Lawrence Isika Sinoni

Project Manager at Simberi Gold Co, Ltd.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Papua New Guinea, PG

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Mining
    • 1 - 100 Employee
    • Project Manager
      • Mar 2023 - Present

    • Projects Engineer
      • Jul 2011 - Present

      -Bid For Projects -Site inspections -Asses projects Costing with Our estimates -Confirm and Sign Off Mark Drawings -Draw up Projects Schedules and Planning -Inspect projects per phases -Do Test and reports as per Scope of Works -Asses Assembling phase -Provide check sheets to Supervisors -Do commissioning -Costing Estimating -Do documentation (MDR) -Bid For Projects -Site inspections -Asses projects Costing with Our estimates -Confirm and Sign Off Mark Drawings -Draw up Projects Schedules and Planning -Inspect projects per phases -Do Test and reports as per Scope of Works -Asses Assembling phase -Provide check sheets to Supervisors -Do commissioning -Costing Estimating -Do documentation (MDR)

    • Mechanical Project Engineer
      • Apr 2022 - Mar 2023

    • Project Engineer/Procurement
      • Mar 2018 - Dec 2021

  • ALBION ENGINEERING
    • Rabaul (ISLANDS PETROLEUM)
    • Project Engineer & Procument
      • Mar 2012 - Aug 2013

      Fabrication and installation of1.3 million Liters Vertical Storage Tank and Installation Of 2km 6" pipe line from wharf to the main distributing manifold in the tank farm. -procurement of materials -do inventory on incoming and existing materials,equipment, consumables etc.. -schedule installation of tanks shells -visual inspection on welds for the pipe line and tank -draw up weld maps for the pipe line and tank for NDT crew to fallow -conduct daily,weekly and monthly report on the progress of the project conduct daily ,weekly and monthly safety meetings -commissioning of the pipe line -compile MDR for the client Show less

  • Albion Engineering ltd
    • Inter Oil Products (Idubada Terminal)
    • Project Engineer
      • Aug 2012 - Feb 2013

      -Biding For Projects -Projects Management -Projects QA/QC -Documenting -Inspection -Biding For Projects -Projects Management -Projects QA/QC -Documenting -Inspection

    • United States
    • Construction
    • 1 - 100 Employee
    • Projects Engineer
      • Jul 2011 - Jun 2012

      Supervise the fallowing teams for Albion Engineering on the Project of construction of a new POWER STATION FOR PNG POWER ,YONKI TOE OF DAM IN EASTHERN HIGLANDS, PAPUA NEW GUINEA; -Corrosion Management Department -Fabricating and Installation team -Inspection on weld joints -commissioning of the project -compile MDR for PNG POWER Was also taking the the role of Safety Representative for Albion Supervise the fallowing teams for Albion Engineering on the Project of construction of a new POWER STATION FOR PNG POWER ,YONKI TOE OF DAM IN EASTHERN HIGLANDS, PAPUA NEW GUINEA; -Corrosion Management Department -Fabricating and Installation team -Inspection on weld joints -commissioning of the project -compile MDR for PNG POWER Was also taking the the role of Safety Representative for Albion

Education

  • DIWINE WORD UNIVERSITY
    Diploma, Project Management
    2016 - 2017
  • UNIVERSITY OF PAPUA NEW GUINEA (SCIENCE FOUNDATION-DISTANCE MODE)
    FOUNDATION YEAR, Chemistry
    2004 - 2015
  • NATIONAL POLYTECH OF PAPUA NEW GUINEA
    DIPLOMA IN MECHANICAL ENGINEERING, Mechanical Engineering
    2006 - 2008

Community

You need to have a working account to view this content. Click here to join now