Latief Riyanto

Principal Production Technologist at PETRONAS RESEARCH SDN. BHD.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Kuala Lumpur, Federal Territory of Kuala Lumpur, Malaysia, MY

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Malaysia
    • Consumer Services
    • 100 - 200 Employee
    • Principal Production Technologist
      • Aug 2021 - Present

      Provide technical assurance in CCS (Carbon Capture Storage) projects in storage development plan, well integrity analysis and well completion design. Lead implementation of new technology in production enhancement/optimization Provide technical assurance in CCS (Carbon Capture Storage) projects in storage development plan, well integrity analysis and well completion design. Lead implementation of new technology in production enhancement/optimization

    • Turkmenistan
    • Oil and Gas
    • 1 - 100 Employee
    • Principal Production Technologist
      • Oct 2020 - Present

      Lead and provide technical assurance on Production Enhancement proposal maturation. Subject Matter Expert on Hydraulic Fracturing, Well Stimulation and Sand Control. Focal person for new technology application.

    • Staff Production Technologist
      • Jul 2014 - Oct 2020

      Lead and provide technical assurance on well completion design in Field Development Program (FDP) for new and brown fields. The experiences cover various type of wells: cemented monobore, horizontal well with OHGP, OHSAS with ICD/AICD, multizones water and gas injectors.

    • Sr. Production Technologist
      • Jul 2009 - Jul 2014

      • Provides technical assurances in technology upgrading and best practices to support the asset development (artificial lift and flow assurance) • Lead and conduct feasibility studies for new technologies development and application• Subject Matter Expert (SME) for hydraulic fracturing and water shut off

    • France
    • 1 - 100 Employee
    • Senior Well Service Engineer
      • 2006 - Jun 2009

      • Initiating implementation of new technologies in well intervention with objective to improve well’s performance or to optimize operational cost and duration.• Designing well intervention program and supervision of special operations: through tubing sand control, water shut off, stimulation, hydraulic fracturation• Working in a team to set up budget and contract to support operation.

    • Well Performance Engineer
      • 2002 - 2006

      • Field surveillance for 300+ dual gas lift well in mature oil fields with objective to optimize field production.• Key member of sand management task force: sand monitoring, surface sand handling and downhole sand control.

Education

  • IFP - Institute Francais du Petrole
    Master, Petroleum (DEG)
    2000 - 2002
  • Institut Teknologi Bandung
    Bachelor, Mechanical Engineering
    1993 - 1998

Community

You need to have a working account to view this content. Click here to join now