Leon Brady

Project Manager at Sub Sea Services AS
  • Claim this Profile
Contact Information
Location
Greater Stavanger Region, NO

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Norway
    • Oil and Gas
    • 1 - 100 Employee
    • Project Manager
      • Oct 2021 - Present

    • Norway
    • Oil and Gas
    • 100 - 200 Employee
    • Senior Project Engineer
      • Sep 2020 - Sep 2021

      Responsible for managing all Balder X Future mobilizations and transportation of SPS equipment. This includes mobilisation planning, scheduling, cost/benefit optimization and coordination for the mobilisation of 6 different vessels ranging from HLV, CSV’s and AHT’s for approximately 21 mobilizations in 2021. In addition, transportation supervision and coordination of all large SPS structures (manifold, templates, reels, mooring equipment etc.) from various fabrication site and. Responsible lead and coordinate a team of 6 mobilisation engineers, in 3 different site locations.

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • IMR Lead/Field Engineer/ Specialist Project Engineer
      • Jan 2014 - Sep 2020

      Field/ Specialist/ Lead IMR Engineer2019 -2020 – Lead IMR Engineer – Equinor Operated Fields Tasked as the IMR Operations Leader, responsible for directing and leading the IMR engineering team (onshore and offshore), project scope management and scheduling, responsible to ensure scope outline planning and execution were completed in a safe but efficient manner, produce scope budget estimations, preform overall scope risk analysis, perform cost close-outs, provide input to sub-contracts, ensure budget performance/targets were met and be the main client interface with regards to technical aspects for all IMR operations in TechnipFMC Norge.2018 -2019 – Specialist Engineer – Survey, Inspection, Commissioning and Pipeline RepairOffshore lead.2015- 2018 – Offshore Installation/Commissioning Lead – Åsgard Subsea Compression System Under the Åsgard Subsea Compression contract with Equinor. My responsibility was to lead all technical aspects of the offshore operation from mobilization through to completion for the installation, hook-up and commissioning of the Åsgard Subsea Compression System.2015- 2019 - IMR Field Engineer – Equinor Operated Fields Responsible for ‘standard’ IMR works and Åsgard Subsea Compression System Field Engineer. I have been involved in a wide range of ‘standard’ IMR works and heavy construction works, these include decommissioning scopes (structures, templates, well bore, riser, pipeline removal), BOP deployment and recovery, FCM and MCM change outs, emergency recovery operations, fault-finding on manifold and wellhead systems, multiple flying leads recovery and installation, multiple pipelay (rigid and flexible) dynamic and static, jumper installations, umbilical installations, multiple spool installations with various configurations, pipeline repair and connection, RFO, pigging operations, valve operations, commissioning of manifolds and XT’s, survey, suction anchor installation and removal, multiple tie-ins.

    • Field Engineer
      • Jan 2012 - Dec 2013

      Primarily working as a Field Engineer onboard Normand Clipper, was varied, challenging and exciting. My role as the F.E. was to be focal point for all technical issues relating to O.I.’s work scopes, ensuring a smooth transition from onshore engineering to offshore. This included writing of Task Plans/Procedures, completing offshore scopes of work, ensuring good communication flow from onshore to the vessel and vice versa. commissioning of a 90Te VLS, 1500Te Carousel and 2off ROV Systems (Magnum and Millennium Class) being integrated onto the vessel, being specifically tasked to engineer all heavy lifts with a heavy lift vessel or vessel crane. During this time I was involved in multiple flex lay and multiple riser installations (pliant and reverse pliant) utilizing HLS and VLS spreads , template, cover, spool, static umbilical, flowline and jumper installations, suction can, multiple subsea tie-ins (ROVCON, AKER RTS and ICARUS), various survey campaigns, RFO operations, IMR, rock removal, dredging and acoustic coring campaigns.

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Senior Project Engineer/Lead Engineer
      • Aug 2008 - Dec 2011

      My role as a Lead/Senior Project Engineer in Subsea 7 was to plan and execute scopes of work, primarily for offshore. My project work to included numerous subsea installations specializing in diving and ROV operations, flex lay, riser installation, heavy construction and offshore platform operations. Areas which were required as standard was project coordination and follow-up, selection of subsea installation equipment, conducting risk assessments, presenting HAZOP/HIRA’s, writing procedures, excellent knowledge of rigging and subsea installation practices. I was involved in many tenders and projects in this time. I was also a Client Rep for a number of trips on the Grand Canyon. Projects include Vigdis Spool and Cover Installation, Visund Future Risers, Snorre B Riser Installation, Valhall Rigid Riser Installation, Valhall Gas Flanks, Ula Platform Subsea Clamps Installation, Ormen Lange Tripod Installation, BP Valhall Conductor Guide Retrofit, Hess South Arne Towhead Bundle Installation. My lead role while working for Subsea 7, was for the diving scope in Hess South Arne Towhead Bundle Installation, which comprised of 18 spools, 8 diver assisted pull-ins, 2 umbilical connections and concrete mattress installation. I was also employed as the Field Engineer onboard Seven Pelican and Toisa Perseus for short periods.

    • Civil Engineering
    • 700 & Above Employee
    • Field Oceanographic Engineer
      • Nov 2007 - Aug 2008

      Working for Fugro GEOS my responsibilities were to install and retrieve oceanographic equipment subsea in remote locations of S.E Asia (Indonesia, Burma, Vietnam, Malaysia and Australia). Roles and responsibilities also included procurement, logistics coordination and install/recover equipment from vessels or platforms. Other roles included mooring design analysis, engineering, sourcing and procuring specialised subsea equipment. Reasons for leaving, was join Subsea 7’s graduate engineer program.

    • Indonesia
    • Chemical Manufacturing
    • 1 - 100 Employee
    • Graduate Project Engineer
      • Nov 2006 - Mar 2007

      My main roles as field engineer was to manage, coordinate, procure and install marine project based equipment primarily for the Arthit topside float-over project, my other roles on various smaller projects included inspection, auditing, commissioning and commercial dive coordination. By gaining experience as a field engineer, this gave me the necessary tools to complete project based work in a management/engineering environment. Reason for leaving, was to complete my bachelor’s degree. My main roles as field engineer was to manage, coordinate, procure and install marine project based equipment primarily for the Arthit topside float-over project, my other roles on various smaller projects included inspection, auditing, commissioning and commercial dive coordination. By gaining experience as a field engineer, this gave me the necessary tools to complete project based work in a management/engineering environment. Reason for leaving, was to complete my bachelor’s degree.

Education

  • Australian Maritime College
    Bachelor of Ocean Engineering, Engineering
    2004 - 2007
  • Victoria Point State High School
    Bachelor of Engineering (BEng), Ocean Engineering
    2001 - 2002

Community

You need to have a working account to view this content. Click here to join now