1989 - 2004
Plan, budget, schedule, direct and coordinate a comprehensive Capital Improvement Program (CIP) to maintain, operate and upgrade the city’s infrastructure. The CIP includes: highways, local streets, traffic signals, median beautification, alleys, sidewalks, curbs and gutters, waterline infrastructure, sewer line infrastructure, storm drain infrastructure, and other public facilities. Review and approve design plans, specifications, contracts, inspections and approve construction. Review, and approve developer maps, plans, and agreements. Coordinate work with federal, state, county, city and special district agencies at all levels. Show less
-
-
-
Brown & Root
-
Oil and Gas
-
100 - 200 Employee
-
Senior Civil Engineer
-
1984 - 1989
Design and build civil infrastructure for the Petro-Chemical industry, i.e. roads, pipelines, pier structures, platforms, etc. During various phases of design and construction was responsible for planning, organizing, and directing professional and sub professional engineers. Coordinated design & construction efforts with other disciplines, resolved problems involving design materials & construction, & supervised the work performed by contractors. Design and build civil infrastructure for the Petro-Chemical industry, i.e. roads, pipelines, pier structures, platforms, etc. During various phases of design and construction was responsible for planning, organizing, and directing professional and sub professional engineers. Coordinated design & construction efforts with other disciplines, resolved problems involving design materials & construction, & supervised the work performed by contractors.
-
-
-
-
Civil Engineer
-
1982 - 1984
Prepared structural design calculations and drawings for buildings, and other structures made of reinforced concrete and steel. Prepared cost estimates for public facilities, and developer projects. I was responsible for preparing cost estimates for public facilities, and developer projects. I conducted special engineering studies of existing facilities, and resolved problems that occurred during construction. Along with supervising the construction, my duties also included establishing and maintaining an effective working relationship with the developers, consultants, contractors, governmental agencies, and the public. Show less
-
-
-
Willdan
-
United States
-
Engineering Services
-
500 - 600 Employee
-
Civil Designer
-
1981 - 1982
All work was pertinent to public works projects, I performed basic design and drafting of; street plans, grading plans, subdivision plans, waterline plans, sewerline plans, and storm drain plans. I also prepared topographic maps, and performed hydrological studies, traffic studies, and various surveying duties as party chief. All work was pertinent to public works projects, I performed basic design and drafting of; street plans, grading plans, subdivision plans, waterline plans, sewerline plans, and storm drain plans. I also prepared topographic maps, and performed hydrological studies, traffic studies, and various surveying duties as party chief.
-
-
Education
-
California State University-Long Beach
Masters in Public Administration -
California State University, Long Beach
Civil Engineering, Engineering