Kyle McDaniel
Continuous Improvement Manager at Proterra Inc- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Proterra Inc
-
United States
-
Motor Vehicle Manufacturing
-
500 - 600 Employee
-
Continuous Improvement Manager
-
Sep 2022 - Present
Greenville, South Carolina, United States
-
-
-
GE Power
-
United States
-
Electric Power Generation
-
700 & Above Employee
-
Lean Leader
-
Feb 2021 - Aug 2022
Greenville, South Carolina, United States
-
-
-
Plastic Omnium
-
France
-
Motor Vehicle Manufacturing
-
700 & Above Employee
-
Quality Manager
-
Nov 2019 - Feb 2021
Anderson, South Carolina, United States
-
-
Facilities and Maintenance Supervisor
-
Jul 2018 - Nov 2019
Adrian, MI
-
-
Manufacturing Engineer
-
Jun 2016 - Jul 2018
Greater Detroit Area ▪ Led shift meetings with team members to enable quick responses to potential issues ▪ Coordinated a production line move to reduce labor and inventory levels ▪ Presented monthly to the management team about current progress in the plant ▪ Preformed work balance study for forklift work load across the entire plant ▪ Developed and implemented multiple engineering changes to increase machine reliability ▪ Implemented the Improvement Kata lean manufacturing tool to reduce waste in… Show more ▪ Led shift meetings with team members to enable quick responses to potential issues ▪ Coordinated a production line move to reduce labor and inventory levels ▪ Presented monthly to the management team about current progress in the plant ▪ Preformed work balance study for forklift work load across the entire plant ▪ Developed and implemented multiple engineering changes to increase machine reliability ▪ Implemented the Improvement Kata lean manufacturing tool to reduce waste in multiple areas ▪ Assisted in the launch of two new product lines
-
-
-
-
Superintendent
-
Jan 2007 - Dec 2010
Auburn, AL - Supervised the development of multi-unit homes - Scheduled, hired, and inspected all work completed by subcontractors - Reduced build time from 84 to 56 days with the use of project management tools - Obtained erosion and storm water control quality inspector license - Wrote and submitted environmental reports to the EPA
-
-