Lalitha Sivanesan
Project Manager 2 at Thermadyne- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Thermadyne
-
Environmental Services
-
1 - 100 Employee
-
Project Manager 2
-
Apr 2007 - Present
Manage new product development, modification and /or expansions of existing product lines, global sourcing initiatives and margin improvement projects. Will participate in initial product conceptualization and manage the project across several organization groups in order to drive the product from concept to sales launch. Responsible for project planning, scheduling and intergration of cross fuctional groups at all stages of the project using a stage gate approach to project control.
-
-
Sr. Manufacturing Engineer
-
Apr 2004 - Apr 2007
Led several continuous improvement projects, cost reduction initiatives, and operational components of NPI projects. Designed, developed and tested systems that increase productivity by improving integration of people, materials, equipment and finance. Analyzed and assessed the techniques used in the production process to determine efficient utilization of workers and equipment. Recommended methods for improving worker efficiency and enhancing safety. Developed systems for cost analysis and provided management with cost estimates and evaluations. Established performance standards and time needed for the various stages of production. Show less
-
-
-
Tweco Products
-
United States
-
Industrial Engineer
-
Apr 2001 - Apr 2004
Designed, developed and tested systems that increase productivity by improving integration of people, materials, equipment and finance. Mainly promoting and reorganizing the facility utilizing lean, ergonomic and safety concepts. Analyzed and assess the techniques used in the production process to determine efficient utilization of workers and equipment. Developed systems for cost analysis and provide management with cost estimates and evaluations. Designed, developed and tested systems that increase productivity by improving integration of people, materials, equipment and finance. Mainly promoting and reorganizing the facility utilizing lean, ergonomic and safety concepts. Analyzed and assess the techniques used in the production process to determine efficient utilization of workers and equipment. Developed systems for cost analysis and provide management with cost estimates and evaluations.
-
-
Education
-
Wichita State University