Latief Riyanto
Principal Production Technologist at PETRONAS RESEARCH SDN. BHD.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
PETRONAS RESEARCH SDN. BHD.
-
Malaysia
-
Consumer Services
-
100 - 200 Employee
-
Principal Production Technologist
-
Aug 2021 - Present
Provide technical assurance in CCS (Carbon Capture Storage) projects in storage development plan, well integrity analysis and well completion design. Lead implementation of new technology in production enhancement/optimization Provide technical assurance in CCS (Carbon Capture Storage) projects in storage development plan, well integrity analysis and well completion design. Lead implementation of new technology in production enhancement/optimization
-
-
-
PETRONAS Carigali Sdn Bhd
-
Turkmenistan
-
Oil and Gas
-
1 - 100 Employee
-
Principal Production Technologist
-
Oct 2020 - Present
Lead and provide technical assurance on Production Enhancement proposal maturation. Subject Matter Expert on Hydraulic Fracturing, Well Stimulation and Sand Control. Focal person for new technology application.
-
-
Staff Production Technologist
-
Jul 2014 - Oct 2020
Lead and provide technical assurance on well completion design in Field Development Program (FDP) for new and brown fields. The experiences cover various type of wells: cemented monobore, horizontal well with OHGP, OHSAS with ICD/AICD, multizones water and gas injectors.
-
-
Sr. Production Technologist
-
Jul 2009 - Jul 2014
• Provides technical assurances in technology upgrading and best practices to support the asset development (artificial lift and flow assurance) • Lead and conduct feasibility studies for new technologies development and application• Subject Matter Expert (SME) for hydraulic fracturing and water shut off
-
-
-
Total E&P Indonesie
-
France
-
1 - 100 Employee
-
Senior Well Service Engineer
-
2006 - Jun 2009
• Initiating implementation of new technologies in well intervention with objective to improve well’s performance or to optimize operational cost and duration.• Designing well intervention program and supervision of special operations: through tubing sand control, water shut off, stimulation, hydraulic fracturation• Working in a team to set up budget and contract to support operation.
-
-
Well Performance Engineer
-
2002 - 2006
• Field surveillance for 300+ dual gas lift well in mature oil fields with objective to optimize field production.• Key member of sand management task force: sand monitoring, surface sand handling and downhole sand control.
-
-
Education
-
IFP - Institute Francais du Petrole
Master, Petroleum (DEG) -
Institut Teknologi Bandung
Bachelor, Mechanical Engineering