Mahalingam M

Sr Civil Engineer - Projects at Kauvery Hospitals Bangalore
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Tirunelveli, Tamil Nadu, India, IN

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Certified Member (CM)
    Indian Concrete Institute (Pune Centre)
    Apr, 2014
    - Nov, 2024

Experience

    • India
    • Hospitals and Health Care
    • 100 - 200 Employee
    • Sr Civil Engineer - Projects
      • Mar 2021 - Present

    • Sr. Engineer
      • Jan 2018 - Jan 2020

      Projects undergone: MELTSHOP :- 2 No's of 20MT Induction Furnace, 1 No of 30 MT Arc Furnace, 1 No of 80 MT Isolated Sub-Station along with 6 No's of Mini-Substations, 7 x 14 mtrs Continuous Casting Machine, 30 MTPH Billet reheating furnace (Dual heating burners- oil & gas), Double staged Coal Gasifier, 20 lakh litre capacity Water complex. ROLLING MILLS:- Heavy Sectional Rolling Mill, Medium Sectional Rolling Mill sharing common Post Operational area(from Cooling bed to Bundling and Packing Unit), Light Sectional Mill along with Re-Bar & Garret Coiler. Role Responsibility :- Designing all the Civil Foundations and Structural Members by using AutoCAD & STADD Pro from the GA drawings provided by Suppliers and get approved by local structural consultant (South Africa Reputed Consultant). Executed all the Civil and Structural Activities on site and Planned the Timelines for Each work to get complete along with planning man-power resources, Material Procurement, Material Shipping Lineups , Finalizing Required Spec of Machinery (On guidance with respected field seniors) and also Derived CTC for PC. Show less

    • India
    • Mining
    • 700 & Above Employee
    • Asst.Engineer
      • Feb 2016 - Oct 2017

      Projects undergone - 45MVA Power plant, 8 No's of 20 MT Induction furnace, 1 No of 25MT LRF and 2 no's of 3 Strand Caster 4x11 along with that one coal feeding underground hopper to supply Powerplant. Planning and Designing the Civil and Structural Members from the GA drawings supplied by Machine Manufacturers and making it feasible with our site condition. Formulating the Timeline for PC and executing the site activities to finish it within our derived deadlines. Projects undergone - 45MVA Power plant, 8 No's of 20 MT Induction furnace, 1 No of 25MT LRF and 2 no's of 3 Strand Caster 4x11 along with that one coal feeding underground hopper to supply Powerplant. Planning and Designing the Civil and Structural Members from the GA drawings supplied by Machine Manufacturers and making it feasible with our site condition. Formulating the Timeline for PC and executing the site activities to finish it within our derived deadlines.

    • India
    • Research Services
    • 100 - 200 Employee
    • Project Student
      • Jan 2015 - Mar 2015

      Undergone Final year Engineering project at CSIR - Structural Engineering Research Centre, Taramani, Chennai on Evaluation of Durability parameters of different concretes(OPC,PPC & PSC grade cements) using Rapid Chloride Penetration Test(RCPT) & Rapid Chloride Migration test (RCMT) Undergone Final year Engineering project at CSIR - Structural Engineering Research Centre, Taramani, Chennai on Evaluation of Durability parameters of different concretes(OPC,PPC & PSC grade cements) using Rapid Chloride Penetration Test(RCPT) & Rapid Chloride Migration test (RCMT)

Education

  • Nandha Engineering College
    Bachelor of Engineering - BE, Civil Engineering
    2011 - 2015
  • CADD Centre Training Services Private Limited
    AutoCAD, Revit & STADD Pro V8i, Drafting/Design Engineering Technologies/Technicians
    2012 - 2014

Community

You need to have a working account to view this content. Click here to join now