Leo Cavalli

Project Manager at HERRENKNECHT TUNNELLING SYSTEMS USA, INC.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Belén de Escobar, Buenos Aires Province, Argentina, AR
Languages
  • Español Native or bilingual proficiency
  • Inglés Native or bilingual proficiency
  • Italiano Native or bilingual proficiency
  • Portugués Full professional proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Ing Nuncio PICCIONE

Leo es un excelente profesional, un líder nato , muy responsable y muy honesto

LinkedIn User

Léo Cavalli um profissional completo, com grande conhecimento em perfuração de túnel TBM e Fabricação de Dovelas, alem de ser grande líder, domina muito bem os idiomas Espanhol, Português , Italiano e inglês.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Construction
    • 1 - 100 Employee
    • Project Manager
      • Feb 2021 - Present

      TBM's Assembly, Commissioning, technical assistance & Troubleshooting.Purple Line Lot 2 Subway Project. Los Angeles, California.Ship Canal Water Quality Project. Seattle, Washigton.I-75 Modernization Project (segm. 3). Detroit, Michigan. TBM's Assembly, Commissioning, technical assistance & Troubleshooting.Purple Line Lot 2 Subway Project. Los Angeles, California.Ship Canal Water Quality Project. Seattle, Washigton.I-75 Modernization Project (segm. 3). Detroit, Michigan.

    • Project Manager
      • Feb 2017 - Dec 2021

      - EPB and Mix Shield soft ground TBM's assembly, commissioning, start-up, technical assitance and refurbishment for Riachuelo Sanitization Project, Lots I and III.- EPB TBM, Pipe Jacking Slurry machine, pre-cast segment Factory and all secondary equipment assembly, commissioning, startup and technical assistance for Vega Outfall Project. - EPB and Mix Shield soft ground TBM's assembly, commissioning, start-up, technical assitance and refurbishment for Riachuelo Sanitization Project, Lots I and III.- EPB TBM, Pipe Jacking Slurry machine, pre-cast segment Factory and all secondary equipment assembly, commissioning, startup and technical assistance for Vega Outfall Project.

    • Germany
    • Machinery Manufacturing
    • 700 & Above Employee
    • Project Manager
      • Nov 2015 - Feb 2017

      2 Hard Rock, open Gripper TBM's assembly, commissioning, start-up and technical assitance for Alto Maipo Hydraulic Exploitation Project 2 Hard Rock, open Gripper TBM's assembly, commissioning, start-up and technical assitance for Alto Maipo Hydraulic Exploitation Project

    • Production Coordinator / Plant Manager / Chief Engineer
      • Sep 2003 - Oct 2015

      Jobsite planning and mobilization. Mechanized tunneling operation, logistics, maintenance and management. TBM Secondary structures design and implementation. Pre-cast segment factories and associated concrete batching plants assembly, commissioning and refurbishment. Tunnelling backfilling and precast concrete definition. Cablecar construction logistics, high capacity cranes rigging plans and operation. Interdisciplinary crews leadership.- Construtura Norberto Odebrecht – Caracas VenezuelaSeptember 2003 –April 2009 Line IV Subway Project, Caracas, Venezuela (2 Herrenknecht EPB TBMs final drives, disassembly and final disposition. Bernold Ceresola Pre-cast segment Factory Operation, Management and Maintenance) Line III Subway Project in Caracas Venezuela (Main Subcontractor administration, and follow up. 1 Open Mode Lovat TBM and Subway underground civil works). Line V Subway Project, in Caracas, Venezuela (Bernold Ceresola Pre-cast Segment Factory re- commissioning and startup) Caracas-Guarenas-Guatire massive Transportation System, Caracas, Venezuela (Bernold Ceresola Pre-cast Segment Factory re-commissioning and Startup) MetroCable Cable Car Project, Caracas, Venezuela. (Plant Management, Dopplemayr Cablecar assembly, high-capacity cranes logistics, rig planning and jobsite coordination)- Constructura Norberto Odebrecht – Buenos Aires, Argentina.(April 2009 – October 2014) Aguas del Parana Water Sanitization Project, Buenos Aires Argentina (2 Herrenknecht EPB TBMs Operation, Management and Maintenance; Tunnelling Plant Manager. Technical support for Herrenknecht Formwork Pre-cast Segment Factory operation and maintenance).- Construtora Norberto Odebrecht – São Paulo, Brazil.(January 2015 – October 2015) Consorcio Expresso Linha 6 subway Project, São Paulo, Brasil. (CBE Pre-cast segment factory assembly, commissioning and startup)

Education

  • Universidad Central de Venezuela
    Ingeniero Mecánico / Mechanical Engineer, Ingeniería mecánica
    1994 - 2002

Community