LASSOUED SADOK

Control and measurement at Agence Nationale Des Fréquences
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Tunis, Tunisia, TN

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Algeria
    • Telecommunications
    • 1 - 100 Employee
    • Control and measurement
      • Sep 2016 - Present

      • Surveying frequency band • Measurement with analyzer • Interference measurement and source detection • Frequency scan measurement with TCI mobile unit • Frequency measurement with fixed station TCI and mobile station TCI • Compliance chek • Field measurement with field meter and measuring chain SATIMO • Surveying frequency band • Measurement with analyzer • Interference measurement and source detection • Frequency scan measurement with TCI mobile unit • Frequency measurement with fixed station TCI and mobile station TCI • Compliance chek • Field measurement with field meter and measuring chain SATIMO

    • United Arab Emirates
    • Telecommunications
    • 700 & Above Employee
    • Om team leader
      • Nov 2010 - Aug 2016

      OM TEAM LEADER: • Preventive work : check of alarms, clean-up filter and funs, check of equipment and power measurement, check batteries state, check of antenna , check of the Tower, RRU, MW LINKS, RX LEV, earth measurement, repair and reporting of anomaly… • Curative work: troubleshooting of BTS HUAWEI DBS3900 2G&3G, PDH/SDH NEC links alarms, RRU, antenna alignment, PTN alarms, power alarms, air conditioner… MW SUPERVISOR: • Installation of MW LINKS HUAWEI optix RTN 910/950 antenna 0,3 up to 1,2 • Commissioning troubleshooting and acceptance with customer of MW LINKS HUAWEI • Installation & commissioning of BTS sites HUAWEI • Swap ALU links to HUAWEI links Show less

  • Hayetcom
    • Tunisie
    • Team Supervisor
      • Nov 2009 - Oct 2010

      • Supervision site reconfiguration from BTS 900 to BTS 1800 (night operation) Three teams by night and five per day • Supervision ALCATEL BSS (installation, integration and acceptance) • Supervision MW NEC (installation, commissioning and acceptance) • Supervision ALCATEL MW (link installation, integration and acceptance) • Supervision site reconfiguration from BTS 900 to BTS 1800 (night operation) Three teams by night and five per day • Supervision ALCATEL BSS (installation, integration and acceptance) • Supervision MW NEC (installation, commissioning and acceptance) • Supervision ALCATEL MW (link installation, integration and acceptance)

    • United Kingdom
    • Staffing and Recruiting
    • 100 - 200 Employee
    • Commissioning supervisor
      • Jun 2009 - Oct 2009

      • Supervision of Installation and commissioning of MW link ALCATEL9400 AWY, 9500 MXC/MPR • Supervision of Installation and commissioning of 2G BSS equipment (BTS, MW Link, power rack, rooting, housekeeping alarms, acceptance and...) • Supervision of Installation and commissioning of 3g equipments (RRH, nodes, • Optical fibre, rooting, commissioning, alarms and acceptance and …) • Supervision of Installation and commissioning of MW link ALCATEL9400 AWY, 9500 MXC/MPR • Supervision of Installation and commissioning of 2G BSS equipment (BTS, MW Link, power rack, rooting, housekeeping alarms, acceptance and...) • Supervision of Installation and commissioning of 3g equipments (RRH, nodes, • Optical fibre, rooting, commissioning, alarms and acceptance and …)

    • France
    • Telecommunications
    • 700 & Above Employee
    • TRANSMISSION&BSS SUPERVISOR
      • May 2006 - May 2009

      • Site survey and preparation of before project detailed rapport (quantitative bordereaux detailed) • Supervision of site installation (mast, rooftop and tower) civil work, erection and metal construction • Supervision of RF installation (sectarian antenna, site master measurement, RF cabling) • Supervision of BTS installation (BTS MBO2 and MBO2E outdoor and MBI5 indoor) • Supervision of mw installation (9400 UX/LX, AWY, 9500MXC) • Acceptance of site and Maintenance of BSS Alcatel • Development of the attachments and the files sites Acceptance of equipment BSS with the customer • Management of the teams of works and supervision of the: Outdoor, Indoor installations, controls Show less

Community

You need to have a working account to view this content. Click here to join now