Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Indonesia
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • QA Specialist
      • Mar 2022 - Present
    • Quality Assurance Engineer
      • Oct 2013 - Jan 2022

      PT. Hitachi Power Systems Indonesia 2013 - 2022 Quality Assurance, Electrical Engineer ( Section Testing) A. Job Description : 1. Perform test for electrical and mechanical of Gas Insulated Switchgear (GIS) refer to flow chart inspection. 2. Prepare document / drawing (making checksheet and drawing test) before inspection . 3. Prepare Factory test procedure. 4. Perform operation test, contact resistance, timing test, interlock test, HV test, partial discharge test and impulse test. 5. Review result after testing. 6. Making monthly quality report. 7. Final check product before delivery to site. 8. Making factory inspection report and site inspection report. B. Factory Experience : 1. Testing GIS 123 kV 2. Testing GIB 123 kV 3. Testing GIS 145 kV 4. Testing GIB 145 kV 5. Testing GIS 170 kV 6. Testing GIS 275 kV 7. Testing GCB 362 kV 8. Testing GCB 550 kV 9. Testing GIB 550 kV 10. Testing GIS 550 kV C. Site Experience 1. Maintenance GIS 150 kV Mobile at GI Citra Habitat Tanggerang 2021 2. Project Shikalbaha Bangladesh GIS 132 kV 2020 3. Project Agrabad Bangladesh GIS 132 kV 2019 4. Type test GIS 500 kV at KEMA (Netherlands) 2018 5. Project Bandara Ngurah rai Ekstension GIS 150 kV 2018 6. GIL 550 kV PLN Kembangan . 2017 7. Maintenance GIS 170 kV at PLTU PAITON East Java. 2016 8. Individual test at PLN Maintenance Package 1 2016 (Kemang Substation, Mampang Substation, Karet Baru Substation) . 9. GIS 170 kV PT Holcim Indonesia. 2015 Show less

    • Operation Departement
      • Nov 2012 - Oct 2013

      1. Implement, monitor and inspect all activities in operating the gas turbine to achieve an optimal and efficient operation. 2. Operate Gas Turbine Generator and HRSG accordance with standard operating procedures at the area or in the controller room. 3. Make report to maintenance department for repair abnormal condition from gas turbine. 4. Make work permit to isolate area of the gas turbine to secure maintenance work. 5. Prepare and perform operations associated with work permit. 6. Observe technicians worked to repair the abnormal condition. Show less

Education

  • Sekolah Tinggi Teknik-PLN
    S1 Teknik Elektro, Electrical and Electronics Engineering
    2008 - 2012

Community

You need to have a working account to view this content. Click here to join now