Mahesa Agni
Plant Operator at PT. Bhumi Jepara Service- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
SIO Turbine Operator Class 1
Kementerian Ketenagakerjaan Republik IndonesiaMar, 2022- Oct, 2024 -
SIO Boiler Operator Class 1
Kementerian Ketenagakerjaan Republik IndonesiaJan, 2022- Oct, 2024 -
SKTTK Main and Auxiliary Cooling Operator Level 2
PT Eleska IATKINov, 2021- Oct, 2024 -
STTK Workover and Well Service Operator Level 3
Badan Nasional Sertifikasi ProfesiJul, 2019- Oct, 2024 -
STTK Health and Safety Operator Level 1
Badan Nasional Sertifikasi ProfesiJun, 2019- Oct, 2024
Experience
-
PT. Bhumi Jepara Service
-
Indonesia
-
Oil and Gas
-
100 - 200 Employee
-
Plant Operator
-
Mar 2020 - Present
- Local and DCS operation of turbine building, boiler island, balance of plant, and 500 kV gas insulated switchyard area.- Commissioning activity surveillance, report, and support- Work instruction development, and technical document review- System and equipment isolation and normalization- Plant start up and shut down preparation and operation - Local and DCS operation of turbine building, boiler island, balance of plant, and 500 kV gas insulated switchyard area.- Commissioning activity surveillance, report, and support- Work instruction development, and technical document review- System and equipment isolation and normalization- Plant start up and shut down preparation and operation
-
-
-
PT Pertamina Geothermal Energy
-
Indonesia
-
Renewables & Environment
-
700 & Above Employee
-
Student Intern
-
Jan 2019 - Apr 2019
Water Supply Pipeline Design as Make Up Well Drilling Requirement Water Supply Pipeline Design as Make Up Well Drilling Requirement
-
-
-
-
Student Internship
-
Mar 2018 - Apr 2018
Identifiying Feedzone Location Using PTS Survey Identifiying Feedzone Location Using PTS Survey
-
-
-
JOB Pertamina - PetroChina East Java
-
Indonesia
-
Oil and Gas
-
1 - 100 Employee
-
Student Internship
-
Mar 2017 - Mar 2017
Analysis of Stage Requirement of Electric Submersible Pump Operation Based On Well Performance Analysis of Stage Requirement of Electric Submersible Pump Operation Based On Well Performance
-
-
-
-
Student Internship
-
Mar 2016 - Apr 2016
Observation of Automatic Tank Gauging Operation Observation of Automatic Tank Gauging Operation
-
-
Education
-
PEM Akamigas
Bachelor of Applied Science - BASc, Petroleum Engineering