Mahesh Patil
Project Manager at G CENTRI FORCE ENGINEERING PVT. LTD.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Marathi -
-
Hindi -
-
English -
Topline Score
Bio
Credentials
-
Creo Element/Pro 5.0
PTCNov, 2011- Oct, 2024
Experience
-
G CENTRI FORCE ENGINEERING PVT. LTD.
-
India
-
Machinery Manufacturing
-
1 - 100 Employee
-
Project Manager
-
Jun 2020 - Present
Project planning as per order delivery dates set by customer. Arranging daily as well as weekly meeting to review the status of project and remove bugs. Submit summarised report to client/consultant with weekly planning report. Project planning as per order delivery dates set by customer. Arranging daily as well as weekly meeting to review the status of project and remove bugs. Submit summarised report to client/consultant with weekly planning report.
-
-
-
Rathi Transpower Private Ltd
-
India
-
Industrial Machinery Manufacturing
-
1 - 100 Employee
-
Design Engineer
-
Feb 2015 - Jun 2020
• Manage technical clarification support between the customer and dealer or distributor. • Making awareness of contract review in-between trainee Engineers. • Preparing BID documents like QAP, deviation sheet, BOQ, PQC and organising check list of Technical documents. Also uploading on portal with the help of BID officer. • Evaluation of parameters of coupling like material selection, coupling type selection for large project enquiries. • Making KAIZEN projects to improve daily work. • Preparing Management Review Meeting Data (MRM) and presenting in front of management body(Managing Director) • Handling of enquiry team in absence of HOD/DGM. • Optimize product manufacturing time by standardization. • Preparing SAP codes and submitting report to vice precedent. Show less
-
-
-
Samson Controls Inc.
-
Canada
-
Automation Machinery Manufacturing
-
100 - 200 Employee
-
Design Engineer
-
Aug 2012 - Jul 2014
• Design and development of products as well as tooling for workshop, inspection and vendors. • Patent registration documentation. • Prepare Process drawings and implementation at the vendor end. • Support to prepare Techno-commercial offers of import products and its accessories (spares). • Handling of customized project of valves with various accessories. • Design and development of products as well as tooling for workshop, inspection and vendors. • Patent registration documentation. • Prepare Process drawings and implementation at the vendor end. • Support to prepare Techno-commercial offers of import products and its accessories (spares). • Handling of customized project of valves with various accessories.
-
-
-
HIND GEAR INDUSTRIES
-
India
-
Retail Office Equipment
-
1 - 100 Employee
-
TRAINEE ENGINEER
-
Aug 2011 - May 2012
• Develop new Batches of gear for customer from raw material to finish goods. • Making drawing for work centre. Designing Mandrel, fixtures & jig for drilling for gear. Project- Speed reducing Gear Box Development of Worm wheel Gear box which is used for casting industries. We have design Seat checking fixture for worm and worm shaft which check proper alignment of meshing of gears also we can check the noise level. • Develop new Batches of gear for customer from raw material to finish goods. • Making drawing for work centre. Designing Mandrel, fixtures & jig for drilling for gear. Project- Speed reducing Gear Box Development of Worm wheel Gear box which is used for casting industries. We have design Seat checking fixture for worm and worm shaft which check proper alignment of meshing of gears also we can check the noise level.
-
-
Education
-
Bharati Vidyapeeth
Bachelor of Engineering (B.E.), Mechanical Engineering -
New Highschool, Kolhapur
S.S.C., Marathi