laura lopez

Seguridad Operacional Ferroviaria at Metro de Madrid, S.A.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Madrid Metropolitan Area, ES

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Spain
    • Truck Transportation
    • 700 & Above Employee
    • Seguridad Operacional Ferroviaria
      • Jan 2022 - Present

    • Spain
    • Higher Education
    • 700 & Above Employee
    • Profesora del título universitario de Especialista en Seguridad Operacional Ferroviaria.
      • Sep 2021 - Present

    • Netherlands
    • IT Services and IT Consulting
    • 1 - 100 Employee
    • Head of railway safety department
      • Mar 2010 - Jan 2022

      Manager in charge of the following resposabilitites within the INECO:-Adopt procedures and action plans in the department. -Ensure compliance with applicable standards and the process of independent safety assessment. -Approve the Independent Evaluation Reports of Safety.-Responsible for achieving established business objectives for the department. -Inform and transmit relevant and strategic messages from the Directors to the working team. -Responsible for billing and collection department.Main Projects:Safety Project engineer within Haramain High-Speed Mecca-Medina project. Cooperating with the System Safety Manager to ensure the safety requirements are achieved at system level and at subsystem level (energy, infrastructure, signaling (interlocking, ERTMS L2, telecommunications and rolling stock); RAMS project engineer cooperating with Netivei Israel, National Transport Infrastructure Company Ltd within Akko – Carmiel, Haifa – Bet shean and Herzelya – Kefar Saba rail lines projects;Manager in charge of the independent safety assessment of the life cycle for the Interlockings, ERTMS L1 L2 and Object Detecting Systems in the Spanish high speed lines: Madrid-Valladolid, Olmedo-Medina del Campo, By-Pass de Madrid Atocha and Madrid-Barcelona-Figueras, Madrid-Levante, Córdoba- Malaga, Albacete-Alicante;Manager in charge of Independent Safety Assessment for onboard ERTMS equipments to be installed in CIVIA trains (Alstom), in UT 446, UT 447 y UT 450 (DIMETRONIC), in AVR (S-121);Manager in charge of the Independent Safety Assessment of the generic product safety case: RBC, PCE, ASFA digital on board. Show less

    • Project Manager/ engineer (Railway safety department)
      • Nov 2001 - Feb 2010

      Main Projects:Project manager in charge of the independent safety assessment of the life cycle for the Interlockings, ERTMS L1 L2 and Object Detecting Systems in the Spanish high speed lines, Madrid-Levante, Córdoba- Malaga,, Castellbisbal-El Mollet, Gerona-Figueras, Castellbisbal-Cantunís.Project manager in charge Safety cycle monitoring and independent assessment of the Case: Generic product safety and generic application of the falling object detectors with swing barrier and monitoring fiber.Ministry of Public Works (Directorate General of Railways) support in monitoring of the European Railway Agency (ERA) working groups for the definition of the Safety Certifications, Safety Indicators… etc.Technical assistance for the drafting of the Manual of Safety Management System for the Railway Infrastructure Administrator.Study of the main Safety Management systems and its application to the Spanish context. SAMRAIL (Safety Management System on Railways) and SAMNET. Projects included in the 5th Framework Programme, which aims to develop an unique Railway Safety Management Program for the European rails in order to implement the European Directive on Safety and its requirements for the interoperability of the European railways.Engineer in charge of the Analysis of the Railway measures package impact, derived from European legislation (Safety Directive, Safety Rail Sector Act, etc.) in Proactive Safety Procedures of RENFE. Pilot Line RENFE-ERTMS, TEN 2001. Engineer in charge of the definition of the Functional specification and functional architecture of the STM's to ASFA, EBICAB, LZB. Show less

Education

  • Universidad Complutense de Madrid
    Licenciada en ciencias físicas
    1993 - 2001

Community

You need to have a working account to view this content. Click here to join now