Luis Fernando Julio D

Inspector QA/QC Electrico at HL INGENIEROS SA
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Cartagena, Bolívar, Colombia, CO

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Shaloma Carroll

We worked together on a large industrial project in The Bahamas. Luis always ensured that the job was done correctly the first time. He speaks fluent English and would be an awesome bilingual asset for any team!

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Colombia
    • Construction
    • 200 - 300 Employee
    • Inspector QA/QC Electrico
      • Jul 2022 - Present

      Smurfit Kappa - PROYECTO LEAP SISTEMA DE EVAPORACIÓN DE LICOR NEGRO. Smurfit Kappa - PROYECTO LEAP SISTEMA DE EVAPORACIÓN DE LICOR NEGRO.

    • Finland
    • Mechanical Or Industrial Engineering
    • 400 - 500 Employee
    • Supervisor Electricist
      • May 2022 - Jul 2022

      Encargado de realizar precomisionamiento y comisionamiento a equipos eléctricos rotativos y estáticos. Encargado de realizar precomisionamiento y comisionamiento a equipos eléctricos rotativos y estáticos.

    • Italy
    • Mining
    • 100 - 200 Employee
    • Profesional QA/QC E&I
      • Jan 2022 - Jun 2022

      T/A U-111 T/A U-111

    • Bahamas
    • Construction
    • 1 - 100 Employee
    • QA/QC Inspector
      • Mar 2021 - Sep 2021

      In charge of conducting inspections and supervising activities in disciplines such as instrumentation, electricity, handling and delivery of documentation for the client. In charge of conducting inspections and supervising activities in disciplines such as instrumentation, electricity, handling and delivery of documentation for the client.

    • QA/QC Inspector
      • Apr 2019 - Jun 2019

      • Quality assurance in tasks carried out in Plant Shutdown such as motor insulation test, corrective maintenance to Furnace F-001 in unit 110 of the Cartagena refinery and units 115/116, by the group of Electrical Technicians.• Preparation and delivery of documentation based on activities carried out in Plant Shutdown in units 110/104/115/116 of the Cartagena Refinery.• Preparation of inspection reports and taking a photographic record to show work carried out and delivery to the client. • Quality assurance in tasks carried out in Plant Shutdown such as motor insulation test, corrective maintenance to Furnace F-001 in unit 110 of the Cartagena refinery and units 115/116, by the group of Electrical Technicians.• Preparation and delivery of documentation based on activities carried out in Plant Shutdown in units 110/104/115/116 of the Cartagena Refinery.• Preparation of inspection reports and taking a photographic record to show work carried out and delivery to the client.

    • Ingeniero residente
      • Feb 2017 - Jun 2018

      • Direct activities carried out by an electrician group in the PRAXAIR company, supervising the execution and delivery of executed works.• Quality assurance in works carried out in PRAXAIR company and deliver to the client.• Preparation of inspection reports and taking a photographic record to show work carried out and delivery to the client. • Direct activities carried out by an electrician group in the PRAXAIR company, supervising the execution and delivery of executed works.• Quality assurance in works carried out in PRAXAIR company and deliver to the client.• Preparation of inspection reports and taking a photographic record to show work carried out and delivery to the client.

    • United Arab Emirates
    • Engineering Services
    • 700 & Above Employee
    • QA/QC Inspector
      • Jun 2014 - Dec 2015

      • Quality assurance in tasks carried out in the Cartagena refinery expansion project, unit 100. such as installation of conduit pipe, cable tray, wiring and connections by the group of Electrical Technicians.• Preparation and delivery of documentation based on activities carried out in unit 100, under the A-sheets format, delivered to the CBI client.• Preparation of inspection reports, reading of installation plans and taking a photographic record to show work carried out and delivery to the client.

Education

  • Fundación Universitaria Technologico Comfenalco
    Ingeniería Industrial, Ingeniería industrial
    2008 - 2015
  • Fundación Universitaria Tecnologico Comfenalco
    DIPLOMADO DE INGENIERÍA DE LA CONFIABILIDAD APLICADA A MANTENIMIENTO Y PRODUCCION, Ingeniería
    2015 - 2015

Community

You need to have a working account to view this content. Click here to join now