Lee Dumas
Director - Construction Services at WSP | Parsons Brinckerhoff- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
WSP | Parsons Brinckerhoff
-
Israel
-
Executive Offices
-
1 - 100 Employee
-
Director - Construction Services
-
Sep 2020 - Present
Subject Matter Expert (SME) California High Speed Rail Program; Chief Sustainability Compliance Analyst California High Speed Rail Program; Construction manager/resident engineer and/or rail inspector rail transit projects; Claims and changes management; Business development; Oversight of in-progress design plans, specifications, and cost estimates ; Program Management of Transit Station design/construction, Parking Garages, & Rail Yards: Envision Sustainability Professional | Certified Transportation Planner, USC | Construction Cost Estimator, SMU | Risk Management, AGC/ASCE| Caltrans SWPPP Certification |C-10 Licensed Electrical Contractor #799733 (In-Active) | Cal/OSHA 30, AMTRAK Safety Certifiation|P6/MSProject/SureTrak Scheduling Programs |Autodesk Land Desktop/AutoCAD Civil 3D/AutoCAD 2016-2021. Show less
-
-
-
Segma Engineering Group
-
Sacramento, CA
-
Program Manager
-
Jun 2010 - Present
Rail Transit Program Management - Houston, TX, Sacramesnto, CA. Currently providing construction management services and business development for California projects, including design and construction oversight for repair and upgrade of institutional facilities. Rail Transit Program Management - Houston, TX, Sacramesnto, CA. Currently providing construction management services and business development for California projects, including design and construction oversight for repair and upgrade of institutional facilities.
-
-
-
PBS&J
-
Norfolk, Virginia
-
Utility Coordinator/Resident Engineer
-
Mar 2008 - Jan 2009
Provided oversight of systemwide utility relocation and onsite resident engineering for two HRT construction contract segments, an 8 mile dual track project from Norfolk State University to New Town Road at the Virginia Beach city limits and the LRT Vehicle Storage and Maintenance Facility, between Brambleton Avenue and Ballentine Blvd., in Norfolk. Provided oversight of systemwide utility relocation and onsite resident engineering for two HRT construction contract segments, an 8 mile dual track project from Norfolk State University to New Town Road at the Virginia Beach city limits and the LRT Vehicle Storage and Maintenance Facility, between Brambleton Avenue and Ballentine Blvd., in Norfolk.
-
-
-
City of Modesto
-
Government Administration
-
300 - 400 Employee
-
Program Manager
-
Feb 2004 - Mar 2007
Program manager and head of the City’s Administrative Unit for the Kaiser Modesto Medical Center Project, a $800 million Medical Center construction program on a 38.7 acre parcel on Dale Road. Supervised the City’s project team responsible for review and permitting of the general civil design of the hospital facility, including the architectural, mechanical, electrical, plumbing and HVAC subsystems. Was responsible for enforcing the September 7, 2004 Kaiser/City Development Agreement and Kaiser’s Conditions of Approval. Presented monthly project updates to the Planning Commission and City Council, assisted in public out reach programs and stakeholder presentations. Coordinated project activities with state and local agencies such as OSHPD, LAFCO, Stanislaus County, Caltrans, and StanCog. Monitored final entitlements associated with the project and completion of occupancy requirements. Completed the planning and design services procurement for construction of four major highway elements associated with the Kaiser project. Designed and supervised the onsite construction of a new water well on Hospital grounds including SCADA equipment and emergency power. Show less
-
-
-
Carter Burgess
-
Sacramento, CA
-
Project Manager
-
Jun 2003 - Feb 2004
Project Manager for Commercial and Residential Land Development Projects: including Genral Civil Site Improvements: Design PS&Es for both commercial and residential land development projects, including: the Citadel Equities – Rocklin Lot 58: Designed preliminary and final grading, street improvements, and utilities; Completed a master plan study, tentative vesting map, and subdivision layout. Designed commercial developments requiring a vesting tentative map, undergrounding of a major regional flood control channel, on-site grading and drainage design, and design of a sewer lift station. Show less
-
-
-
Spink Corporation
-
Sacramento, CA
-
Senior Associate Project Manager
-
Apr 1998 - Sep 2000
Project Manager in the bridge and highway design group, Developed the geometric design for the Douglas Blvd./Interstate 80 Interchange reconstruction project in the City of Roseville. Supervised the final 65% redesign of the interchange including my proposed 3000 ln ft cut-and-cover tunnel connection from Southbound Sunrise Avenue to Eastbound I-80 on ramp, which eliminated three aerial overcrossings and greatly reduced the complexity of the construction staging under the original interchange design. Show less
-
-
-
-
Project Manager
-
Jun 1995 - Apr 1998
Deputy Construction Manager and Chief Rail and Trackwork Inspector for the Terminal Island Container Transfer Facility, the New Dock Street Realignment and Rail Extension for the Port of Los Angeles. The facility was constructed under existing yard operations and with no interference with on-going train operations. Served on the construction review committee for the Port of Los Angeles Henry Ford Bridge construction. Was designated Resident Engineer for the UPRR and BNSF railroad grade separation project on the north segment of the Alameda Corridor Project. Show less
-
-
-
Willdan Associates
-
Anaheim, CA
-
Project Manager
-
Jun 1989 - Oct 1991
Supervising Engineer Rail Transit Division, managed preliminary studies of high-speed rail feasibility in the Las Vegas to Anaheim Corridor, provided design-build construction support services for the eastern terminus of the San Joaquin Hills Transportation Corridor project. Completed design of 5 miles of the I-5 freeway widening including reconstruction of 6 Caltrans bridges. Supervising Engineer Rail Transit Division, managed preliminary studies of high-speed rail feasibility in the Las Vegas to Anaheim Corridor, provided design-build construction support services for the eastern terminus of the San Joaquin Hills Transportation Corridor project. Completed design of 5 miles of the I-5 freeway widening including reconstruction of 6 Caltrans bridges.
-
-
-
WSP
-
Canada
-
Professional Services
-
700 & Above Employee
-
Deputy Construction Manager/Senior Resident Engineer
-
Mar 1976 - May 1989
Served in various construction management positions on several nationally significant rail transit projects in Atlanta, Pittsburgh, and Los Angeles. Supervised the construction program plan and schedule for Los Angeles rail transit Blue and Green line projects. Coordinated the structural design, environmental clearance, architectural and utility design interface of the Los Angeles River Bridge Construction, the Mid-Corridor Aerial Structures, Compton Creek Bridge, and over $2.0 Billion in dual highway/transit construction work with Caltrans, the Office of the State Architect, the State Fire Marshall, the County of Los Angeles, and the various corridor cities involved in the LRT program, including the cities of Los Angeles and Long Beach. Show less
-
-
Project Manager
-
Apr 1983 - Aug 1985
Pittsburgh Assignment: Area Resident Engineer on the Port Authority of Allegheny County Light Rail Construction Project. Was in charge of all construction in the Pittsburgh central business district. Supervised the construction of over $130 million in on-going construction work in the city including construction of four major multi-level transit stations and a mid-rise office building (The Azen Building at Wood Street and Sixth Avenue).
-
-
Project Manager
-
Mar 1976 - Apr 1983
Atlanta Assignment: Resident Engineer/Area Office Engineer on the Metropolitan Atlanta Rapid Transit Authority Heavy Rail Construction Project. Was in charge of West Line construction projects which included several post-tensioned rail and highway bridges: multi-level transit stations; and hard and soft ground tunneling construction.
-
-
Education
-
Georgia State University
MBA, Operations Management and Supervision -
Lamar State University
B.S, Civil Engineering