Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Construction
    • 1 - 100 Employee
    • Contracts Manager
      • Nov 2022 - Present
    • United Kingdom
    • Construction
    • 1 - 100 Employee
    • Contracts Manager
      • Jan 2022 - Oct 2022

    • Site Manager
      • May 2021 - Jan 2022

    • Lead Engineer/ Site manager
      • Jun 2020 - Oct 2021
    • United Kingdom
    • Construction
    • 100 - 200 Employee
    • Senior Engineer
      • Nov 2019 - Jun 2020
    • United Kingdom
    • Real Estate
    • 1 - 100 Employee
    • Site Manager
      • May 2019 - Nov 2019
    • United Kingdom
    • Construction
    • 1 - 100 Employee
    • Engineering/Site Manager
      • Feb 2018 - Aug 2019

      Working in a site management/Engineering role overseeing engineering aspects of the contruction and fit out of a new Aldi RDC project . Working closley with main contractors and their engineers to ensure programmed works are carried out in accordance to specification and on time Working in a site management/Engineering role overseeing engineering aspects of the contruction and fit out of a new Aldi RDC project . Working closley with main contractors and their engineers to ensure programmed works are carried out in accordance to specification and on time

    • United Kingdom
    • Leasing Non-residential Real Estate
    • 1 - 100 Employee
    • Site Engineer
      • May 2017 - Feb 2018

      Working as a key member of Galliford try site team at east midlands airport working on different aviation contracts and delivering various aspects of the framework works within the airports surroundings airside and land side. Responsible for the engineering of airside/ landside projects across east midlands airport. Such projects include the likes of construction of various carparks and drainage around the airport, the construction of a new access road on a greenfield site monitoring the initial earthworks working closely with the contractor right through the construction process setting out of ducting, drainage, kerbing and surfacing. Working on the November closures of the runway tasks included re-surfacing, surveying and concrete repairs of the aprons and stands. Responsibilities include • Working closely to forge relationships with the client to ensure successful delivery of the client’s requirements. • Undertaking all setting out and aspects of the design from the initial survey through to the final construction phases. • Collating information for H&S files along with As-Built drawing information. • Collaborate with the airside operations teams to carry out inspections of all major airside assets such as the runway. • Form part of the emergency response team enabling any operation assets to be brought back online in a speedy fashion. • Sufficient in the use of CAD and 3D modelling software. • Monitoring the Health and safety actions of men on site. • Implementing a comprehensive permit to work system. • Producing and implementing ITP’s Show less

    • United Kingdom
    • Site Engineer
      • Feb 2017 - May 2017

      Currently working as a Civil engineer on a new link road in Nottingham for Boots Company works include S38- S278 works kerbing, Ducting, Planar ramps and road and footpath construction. Currently working as a Civil engineer on a new link road in Nottingham for Boots Company works include S38- S278 works kerbing, Ducting, Planar ramps and road and footpath construction.

    • United States
    • Real Estate
    • 1 - 100 Employee
    • Site Engineer
      • May 2014 - Feb 2017

      Working within the Rolls Royce nuclear submarine sector in Derby. project value (40 million).Building the new Energy and Reception buildings, chemical stores, manufacturing facility (MF1B) and the associated infrastructure. The specific building works included: • Installing pre-cast concrete service trenches, covers and retaining walls. • Infrastructure works including roads and car parks - consisting of road make up construction and road surfacing, • Drainage Installation of storm water and foul water manholes and drainage runs up to depths of 2.5 – 3m. • Construction of reinforced concrete foundations, walkways, bund walls and drainage surrounds, this included very precise setting out and level control for the several types of concrete construction. • Seecant piling walls and the associated deep earthworks excavation to the buildings formation layer and foundations. Show less

Education

  • Basford Hall
    civil engineering, Civil Engineering
    2013 - 2015

Community

You need to have a working account to view this content. Click here to join now