Lucas Pelaprat

Project Manager / Estimator at Atelier Premiere - New York
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
New York, New York, United States, US
Languages
  • Français Native or bilingual proficiency
  • Anglais Professional working proficiency
  • Espagnol Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Construction
    • 1 - 100 Employee
    • Project Manager / Estimator
      • Jun 2022 - Present

      • Responsible to deliver on time and on schedule large luxury residential projects throughout United States. • Work directly with the CEO to ensure design directions from Design Teams and General Contractors in implemented and follow technical challenges. • Responsible to deliver construction site supervision, project management, scheduling, budgeting, invoicing, and reporting to the group in France. • Participate in marketing and commercial efforts, and create new decorative finishes. • Build durable relationships with multiple AD100 firms (Jacques Grange, Grade, Tony Ingrao, Steven Volpe, Julie Hillman, among others…). • Responsible for Client, Architect, and General Contractor relationships (CNR, Reis Contracting, Uberto, Eurostruct…) Show less

    • Switzerland
    • Construction
    • 1 - 100 Employee
    • Building Works Engineer
      • May 2020 - May 2022

      Projects completed : Ecole du Plateau (School) 4'000'000 USD Deutsche Schule Genf (School) : 3’000’000 USD 3 buildings in Nyon: 4’500’000 USD 10 villas in Petit Lancy : 1'500'000 USD 6 villas in Anières : 1'500'000 USD Projects completed : Ecole du Plateau (School) 4'000'000 USD Deutsche Schule Genf (School) : 3’000’000 USD 3 buildings in Nyon: 4’500’000 USD 10 villas in Petit Lancy : 1'500'000 USD 6 villas in Anières : 1'500'000 USD

    • Switzerland
    • Construction
    • 1 - 100 Employee
    • Building Works Engineer / Cost Estimation Engineer
      • Apr 2016 - May 2020

      Building Works Engineer : Oversee all concrete structure aspect of projects : construction, occupancy, quality control, staffing, and budget management. Project resource allocation Supervise onsite personnel and subcontractors Review weekly inspection reports Interface with project inspectors, contractors, architects, engineers, and clients Projects completed or in progress : Geneva's University of Science large-Scale transformation . 4'500'000 CHF Vernier's School Extension : 1'600'000 CHF Vernier's School external insulation : 880'000 CHF Geneva's Museum of art and history transformation 60'000 CHF Geneva's school interior demolition : 60'000 CHF Chopard's factory transformation : 20'000 CHF Cost Estimation Engineer : Field of activity : reinforced concrete, civil engineering, masonry, transformation, demolition, external insulation, carbonatation, asbestos removal Main works Evaluate project cost Preparation of offers Response to tender Show less

    • France
    • Electric Power Generation
    • 700 & Above Employee
    • Research Engineer
      • Apr 2015 - Sep 2015

      Context and Objectives • The main purpose of this master thesis was to propose a first characterization of the plunge jets dynamic by a two phase flow approach. Technical Environment • Integrated to the research engineer team • 10 000 m2 testing laboratory • 5 m expérimental device Achievements • Conducting a literature review on the subject • Etablishment of a 5m high expérimental device imitates the movements of a plunging water jet issuing from an overflow nappe o Acquiring the speed of the water according to three different methods (high-speed camera, radar, current meter) o Data processing using the software Fudaa LSPIV o Formatting data and interpretations (Is there energy dissipation?) • Routines development to facilitate the data processing. • Sructural analysis to study the viability of the etablisment of a large-scale experimental device (12,5m) Results • The first results showed that we had a power dissipation of nearly 60% from theory Show less

    • Belgium
    • Engineering Services
    • 700 & Above Employee
    • Project Engineer
      • Apr 2014 - Aug 2014

      Context and Objectives • Feasibility Study and Detailed Design of Budhi Gandaki Hydropower Project (BGHPP). First major storage-type hydroelectric project in Nepal (Approximately 1000 MW installed capacity and 240m dam located on the Budhi Gandaki River): • Integration in a team of Nepali and French engineers and participation to the Feasibility Study and detailed Design of BGHPP Technical Environment • 2 french engineer (the project manager and his assitant) and outsourcing to a local Nepali company • Weekly telephone meeting with Paris • Computer with a CAD software Achievements • Took part in the design of the components (Dam and Powerhouse layout, spillways, drawings...) • Assisted in writing the technical note comparing the various types of dam (Arch gravity, Rockfill Dams, Concrete Face Rockfill Dams • Helped in design the Reservoir Operation Model (determining the final capacity hydropower plant installed) • Follow up of the geological investigations (data recording, reporting and site visit) • Carried out cost estimation for the various dams Results • Technical note comparing the various types of dam • CAD drawing Show less

    • Rail Transportation
    • 700 & Above Employee
    • Adminisitrative assistant
      • Jul 2013 - Aug 2013

      Context and Objectives • Introduction to working life programme Technical Environment • Engineering departement of The French National Railway Company Achievements • Archived documents • Classified files • Checked plans (Catenary plans) • Site visit Context and Objectives • Introduction to working life programme Technical Environment • Engineering departement of The French National Railway Company Achievements • Archived documents • Classified files • Checked plans (Catenary plans) • Site visit

    • Switzerland
    • Construction
    • 700 & Above Employee
    • Assistant worker
      • Jul 2012 - Aug 2012

      Technical Environment • Building site Achievements • Helped create an aquatic center • Helped create nuclear shelter • Built concrete walls Technical Environment • Building site Achievements • Helped create an aquatic center • Helped create nuclear shelter • Built concrete walls

Education

  • Ecole nationale des Travaux publics de l'Etat
    Master's degree, Civil Engineering
    2012 - 2015
  • Université Claude Bernard Lyon 1
    Master's Degree Research, Fluids Mechanics
  • Lycée Lafayette, Clermont-Ferrand
    Classe Préparatoire aux Grandes Ecoles (CPGE), TSI
    2009 - 2012
  • Lycée Louis Lachenal, Argonay
    Baccalaureate Science and technology, Civil Engineering
    2006 - 2009

Community

You need to have a working account to view this content. Click here to join now