PT Lautan Luas Tbk. - ORGANO Corp. Project : 1. Mitsubishi Chemical Plant 2. Yamazaki Indonesia 3. Nusa Halmahera Mineral 4. CSTS - Tangguh LNG 5. SMART Tbk 6. Permata Hijau Group 7. SNF Polymer Indonesia Main Role Activities : - Collaborate with engineering team, subcon, vendor in the design and development process of the project - Perform and involved internal and external meeting during the project - Perform site inspection to ensure the fabrication and construction process output comply with design drawing & standard criteria - Involved in process of FEED & DED engineering document for each project - Perform in design and development process of equipment layout, P&ID, piping route, pipe spool, support, pipe rack, civil layout, detail fabrication and construction drawing (with the consideration of operation, maintenance, construction process related to the national and international standard design) - Create and develop Standard Drawing & Libraries - Supervise and lead all drafter staff in responsible of creating 2D & 3D drawing, material take off and bill of quantity - Responsible in review and check for all of engineering drawing output (P&ID, layout, fabrication, erection, shop drawing, as built drawing, etc) Show less
-
-
-
PT Lautan Luas Tbk
-
Indonesia
-
Chemical Manufacturing
-
400 - 500 Employee
-
Business Development Officer
-
2012 - Present
-
-
Assigned as Engineering Drafter Supervisor
-
2018 - 2020
Project :Create and develop Engineering Drawing Standard (EDS)- Create and develop Engineering Drawing Standard (EDS) for PT Lautan Luas Tbk Group & Subsidiaries- Create Engineering Drawing Standard Document Handbook- Create presentation & training materials of EDS- Conduct training and implementation of EDS to all Subsidiaries & Group- Supervise and lead all of engineering drafter under Lautan Luas Group and Subsidiaries- Review all of engineering drawing under Lautan Luas Group and Subsidiaries to ensure all engineering drawing comply with EDS- Make a report for the development and implementation of EDS to Head Of Business Development Directorate Show less
-
-
Assigned as Maintenance Engineer
-
2016 - 2018
Project :Equipment Priority Assessment (EPA)Maintenance Management System (MMS)Including : Preventive Maintenance, Corrective Maintenance, Root Cause Analysis- Create and develop Equipment Priority Assessment (EPA) procedures and standard document for PT Lautan Luas Tbk Group & Subsidiaries- Create and develop Maintenance Management System (MMS) procedures and standard document for PT Lautan Luas Tbk Group & Subsidiaries- Create presentation & training materials of EPA & MMS- Conduct training and implementation of EPA & MMS to all Subsidiaries & Group- Make a report for the development and implementation of EPA & MMS to Head Of Business Development Directorate Show less
-
-
Assigned as Mechanical Piping Engineer
-
2015 - 2016
Project :Improvement of PAC Pressurize PlantProcess Safety Management (PSM)1. Involved in Improvement Project of PAC Pressurize Plant- Design for equipment, pipe line and layout- Create MTO and BOQ- Internal and external meeting during the project - Perform site inspection during the project- Ensure the work process safety comply with HSE regulations- Work Instruction & Job Safety Analysis- Make report (weekly, monthly) of construction & installation progress- Review all engineering drawing & document2. Involved in Development of Process Safety Management System for All Manufactures & Subsidiaries Lautan Luas Group Show less
-
-
Assigned as Design Engineer
-
2012 - 2014
Project :PAC Pressurize Plant – Tangerang, IndonesiaWTP & WWTP for Ecogreen Oleo Chemical Plant – Batam, Indonesia- Collaborate with engineering team, subcon, vendor in the design and development process of the project- Perform and involved internal and external meeting during the project - Perform site inspection to ensure the fabrication and construction process output comply with design drawing & standard criteria- Perform in design and development process of equipment layout, P&ID, piping route, pipe spool, support, pipe rack, civil layout, detail fabrication, shop drawing and as built drawing- Involved in check & review of submission drawing from Subcon and vendor- Prepare MTO & BOQ Show less
-
-
-
-
Site Engineer - Mechanical Piping
-
2011 - 2012
Project : Intercontinental Building – Luanda , Angola Sonangol Refinery HQ Building – Luanda, Angola - Make detail design for mechanical & piping work - Create shop drawing for installation process - Create as built drawing during finishing process - Ensure the construction & installation process according to the design drawing - Ensure the work process safety comply with HSE regulations - Work Instruction & Job Safety Analysis - Manage, coordinate and supervise site worker-leader - Make report (weekly, monthly) and s-curve of construction & installation progress - Involved in project meeting, coordination with client and others stakeholder Show less
-
-
-
PT SMART Tbk
-
Indonesia
-
Food and Beverage Manufacturing
-
700 & Above Employee
-
Site Engineer
-
2010 - 2011
Project : PT SMART Tbk – Lampung (Refinery Plant, Storage Tank Yard & Jetty) - Responsible for the project construction & installation process (review schedule, permit, method, material, progress, deadline, quality) - Prepare MTO & BOQ - Perform monitoring process of material delivery - Manage & coordinate sub-contractor and vendor work - Ensure the work process safety comply with HSE regulations - Work Instruction & Job Safety Analysis - Ensure the construction & installation process according to the design drawing - Make report (weekly, monthly) of construction & installation progress - Involved in project meeting and problem solving of project issue - Review shop drawing for installation process - Review as built drawing during finishing process Show less
-
-
-
PT Paramita Bangun Sarana Tbk
-
Indonesia
-
Construction
-
1 - 100 Employee
-
Senior Mechanical Piping Drafter
-
2009 - 2010
Project :PT SMART Tbk – Lampung (Bulking, Jetty, Refinery & Crushing Plant)PT SMART Tbk – Tarjun, Kalimantan (Bulking, Jetty, Oil Mill Plant)- Responsible in process of creating 2D & 3D drawing base on design concept for mechanical, piping work- Shop Drawing, For Con Drawing, As Built Drawing, Composite Drawing- BFD, PFD, P&ID drawing- Section, detail and fabrication drawing- P&ID, piping route, pipe spool, pipe isometric, support, pipe rack, mechanical drawing- General arrangement and layout drawing- Create MTO & BOQ- Perform site inspection to ensure construction process base on construction drawing Show less
-
-
Mechanical Piping Drafter
-
2008 - 2009
Project :PT SMART Tbk – Surabaya (Refinery, Storage, Packaging)- Responsible in process of creating 2D & 3D drawing base on design concept for mechanical, piping work- Shop Drawing, For Con Drawing, As Built Drawing, Composite Drawing, Layout Drawing- BFD, PFD, P&ID drawing- Section, detail and fabrication drawing- P&ID, piping route, pipe spool, pipe isometric, support, pipe rack, mechanical drawing- Create MTO & BOQ
-
-
-
Prima Graha Bangun Tunggal, PT
-
Indonesia
-
Wholesale Building Materials
-
1 - 100 Employee
-
Project Engineer
-
2007 - 2008
Project :Ratu Hotel - Serang- Responsible for the project construction & installation process (schedule, permit, method, material, progress, deadline, quality)- Prepare material breakdown of BOQ- Perform monitoring process of material delivery- Manage & coordinate sub-contractor and vendor work- Ensure the work process safety comply with HSE regulations- Ensure the construction & installation process according to the design drawing- Make report (weekly, monthly) of construction & installation progress- Involved in project meeting, coordination with client and others stakeholder- Create shop drawing & built drawing during project construction process Show less
-
-
CAD Drafter
-
2006 - 2007
Project :East Park Apartment Building - Jakarta- Responsible in process of creating 2D drawing base on design concept of mechanical, piping, electrical and civil work- Shop Drawing, For Con Drawing, As Built Drawing, Composite Drawing, Layout Drawing- Process & diagram drawing- Section, detail and fabrication drawing- Isometric, piping, mechanical drawing- Create MTO & BOQ
-
-