Lukman Hakim

Process Engineer at PT Lotte Chemical Titan Nusantara
  • Claim this Profile
Online Presence
Contact Information
Location
Serang, Banten, Indonesia, ID
Languages
  • Bahasa Indonesia Native or bilingual proficiency
  • English Professional working proficiency

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • Energy Auditor
    Enercoss
    Jul, 2021
    - Sep, 2024
  • HAZOPS (Concept and application of HAZOP study)
    PT LCTN
    Mar, 2020
    - Sep, 2024
  • PTC UNDIP Hysys 3.2
    PTC UNDIP
    Mar, 2012
    - Sep, 2024

Experience

    • Indonesia
    • Chemical Manufacturing
    • 100 - 200 Employee
    • Process Engineer
      • Aug 2016 - Present

      PT Titan Petrochemical Nusantara is the largest polyethylene producer in Indonesia and now is one of subsidiary of LOTTE Chemical Titan Nusantara, South Korea PT Titan is formerly PT Peni (Petrokimia Nusantara Interindo), a polyethylene plant designed and built by BP Chemical (INNOVENE TECHNOLOGY). The plant has 3 Trains converting ethylene into polyethylene. Current Role and Responsibility:1. To analyzed, to recommend and to modify (if necessary) equipment / unit / system to run in its highest performance, having best integrity / reliability, in order to deliver intended purpose2. To troubleshoot, to solve and to figure out resolution of any equipment / unit / system problem that deviating from its intended design of purpose due to issue in process, quality, safety, environment, reliability, integrity, etc (some milestones that have been achieved are available as follow)3. To monitor, to control, to lead and to deal with all technical aspect and process activities in area responsibility to achieve operation target (quality, quantity and reliability) without any incident and accident4. To train, to guide, to coach, to counsel and to develop field technician and DCS operator skill, knowledge and attitude5. To control all routine plant support (logging, inspection, etc.) and all technical (quality, performance, inventory, reliability, integrity, maintenance) concern6. To close link with Shift Supervisor and Plant Superintendent for improvement, troubleshooting and to set standards for any activity which is/may happen7. To link the operation activity with other department (laboratory, TSC, TG, Engineering, HSE etc.)8. To optimize and to control usage of all material (utilities and feed) and to give input of any problems or incident (or potential one) and to drive investigation, solution, prevention (internal & external)9. To participate in routine meeting internal in operation department as wall as others meeting (reliability, performance and quality etc.)

Education

  • Sepuluh Nopember Institute of Technology
    Sarjana Teknik (ST), Teknik Kimia (Chemical engineering)
    2013 - 2015
  • Diponegoro University
    Ahli Madya (A.Md.), D3 Teknik Kimia (D3 Chemical Engineering)
    2010 - 2013
  • SMA 1 Informatika Serang Banten Senior High School
    IPA
    2007 - 2010
  • SMP 1 Kandangan Kal-Sel Junior High School
    2004 - 2007

Community

You need to have a working account to view this content. Click here to join now