Lewis Johnson
Quality Engineer/Manager ASME Quality Control at Babcock Power- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Babcock Power
-
United States
-
Oil and Gas
-
300 - 400 Employee
-
Quality Engineer/Manager ASME Quality Control
-
Apr 2015 - Present
-
-
-
Valmet Power North America
-
Zhangjiagang China and Zigong China
-
Senior Manufacturing Advisor
-
Jul 2013 - Apr 2015
Oversee Manufacturing and Quality for the Indonesia PT CIKARANG CFB Boiler Project that was fabricated in Zhangjiagang China and the Thailand SCL WANGSALA Recovery Boiler Project, this project was fabricated in Zigong China. Oversee Manufacturing and Quality for the Indonesia PT CIKARANG CFB Boiler Project that was fabricated in Zhangjiagang China and the Thailand SCL WANGSALA Recovery Boiler Project, this project was fabricated in Zigong China.
-
-
-
Babcock Power
-
United States
-
Oil and Gas
-
300 - 400 Employee
-
Principal Quality Engineer
-
Nov 2010 - Jun 2013
Brightsource Solar Project Asheville Wateree Hoosier ETEC Duke Belews Creek All fabricated in Zhangjiagang, China Brightsource Solar Project Asheville Wateree Hoosier ETEC Duke Belews Creek All fabricated in Zhangjiagang, China
-
-
-
International Quality Consultants, Butler, PA
-
United States
-
Business Consulting and Services
-
1 - 100 Employee
-
Quality Control/Quality Assurance, CWI and Level II MT and PT
-
Dec 2009 - Oct 2010
Quality Control at the Devon Repowering Project in Milford, CT. Quality Assurance at Wright Industries on a Centrifugal Contactor Module. ASME NQA-1 Quality Control at the Devon Repowering Project in Milford, CT. Quality Assurance at Wright Industries on a Centrifugal Contactor Module. ASME NQA-1
-
-
-
Babcock Power
-
United States
-
Oil and Gas
-
300 - 400 Employee
-
Senior Quality Engineer
-
Jun 2007 - Jul 2009
-
-
-
Aker Kvaerner
-
Oil and Gas
-
400 - 500 Employee
-
Production Supervisor
-
Aug 2000 - Apr 2007
Managed up to 50 employees at one time. Supervise the fabrication of pressure parts for coal fired boilers which included, water walls, superheaters, reheaters, long flow econmoizers, headers, tube bending operations, machining operations, SAW, FCAW, SMAW and GTAW welding processes. Controlled the shop manpower to meet schedule requirements.Reviewed the shop floor workers time sheets. Managed up to 50 employees at one time. Supervise the fabrication of pressure parts for coal fired boilers which included, water walls, superheaters, reheaters, long flow econmoizers, headers, tube bending operations, machining operations, SAW, FCAW, SMAW and GTAW welding processes. Controlled the shop manpower to meet schedule requirements.Reviewed the shop floor workers time sheets.
-
-