Louis Nauman

Field Eng / E & I Commissioning Tech at Conam Construction Company
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Soldotna, Alaska, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Lyndon Strother

Excellent to work with, knowledgeable, good technical background..

Terra Burton

Lou has an extreme depth of knowledge, great analytical skills and a deep level of passion and commitment for the oil & gas industry. He is a top performer among his peers and an inspiring leader. Lou would be a great asset for any company and has my full endorsement.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Fire Protection: Fire Alarm Systems - Level II
    State of Alaska
    Feb, 2006
    - Oct, 2024
  • Electrician [Journeyman] (Refinery)
    State of Alaska
    Oct, 1996
    - Oct, 2024

Experience

    • Construction
    • 1 - 100 Employee
    • Field Eng / E & I Commissioning Tech
      • Jun 2018 - Present

      Checkout and Commission E & I Well Tie-ins. Fieldwide Facility and Drillsite Fire & Gas, Process and Medium Voltage MCC Upgrades Work with Automation, Facility E & I Techs and Vendors for Drillsite VFD & Downhole Pump Upgrades. Update P & IDs, Fire & Gas and electrical drawings for Doc Control. Checkout and Commission E & I Well Tie-ins. Fieldwide Facility and Drillsite Fire & Gas, Process and Medium Voltage MCC Upgrades Work with Automation, Facility E & I Techs and Vendors for Drillsite VFD & Downhole Pump Upgrades. Update P & IDs, Fire & Gas and electrical drawings for Doc Control.

    • United Arab Emirates
    • Engineering Services
    • 700 & Above Employee
    • E & I commissioning specialist
      • Mar 2016 - Jun 2017

      Checkout and Commission new CD-5 E & I Well Tie-ins, Update P & IDs and electrical drawings in SAP. Fieldwide OSD/ESD & Regulatory PMs/Testing, Fire & Gas PMs & Facility Instrument Workorders.

    • E & I Commissioning Specialist
      • Aug 2015 - Mar 2016

      Member of Pt Thomson Medium Voltage Commissioning Team: Commissioning and StartUp 3 Cat 1800-800 KW Standby gens and 2 dual fuel 10 Megawatt and 2 10-Megawatt Nat. Gas Solar’s, ABB & Powell power distribution and Siemens 5 Megawatt Loadbank operation and maintenance.

    • United States
    • Oil and Gas
    • 100 - 200 Employee
    • UOSS Automation, Fire and Gas FCO Supervisor
      • Dec 2012 - Aug 2015

      Responsible for multiple teams engaged in Functional Checkout and Commissioning & documentation of new and upgrade Fire & Gas/Automation projects across BPs Prudhoe Bay & Milne Point Units.

    • FCO Supervisor
      • Jun 2005 - Aug 2015

      Managed all aspects (Budget, Documentation, Engineering Interface) of Commissioning / Functional Checkout Teams working on New and Upgraded Process Control & Fire and Gas Systems in existing operational facilities and new modules. Supervised varies Projects and Upgrades to include: -Conoco: Alpine Water Handling (REIM, VFDs, Pump Stations (2 wells) Large capacity EOR H2O delivery system.-Conoco: Beluga Compressor Upgrade (9 new Recip. Compressor Mods & Infrastructure (Won Conoco Spirit Award for Project Excellence.-Conoco: CD3 Upgrade (New PLC 5, Automation, Controls, 800 KW Standby Gen Mod, 10 new Well Slots). -BP: Pipeline Replacement Project (8 sets REIMs Pig Launchers /Receivers & Skid 50 upgrade). Show less

    • Lead FCO Tech/Fire & Gas Specialist
      • Dec 2001 - Aug 2015

      Contributed dynamic technical skills in constructing, installing and commissioning Allen Bradley SLC, PLC-5 & Moore APACs PLC’s, with full accountability for the effective installation and calibration of measurement and control devices including skid cals and control upgrades on GE Frame 5 and Ruston turbines.• Developed and executed strategies supporting enterprise-wide operations including resolving construction deficiencies and engineering omissions, redlining drawings and checking project documentation for accuracy. • Planned, coordinated and facilitated FCO DCS/PLC I/O, Loops and Local/Remote Indications functions to optimize productivity, efficiency and quality Show less

    • Fire & Gas Specialist
      • 2007 - 2007

      Checkout and Commissioning of small Fire and Gas upgrades. (FAT, Fire Panels, 10 -50 devices). Complete such work in accordance with CPAI specs and NFPA. Maintain records of work.• Scheduled and completed Quarterly Fire and Gas PMs; correct deficiencies or write work orders for same.

  • VECO Reddog
    • North Slope Borough County, Alaska, United States
    • Field Engineer/Leadtech
      • 2001 - 2001

      Directly supervised instrument crew; oversaw demo/installation/calibration of control and measurement devices. • Solved field installation and engineering problems in line with client and employer goals; worked efficiently with Crafts to complete project milestones. Directly supervised instrument crew; oversaw demo/installation/calibration of control and measurement devices. • Solved field installation and engineering problems in line with client and employer goals; worked efficiently with Crafts to complete project milestones.

  • Veco BP/Northstar
    • North Slope Borough County, Alaska, United States
    • FCO Lead E & I Tech
      • 2000 - 2001

      Managed 3 Electricians, 6 Inst. Technicians and 2 Inst. Fitters; collaborated with QA/QC and other Craft to clear Punchlist / IWL items; inspected vendor skid construction for completion per P & ID, while ensuring compliance with NEC, engineering details and client specifications. • Conducted comprehensive point-to-point loop checks, ensuring Loops and Vendor skids are 100% prepared for commissioning. Transmitters; Mag. Flow, Coriollis & Turbine Flowmeters; I/P’s, P/I’s; Installation of LAN's (Hubs, Servers, Workstations, cabling). • Spearheaded diverse technical activities ranging from redlining P&ID’s, stroking control valves and checking failure mode to documenting deficiencies, creating internal Punchlist and ordering parts. Show less

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • I & E Tech / QC ARCO Alpine Development
      • 1999 - 2000

      Prepared drawings/documentation to close Engineering Action items, assisted by Engineering. Established key relationships and liaised with management, clients, Craft, Supervision and Engineering. • Successfully examined all Modules and Drillsite to verify compliance with Engineering details and drawings, as well as inspecting work in progress for NEC and ISA compliance. Prepared drawings/documentation to close Engineering Action items, assisted by Engineering. Established key relationships and liaised with management, clients, Craft, Supervision and Engineering. • Successfully examined all Modules and Drillsite to verify compliance with Engineering details and drawings, as well as inspecting work in progress for NEC and ISA compliance.

  • Airtek Inc. - Unocal Chemicals, Foxboro
    • North Slope Borough County, Alaska, United States
    • Lead E * I Tech
      • 1998 - 1999

      Steered installation and instrument upgrade of Foxboro I/A DCS, Operator Interface & workstations; converted Pneumatic to Electronic Instrumentation in Plant 1, including new wiring and conduit, field junction boxes, Controllers, Transmitters IP's & PI's and complete Instrument & Electrical package. Steered installation and instrument upgrade of Foxboro I/A DCS, Operator Interface & workstations; converted Pneumatic to Electronic Instrumentation in Plant 1, including new wiring and conduit, field junction boxes, Controllers, Transmitters IP's & PI's and complete Instrument & Electrical package.

Community

You need to have a working account to view this content. Click here to join now