PT Patra Badak Arun Solusi
-
Indonesia
-
Oil and Gas
-
300 - 400 Employee
-
Piping Engineer
-
Jan 2016 - Present
-
-
-
TRIPATRA
-
Indonesia
-
Engineering Services
-
700 & Above Employee
-
Piping Stress Engineer
-
Nov 2013 - Jan 2016
C) FEED Suban FEL-3 Conoco Phillip Grissik LimitedScope of Work : Front End Engineering Design (FEED) for New Plant Additional.Responsibilities :1) Preparation of Stress Critical P&ID Markup and Critical Line List.2) Perform flexibility analysis of piping system in CAESAR II 2013 ver. 6.1 of lines connected to compressors, pump, air fan cooler, Separator, and Scrubber.3) Flanges leakage check using Pressure Equivalent method & ASME Sec. VIII Div.1 method.4) Analysis of Nozzle load check on equipment (Centrifugal Pumps - API 610; Compresors - API 617; Turbines - NEMA SM23, Blowers, Air Cooled Heat Exchangers – API 661; WRC 107/297)5) Responsible for performing PSV analysis, seismic analysis, wind analysis, slug force and their load case philosophies.6) Vibration analysis7) Preparation of technical data, knowledge and selection of spring hangers (variable).8) PSV reaction force calculations, slug force calculation, expansion loop calculations, trunnion qualification calculations.9) Selecting pipe support type based on system analysis.10) Isometric Checking.11) Perform detail report stress analysis.12) Perform loading data for civil & structure department Show less
-
-
Pipe Stress Engineer
-
Nov 2013 - Jan 2016
D) Tangguh Expansion Project Train-3 LNG FEED - BP Berau Ltd.Scope of Work : Front End Engineering Design (FEED) for new LNG Train, LNG Jetty, and associated infrastructure.Responsibilities :1) Preparation of Stress Critical P&ID Markup and Critical Line List.2) Perform flexibility analysis of piping system in CAESAR II 2014 ver.7 of lines connected to compressors, pump, air fan cooler and vessel.3) Flanges leakage check using Pressure Equivalent method & ASME Sec. VIII Div.1 method.4) Analysis of Nozzle load check on equipment (Centrifugal Pumps - API 610; Compresors - API 617; Turbines - NEMA SM23, Blowers, Air Cooled Heat Exchangers – API 661; WRC 107/297)5) Responsible for performing PSV analysis, seismic analysis, wind analysis, slug force and their load case philosophies.6) Preparation of technical data, knowledge and selection of spring hangers (variable).7) PSV reaction force calculations, slug force calculation, expansion loop calculations, trunnion qualification calculations.8) Vibration analysis9) Selecting pipe support type based on system analysis.10) Isometric Checking.11) Perform detail report stress analysis.12) Perform loading data for civil & structure department Show less
-
-
Construction Engineer
-
Nov 2013 - Jan 2016
A) NUI Reactivation (NURA) Zulu F/S (Offshore Project) PHE-ONWJScope of Work : Detail engineering & design, fabrication, demolition, installation, modification, and pre commissioning.Responsibilities :1) Perform flexibility analysis for piping system.2) Review & check equipment layout, piping plan & isometric drawing.3) Review & check valve & pipe material specification.4) Prepare material take-off, work list & work package, golden joint application, & Tie-In list5) Supervision for piping construction (offshore). Show less
-
-
Pipe Stress Engineer
-
Nov 2013 - Jan 2016
Scope of Work : Detail Engineering & Design, Procurement, Fabrication, Construction, Testing, Pre-Commissioning & Commissioning, and Start-Up.Project Overview :The Banyu Urip EPC-1 is one of five EPC contract and involves of development and construction Flowline and Central Processing Facility (CPF). The CPF can process and produce 165,000 bpd cruide oil from 3 well pads.Responsibilities :1) Construction supervision2) Line checking3) Pipe stress verification as per actual construction, such as change of route, support location, support type. Show less
-
-
Pipe Stress Engineer
-
Nov 2013 - Dec 2014
A) EPC Senoro Gas Development Production Facilities ProjectProject Overview :Senoro Gas Development is part of integrated gas-LNG project development in the area Donggi & Motindok (PPGM) and LNG Plant (PT DSLNG).EPC for Production facilities development includes Gathering, Flowline, Central Gas Processing Plant (CPP), delivering Sales Gas (pipeline), and stabilized condensate. Each train shall be designed to produce 155 mmscfd of net sales gas, for total capacity of 310 mmscfd. And 30” dia. – 28 km long pipeline.Scope of Work : Detail Engineering & Design, Procurement, Fabrication, Construction, Testing, Pre-Commissioning & Commissioning, and Start-Up.Responsibilities :1) Preparation of Stress Critical P&ID and Critical Line List.2) Perform flexibility analysis of piping system in CAESAR II ver. 5.3 & 6.1 and AutoPipe V8i of lines connected to compressors, pump, air fan coolers, heat exchangers, pressure vessels, columns, storage tanks and rack piping etc.3) Flanges leakage check using pressure equivalent method, ASME Sec. VIII method, and based on NC 3658.3 method.4) Analysis of Nozzle load check on equipment (Centrifugal Pumps - API 610; Compresors - API 617; Turbines - NEMA SM23, Blowers, Air Cooled Heat Exchangers – API 661; Plate Heat Exchangers – API 662; Tanks – API 650, Fired Heaters – API 560, WRC 107/297)5) Nozzle local load check using Nozzle Pro.6) Responsible for performing PSV analysis, seismic analysis, wind analysis, slug force and their load case philosophies.7) Preparation of technical data, knowledge and selection of Spring hangers (variable).8) PSV reaction force calculations, Slug force calculation, Expansion loop calculations, Trunnion qualification calculations.9) Familiar with calculations of piping components like pipe wall thickness, Branch Calculations as per ASME B31.3.10) Selecting pipe support type based on system analysis.11) Isometric Checking.13) Perform report stress analysis. Show less
-
-
-
PT Patra Badak Arun Solusi
-
Indonesia
-
Oil and Gas
-
300 - 400 Employee
-
Piping Engineer
-
Jun 2011 - Oct 2013
Responsibility : 1. Provide detail design, specification & datasheet : - Line pipe & Fitting - 3 Layer Polyethylene (3LPE) or external coating material - Ball & Gate Valves - Bend pipe R=6D - Pig launcher & receiver 2. Perform pipe stress analysis, wall thickness calculation based on ASME B31.4. 3. Perform stress analysis for pig launcher & receiver based on ASME Sec. VIII Div. I using PV-Elite or Compress Software. 4. Perform buoyancy calculation for swampy area. 5. Review Horizontal Direction Drilling calculation. 6. Selection pipe support type. 7. Review Piping Layout, Alignment Sheet, General Arrangement & Isometric Drawing Tie-In Area & Tie-In Index. 8. Review for vendor technical specifications and bidders’ quotations. Show less
-
-
-
-
Mechanical Engineer
-
Jul 2008 - May 2011
-
-
-
PT.Hanjung Indonesia
-
1 - 100 Employee
-
Design Engineer
-
Nov 2007 - Jul 2008
-
-
Education
-