Maison Nelson

Project Manager at USAF Civil Engineer
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
North Las Vegas, Nevada, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Civil Engineering
    • 200 - 300 Employee
    • Project Manager
      • Sep 2021 - Present

      DoD Civilian DoD Civilian

    • United States
    • IT Services and IT Consulting
    • 1 - 100 Employee
    • Project Manager
      • Jun 2020 - Sep 2021

    • United States
    • Defense and Space Manufacturing
    • 700 & Above Employee
    • Project Manager/Inspector
      • Jan 2017 - Jun 2020

    • Heating Ventilation Air Conditioning Supervisor
      • Jan 2014 - Jan 2017

    • Project Manager/Inspector
      • Jan 2011 - Jan 2014

    • Water Treatment Manager
      • Jan 2009 - Jan 2011

    • Heating Air Conditioning Technician
      • Oct 2005 - Jan 2009

    • Heating Air Conditioning Technician
      • Jan 2003 - Oct 2005

    • Journeyman, Heating, Air Condition, Ventilation And Refrigeration
      • Dec 2001 - Jan 2003

      - Managed maintenance and repairs of 1.7 thousand HVAC systems for 1,060 facilities to sustain a $1.55 billion physical plant. Maintain equipment and facilities in accordance with Air Force Instructions.- Used drawings and schematics to isolate faults; maintains electrical, and digital control systems for optimal operation and reduction of energy. - Complied with EPA's standards while safely handling, tracking, quality controlling ozone depleting refrigerants, fuels & hazardous material. Show less

    • Apprentice, Heating, Air Condition, Ventilation And Refrigeration
      • Apr 1999 - Dec 2001

      - Installed, operated, maintained, modified, and repaired commercial and residential HVAC/R systems to include 400 heat pumps, heat reclaim and exchanger systems, 350 evaporative coolers, air compressors and ventilators, and 94 steam and water heating boilers. - Maintained and operated evaporative cooling towers up to 500 tons, cold plate systems, and two 400-ton centrifugal chillers. Calibrated, adjusted, and repaired electrical, electronic and pneumatic systems. - Installed, troubleshot, repaired solenoid valves, transformers, and motors. Performs preventive maintenance 6,000 equipment items. Researchers, plans, and orders materials for equipment replacement Show less

Community

You need to have a working account to view this content. Click here to join now