Chris Jia

Production Planning and Control、Project Management at Beijing Benz Automotive Co., Ltd.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Daxing District, Beijing, China, CN
Languages
  • Chinese Native or bilingual proficiency
  • English Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • China
    • Motor Vehicle Manufacturing
    • 100 - 200 Employee
    • Production Planning and Control、Project Management
      • Jul 2016 - Present

      ● Based on BBAC strategy, make and publish New Variant Engine 2 to 3 years long-term plan (Input from sales, capacity calculation, machine modification, production ramp up, product export and shift arrangement) ● Based on strategic planning, make and publish the yearly short-term operational plan (15 variants serial engines, 15 variants M274 CN6 engines, 12 variants M264 engines and 3 variants M282 engines, 520K production volume) ● Lean inventory control, safety stock is 1.8 days. 0.4 day decrease when compare with last year, reduce 21million funds occupation per year ● Be the project coordinator of logistics, coordinate with logistics cross function departments (Logistics MRP, logistics planning, logistics operation, packaging), ensure to fulfill the new variant engine project timeline (15 variants M274 CN6 engines, 12 variants M264 engines and 3 variants M282 engines) ● Tryout, ramp up and launch of new variant engines (15 variants M274 CN6 engines, 12 variants M264 engines and 3 variants M282 engines) ● Engine plant two construction project, system update and improvement, roll out and implementation (AS and Machining of PT1 green release) ● Machining parts of M282 (21000 Pcs) export and deliver to Germany (Customer input, capacity evaluation, preparation for pre-production, business contract, quality release, packaging, storage and transportation) ● EOP of model year engines (13 variants engines complete hard change, accuracy is 100%) ● Make and publish weekly, monthly and annual business performance report to management level, monitor the core KPI of assembly ● Create and improve production planning related processes (Aim and purposes, KPI, frequency). Set up process center of Production Management Department Show less

    • MHE (Material Handling Engineer) and BAM (Business Application Manager)
      • Apr 2015 - Jul 2016

      ● Design logistics running mode for each part used on different engines (material internal transfer, box market, picking sequence, feeding line route and frequency, window time) ● Cooperate with PE (Productivity Engineer) and ME (Manufacturing Engineer), engaged in the design of logistics driveway and flow rack on production lineside, build a lean logistics delivery system ● Create PFEP database, maintain the master data into system timely and precisely. Write OIS for logistics operation ● Evaluate and change the layout design, equipment when get the information which will affect logistics operation (change order, PSA change, storage bin change and packaging change) ● Take charge the purchasing job for logistics equipment (forklift, tug, label printer, scanner, packaging machine) ● To be the project coordinator of logistics department, involved in the construction of cylinder block line and cylinder head line to make logistics design, SAP system creation and the following implementation job ● To be the project coordinator of logistics department, involved in the construction of base assembly line and final assembly line to do SAP system creation, UAT and the interface creation between SAP and MES ● Arrange, coordinate and participate the HANA consolidation UAT test project ● Upgrade, improve and maintain SAP system ● Requirement and IT input of blank warehouse for machine line and the warehouse layout design job Show less

Education

  • Cardiff University / Prifysgol Caerdydd
    Master of Science (MSc), logistics and operations management
    2012 - 2014

Community

You need to have a working account to view this content. Click here to join now