Luis Santos

Warehouse & Equipment Manager at Perene
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Seixal, Setúbal, Portugal, PT
Languages
  • Português Native or bilingual proficiency
  • Inglês Native or bilingual proficiency
  • Francês Limited working proficiency
  • Espanhol Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Course IOSH – Managing Safely
    IOSH
    Mar, 2010
    - Oct, 2024
  • Certified trainer
    Instituto do Emprego e Formação Profissional
    Aug, 2003
    - Oct, 2024
  • Gas Installation Engineer
    Portuguese Ministery of Economy
    Apr, 2001
    - Oct, 2024

Experience

    • Brazil
    • Recreational Facilities
    • 1 - 100 Employee
    • Warehouse & Equipment Manager
      • Nov 2020 - Present

      • Warehouse management to supply working teams over the country; • Management of PPE and equipment consumables; • Management of all the equipment, allocation and certification; • Equipment repair and inspection control;; • Vehicles fleet management (car’s, trucks and vans). • Warehouse management to supply working teams over the country; • Management of PPE and equipment consumables; • Management of all the equipment, allocation and certification; • Equipment repair and inspection control;; • Vehicles fleet management (car’s, trucks and vans).

    • Netherlands
    • Engineering Services
    • 700 & Above Employee
    • Store & Logistics Manager
      • Nov 2017 - Jul 2018

      • • Safety performance of team.• Supervision and appraisal of store and logistics department personnel.• Coordination of yard logistics, in country transportation and husbandry assistance.• Imports and exports customs clearance process.• Scrap and waste management.• Bunkering of vessels, fuel and drinking water.• Food runs for supply vessels.• Project related logistics and demobilization of project material.• Yard storage management.

    • Technical manager - Lucala Tugboat
      • Nov 2014 - Jul 2018

      Cumulative to the other positions at Heerema Porto Amboim - Angola, since 1st November 2014, technical manager for the Lucala Tugboat (43mT static bollard pull - Panana Flag).Main Tasks• Safety performance of team.• Appraisal of vessel crew performance, in coordination with vessel’s Captain.• Lucala Tugboat (43mT static bollard pull - Panama Flag).• Class certification of Tug boat (Maltese cross 1A1, Tug).• Statutory documents and permits management.• Legal mandatory inspections. • Laid up procedures.• Technical support for the crew, local and expat. Show less

    • Chief Storekeeper Supervisor
      • Nov 2015 - Oct 2017

      • Safety performance of team. • Supervision and appraisal of the store personnel.• Preparation and control of department budget and KPI.• Control of material stocks, over 10.000 different items.• Permanent review of stock levels adjusting them project demands, increase or decrease, and transportation mode.• Ageing analysis of perishable consumables. • Requisitions of materials and services.• Availability and storage of project materials.• Assistance to procurement for parts sourcing.• Receiving and checking arriving goods. Show less

    • Maintenance Work Preparator
      • Jan 2014 - Nov 2015

      • Job preparation.• Procedures for maintenance activities on equipment and facilities.• Planning on all forthcoming jobs.• Monitor of spare parts usage.• Department administration and technical documentation of the department.• Calibration and internal verification of ITME and tools.• Provide input for department meetings.• Periodical tests of the water-maker and sewer-plant.

    • Portugal
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Sales Executive
      • Oct 2012 - Mar 2013

      Product range from air compressors, dryers, air and vacuum networks, pneumatics, electrical, and automation solutions for the industry. Product range from air compressors, dryers, air and vacuum networks, pneumatics, electrical, and automation solutions for the industry.

    • Spain
    • Mining
    • 1 - 100 Employee
    • Deputy Plant Manager
      • May 2012 - Sep 2012

      Reporting to the Plant Manager, the plant had 34 workers (production, quality and maintenance). Responsible for the production management, production planning, shift planning, vacations coordination and annual maintenance summer stop. Reporting to the Plant Manager, the plant had 34 workers (production, quality and maintenance). Responsible for the production management, production planning, shift planning, vacations coordination and annual maintenance summer stop.

    • Maintenance Manager
      • Mar 2002 - Nov 2011

      Responsible for the maintenance of the equipment’s and facilities, managing a team of 15 persons (5 electricians, 8 mechanics and 2 tools technicians). Direct management of shop floor supervisors, both electrical and mechanical, to ensure readiness of equipment. This was done by scheduled maintenance activities, but also via quickly prepared unscheduled stops due to breakdowns. Many projects developed, as relocation of complete lines or isolated machines from other group factories, upgrades to existing equipment to meet safety requirements and production upsizing. Most significant project was the sourcing and installation of a thermal oxidiser. I was the project manager for this equipment, it was a mandatory requirement on the environmental permit. It was a five-month installation project were commitment with production had to be made so that the production lines stop in order for the interconnections between the equipment’s were made. This was a 1.8M€ project that met both the deadline and budget. Main responsibilities: • Safety performance of team and equipment’s. • Supervision and appraisal of the maintenance personnel. • Preparation and management of budget and KPI. • Optimization of the energy resources of the plant. • Preventive Maintenance procedures for all the equipment’s in the factory. • Development of improvement plans for the production lines, either by replacing equipment’s or by modification/upgrade of existing equipment’s. • Upgrading equipment’s to comply with present safety regulations. • Safety audits for gas burners. • Development of implementation plans for new lines (layouts, power, compressed air, cooling, natural gas supply). • Maintenance of the facility’s technical information (layouts, compressed air, gas, sewage, water, AVAC). • Management of the spare parts warehouse and stocks. Show less

    • United Kingdom
    • Motor Vehicle Manufacturing
    • 700 & Above Employee
    • Process Engineer
      • Sep 1999 - Feb 2002

      Reporting to the engineering manager, responsible for:• Optimisation of the production line according to the arrival of new products of the same family• Sourcing /specification, purchase and validation of new equipment’s.• Co-ordination of the maintenance technician supporting production.• Preventive maintenance procedures for the production equipment’s.• Total Maintenance.• Permanent follow up on the Quality and scrap parameters. • Continuous improvement of the process and product using best practices of other lines and plants.• Lean Manufacturing plans.• Up to date product documentation (DFMEA, PFMEA, Machine qualifications, Process routings, Process flow diagrams, Product drawings, Tooling drawings, Pareto diagrams, and Project flow diagrams).• Training and implementation of the Lean Manufacturing, Lean Equipment Design and One piece flow• Implementation and Development of investments and Cost-savings programs. Show less

    • Industrial Engineer
      • Nov 1998 - Sep 1999

      Industrial Engineer on the harness for the Opel Zafira and for the Mercedes A Class. Main tasks:• Pre-launch of new products ( Opel Zafira)Project Plans (P.D.P.), equipment definition and capacity calculations.• Start-Up and continuous follow-up for new products ( Opel Zafira )Definition and validation of Start-Up Curves.Validation of operator work balance.• Support to Production ( Opel Zafira & Mercedes A Class)Ergonomic analysis to the working placeInternal Audits• Implementation and Development of investments and Cost-savings programs ( Opel Zafira & Mercedes A Class). Show less

Education

  • Instituto Superior Técnico
    Degree in Mechanical Engineering, Engeneering
    1993 - 1998
  • DoItBetter
    Certified trainer, Trainning
    2013 - 2013
  • ITG - Instituto Técnológico do Gás
    Gas Installation Engineer, Gas
    1999 - 1999
  • University of Cambridge
    Certificate of Proficiency, English
    1983 - 1993

Community

You need to have a working account to view this content. Click here to join now