Luciana Soares
Project Manager at Ligga- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Spanish Professional working proficiency
-
German Elementary proficiency
-
Portuguese Native or bilingual proficiency
-
English Professional working proficiency
Topline Score
Bio
Jane Rolim Reis
Luciana é muito ativa, competente e atenta aos detalhes. Um grande talento que tive o privilégio de conhecer. Excelente pessoa e profissional.
Juliana Cacilda Diniz Borges
Mesmo após cloncluirmos a graduação mantemos contato frequente, principalmente por termos interesses profissionais em comum. Luciana é uma profissional em constante busca não só de renovação, mas também de aplicação de seus conhecimentos e habilidades técnicas e interpessoais. As experiências que vem somando em seu currículo, principalmente na gestão de projetos demonstra isto. O fato de ter atuado em projetos no exterior, completa o perfil de uma profissional de grande capacitação.
Jane Rolim Reis
Luciana é muito ativa, competente e atenta aos detalhes. Um grande talento que tive o privilégio de conhecer. Excelente pessoa e profissional.
Juliana Cacilda Diniz Borges
Mesmo após cloncluirmos a graduação mantemos contato frequente, principalmente por termos interesses profissionais em comum. Luciana é uma profissional em constante busca não só de renovação, mas também de aplicação de seus conhecimentos e habilidades técnicas e interpessoais. As experiências que vem somando em seu currículo, principalmente na gestão de projetos demonstra isto. O fato de ter atuado em projetos no exterior, completa o perfil de uma profissional de grande capacitação.
Jane Rolim Reis
Luciana é muito ativa, competente e atenta aos detalhes. Um grande talento que tive o privilégio de conhecer. Excelente pessoa e profissional.
Juliana Cacilda Diniz Borges
Mesmo após cloncluirmos a graduação mantemos contato frequente, principalmente por termos interesses profissionais em comum. Luciana é uma profissional em constante busca não só de renovação, mas também de aplicação de seus conhecimentos e habilidades técnicas e interpessoais. As experiências que vem somando em seu currículo, principalmente na gestão de projetos demonstra isto. O fato de ter atuado em projetos no exterior, completa o perfil de uma profissional de grande capacitação.
Jane Rolim Reis
Luciana é muito ativa, competente e atenta aos detalhes. Um grande talento que tive o privilégio de conhecer. Excelente pessoa e profissional.
Juliana Cacilda Diniz Borges
Mesmo após cloncluirmos a graduação mantemos contato frequente, principalmente por termos interesses profissionais em comum. Luciana é uma profissional em constante busca não só de renovação, mas também de aplicação de seus conhecimentos e habilidades técnicas e interpessoais. As experiências que vem somando em seu currículo, principalmente na gestão de projetos demonstra isto. O fato de ter atuado em projetos no exterior, completa o perfil de uma profissional de grande capacitação.
Experience
-
Ligga
-
Brazil
-
Mining
-
1 - 100 Employee
-
Project Manager
-
Nov 2022 - Present
Coordenação técnica de projeto CapEx com foco em Material Handling (Virador de Vagões, Stacker, Reclaimer, Shiploader e transportadores de correia) para o TUP – Terminal de Uso Privado Porto São Luís/MA Interface com planejamento estratégico e disciplinas elétrica, civil, automação, processo e arquitetura, para o atendimento a todos os requisitos legais com metas arrojadas e realistas de inovação para viabilizar e estabelecer os propósitos da empresa em se tornar um player relevante nos mercados da logística e mineração de forma competitiva e sustentável. Show less
-
-
-
MCA Auditoria e Gerenciamento Ltda
-
Brazil
-
Business Consulting and Services
-
700 & Above Employee
-
Senior Mechanical Engineer
-
May 2021 - Present
Gestão de Riscos de projetos de Novas Ferrovias da VALE: Análise e Monitoramento de Riscos utilizando as melhores práticas de mercado e lições aprendidas para controle, prevenção, eliminação ou mitigação dos impactos dos riscos. Conhecimento do Vale Production System – VPS. Visão abrangente para os riscos de reputação, engenharia, suprimentos, prontidão operacional e construção, comunidade, direitos humanos, gestão fundiária e meio ambiente de acordo com ferramentas e metodologias como AGIR – Análise e Gestão Integrada de Riscos, BWise, HIRA - Hazard Identification for Material Unwanted Events, HazOp. Show less
-
-
-
USIMINAS
-
Mining
-
700 & Above Employee
-
Project Engineer
-
Apr 2019 - May 2021
Responsible for investment studies and multidisciplinary projects related to steelworks CAPEX (Capital Expenditure), selecting the most beneficial projects for the company, until its implementation, when technical and financial feasibility is demonstrated. Compliance with maturity checks includes: - Preparation of budget, technical specifications and descriptive memorials. - Supervision of purchasing processes. - Analysis of productivity, capacity, financial return according to demands (with Industrial Engineering team), sustainability and safety Show less
-
-
-
Autônoma
-
Belo Horizonte Area, Brazil
-
Senior Consultant
-
Jan 2017 - Mar 2019
Conducting, with technical expertise, risk analyses and HazOp as an objective and impartial mediator for Chemical and Fertilizers Industries and assessments in administrative and judicial processes, in which individuals, legal entities and public bodies may be involved. Deliver reports that integrate the evidence that compose a judicial process to clarify technical issues and resolve doubts. Conducting, with technical expertise, risk analyses and HazOp as an objective and impartial mediator for Chemical and Fertilizers Industries and assessments in administrative and judicial processes, in which individuals, legal entities and public bodies may be involved. Deliver reports that integrate the evidence that compose a judicial process to clarify technical issues and resolve doubts.
-
-
-
Gerdau
-
Brazil
-
Mining
-
700 & Above Employee
-
Project Manager
-
Apr 2012 - Nov 2015
Responsible for evaluating most profitable and beneficial CAPEX (Capital Expenditure) projects for the company (melt shop, utilities, and logistics) and for maturing the study of them until their full implementation, when technically feasible. The purpose of investment studies was to evaluate financial returns, permanence in the market, sustainability, safety, productivity, and capacity, in order to select the most appropriate projects in mining and steel making. Helped to saved the company $10 million by preventing the installation of one unnecessary EBT furnace. Selected for an Accelerated Training Program whose main goal was to bridge the knowledge gap between different generations of engineers and educate all participants in an overview of the industrial areas, offering theoretical and practice training in steelworks, lamination, and all kinds of mechanical processing operations carried out by the various GERDAU manufacturing shops. This training resulted in collaborations between the engineers that improved communication and created connections among the team members. Implemented a Groundwater Catchment System as a rainfall–runoff response.(It was necessary to find an alternate water source to sustain operations during a drought.) Improved safety in crane operation, reducing the risk of crane accidents and injuries, and improved risk rating for the company’s physical barriers and electronic devices. Installed a CCTV Monitoring System for the EAF (Electric Arc Furnace) to allow operators to evaluate operation remotely, improving safety in the most critical risk area in the melt shop. Conducted studies for Critical Risks regarding an automatic stirring device for rinsing and homogeneity, Long Distance Belt Conveyor between the mine and the processing and treatment plant Relationships with stakeholders concerning tie-ins and boundaries between internal projects and public and private sector interests on projects such as pipelines, roads, and railway structures. Show less
-
-
-
MCA Auditoria e Gerenciamento Ltda
-
Brazil
-
Business Consulting and Services
-
700 & Above Employee
-
Mechanical Engineer
-
2010 - 2012
Using IPA and PMI techniques and best engineering practices to manage, support and develop international projects at VALE in Africa, Indonesia, Malaysia, Oman- (ports, hydropower plant, coal mining, nickel mining etc), such as Risk monitoring plan, Operational Readiness, Key Performance Indicators, in an environment with many cultural differences and challenges, keeping focus on results. Workshop e Management Manual VALE Oman/ Malaysia. HAZOP– VALE FERTILIZERS PEP (Project Execution Plan) - Camargo Correa Ciments Risk Monitoring and Control VALE Indonesia (ex-PTInco) PEP Karebbe Project (Hydropower Plant) PMO Structure – VALE Mozambique – Coal Mining Performing Maturity Analysis Nacala – VALE Mozambique Risk Analysis – Moatize – VALE Mozambique Provide training to increase knowledge and disseminate the corporate culture Show less
-
-
-
-
Project Coordinator
-
2008 - 2009
• Technical Coordination of mining projects Vale - Carajás - Pará, technique visit the mine and plant, accompaniment of projects involving disciplines of engineer: mechanics, metallic, concrete, civil, electric, implantation, systems, tubing and mineral process; • Calculations and projects of tanks of storage and processing of fuels, oil and grease - Petronas Lubricants. • Technical Coordination of mining projects Vale - Carajás - Pará, technique visit the mine and plant, accompaniment of projects involving disciplines of engineer: mechanics, metallic, concrete, civil, electric, implantation, systems, tubing and mineral process; • Calculations and projects of tanks of storage and processing of fuels, oil and grease - Petronas Lubricants.
-
-
-
Usiminas Mecânica
-
Brazil
-
Industrial Machinery Manufacturing
-
700 & Above Employee
-
Mechanical Engineer
-
2003 - 2008
Technical Coordination of projects as: Process Columns, tanks, reactors and Spheres to Oil and Gas Industry, Interface between areas of management of contracts, supplier, inspection of quality and methods and processes of manufacture. •Pressure vessels, tanks and process columns calculations using software PVElite, ASME VIII 1 and 2, ASME II, ASME B16.5, B16.47, API, Petrobra's N253, N268, N1862, N2012, ABNT NBR 6123, NR13, API 620, 650.• Training on SAP Technical Coordination of projects as: Process Columns, tanks, reactors and Spheres to Oil and Gas Industry, Interface between areas of management of contracts, supplier, inspection of quality and methods and processes of manufacture. •Pressure vessels, tanks and process columns calculations using software PVElite, ASME VIII 1 and 2, ASME II, ASME B16.5, B16.47, API, Petrobra's N253, N268, N1862, N2012, ABNT NBR 6123, NR13, API 620, 650.• Training on SAP
-
-
-
Ulster Carpets
-
Textile Manufacturing
-
100 - 200 Employee
-
Intern
-
2002 - 2003
Trainee job through IAESTE (International Association for the Exchange of Students for Technical Experience) in research and development of the manufacture process: increase the speed of the looms to improve the productivity keeping the quality of the carpets and security to the operators Trainee job through IAESTE (International Association for the Exchange of Students for Technical Experience) in research and development of the manufacture process: increase the speed of the looms to improve the productivity keeping the quality of the carpets and security to the operators
-
-
-
SMS group
-
Germany
-
Industrial Machinery Manufacturing
-
700 & Above Employee
-
Intern
-
2002 - 2002
Trainee of the sector of sales steel mill equipments,(rolling mills) Trainee of the sector of sales steel mill equipments,(rolling mills)
-
-
-
Banco do Brasil
-
Banking
-
700 & Above Employee
-
Intern
-
2001 - 2002
Project of Installation, maintenance and retrofitting of air conditioned systems. Project of Installation, maintenance and retrofitting of air conditioned systems.
-
-
-
CEMIG
-
Brazil
-
Utilities
-
700 & Above Employee
-
Intern
-
2000 - 2001
Retroffiting of air conditioner system, preventive maintenance of elevators. Retroffiting of air conditioner system, preventive maintenance of elevators.
-
-
-
Vale
-
Brazil
-
Mining
-
700 & Above Employee
-
Intern
-
1999 - 2000
Support to mining projects. Expediting, inspection and construction Support to mining projects. Expediting, inspection and construction
-
-
Education
-
Centro Federal de Educação Tecnológica de Minas Gerais
Engineer's degree, Mechanical Engineering -
Universidade FUMEC
Specialization - Post Diploma, Health and Safety Engineering -
IETEC
MBA, Project Management Specialization -
Universidade Federal de Minas Gerais
Specialist, Mechanical Project -
Centro Federal de Educação Tecnológica de Minas Gerais
Technician Engineering, Civil Engineering - Roads -
Colegio Imaculada Conceicao
secondary school, general