Leanna Martinez
Engineer and Project Manager at PESCO - Process Equipment & Service Company, Inc.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
PESCO - Process Equipment & Service Company, Inc.
-
United States
-
Oil and Gas
-
1 - 100 Employee
-
Engineer and Project Manager
-
Jul 2019 - Mar 2022
-
-
-
-
Consultant
-
May 2018 - Jul 2019
-
-
-
-
Stay at home mom
-
Sep 2016 - May 2018
Farmington, New Mexico
-
-
-
ConocoPhillips
-
United States
-
Oil and Gas
-
700 & Above Employee
-
Completions Engineer
-
Nov 2014 - Oct 2016
Houston, Texas Area My responsibilities include completing horizontal plug and perf wells drilled in the Eagle Ford shale. Worked projects with fiber optic, RA tracer, and new plug technology.
-
-
Well Intervention Engineer
-
May 2013 - Nov 2014
Farmington, NM Provided engineering support for remedial and plug & abandonment rig activities in the San Juan Basin. Activities completed on conventional and coal bed methane wells with plunger lift, convectional rod pumps, 3-tube rod pump, Texas stripper rod pump, and casing failures.
-
-
Completion Engineer
-
Feb 2013 - May 2013
Farmington, NM Completed vertical conventional wells in the San Juan basin.
-
-
Facilities Engineer
-
Dec 2010 - Feb 2013
Farmington, NM Provided engineering support on standards, large facility designs, and management of change. Was the single point of contact for Pressure Relief Design, evaluated SWD SPCC plans, and evaluated emissions for Sub Part W tank emission using HYSYS.
-
-
Artificial Lift Engineer
-
Jun 2009 - Dec 2010
Farmington, NM Provided engineering support for artificial lift, specializing in sucker rod pumps. Also worked with plunger lift, and HDI pumps. Worked standards by building and maintaining a failure tracking database for rod pumps. Designed rod strings using both RODSTAR and SROD. Worked with 3-tube pumps, texas stripper pumps, poly lined tubing, and fiber rods.
-
-
-
ConocoPhillips
-
United States
-
Oil and Gas
-
700 & Above Employee
-
Summer Intern-First Delivery
-
May 2008 - Aug 2008
Farmington, NM Completed a project to create an artificial lift selection guide for the San Juan basin First Delivery group and a project for compressor building enclosures to determine if they fall into Class 1 Div 1.
-
-
-
ConocoPhillips
-
United States
-
Oil and Gas
-
700 & Above Employee
-
Summer Intern-Compression
-
May 2007 - Aug 2007
Farmington, NM Completed an economic evaluation of compressor options and isometric drawings for compressor skids.
-
-
-
Western Refining
-
United States
-
Oil and Gas
-
400 - 500 Employee
-
Summer Intern
-
May 2006 - Aug 2006
Bloomfield, NM Worked as a lab technician, testing samples from various points in the refinery. (At that time it was owned by Giant Refining)
-
-
Education
-
New Mexico Institute of Mining and Technology
Bachelor of Science (B.S.), Chemical Engineering