Kyle Stratton

Partner, Project Manager at Castone Construction Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
CA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Professional Engineer (PE)
    Engineers Nova Scotia
    Apr, 2018
    - Oct, 2024
  • Professional Engineer (PE)
    Association of Professional Engineers & Geoscientists NB (APEGNB)

Experience

    • Canada
    • Construction
    • 1 - 100 Employee
    • Partner, Project Manager
      • Sep 2015 - Present
    • Project Engineer
      • Jul 2018 - Dec 2018
    • United States
    • Construction
    • 1 - 100 Employee
    • Project Manager / General Superintendent
      • Nov 2014 - Sep 2015

      Project Manager on a design-build 23,000 sq.ft expansion to a rubber processing plant in Langley, BC.- Responsible for tendering, schedule, budget, and coordinating Owner's needs with the design team to meet building permit application.- Once construction begins (March 2015), I will be the on-site general superintendent while maintaining my PM responsibilities.

    • General Superintendent
      • Aug 2014 - Oct 2014

      Safely executing the construction of an ore concentrate storage building at the bulk terminal in Stewart, BC. - Supervising civil, concrete, steel, and electrical subcontractors to maintain a high standard of safety and quality throughout the job.- Develop and maintain project schedule

    • Superintendent
      • Aug 2012 - Jul 2014

      Structural Steel Superintendent:Responsible for safely managing and directing a structural steel erector sub-contractor in a module yard in Edmonton and on Syncrude site Ft. McMurray. Interface daily with General Contractor’s various disciplines (piping/mechanical/electrical) to safely plan work and resolve issues. Also superintendent of Heavy Haul and Heavy Lift of structural modules.With a small site team, secondary responsibilities included:Project Engineer: Writing and maintaining work plans and ITPs; Contract management; high level project planning; full understanding of project technical specifications.Field Engineer: Daily quantity claiming and reporting; Solving technical issues that arise in the field through drawing interpretation, RFIs, and NCRs.Quality Control: Developed and implemented project-specific Quality Plan; consistently carry out Quality checks and reports on ongoing field work.Planner/Scheduler: Develop and maintain field level schedule to meet high-level project schedule.

    • Civil Engineering
    • 300 - 400 Employee
    • Mechanical Engineer, P.Eng
      • Nov 2011 - Jul 2012

      A member of a "Fix it Now" team in which any technical issues that arise in the field are immediately addressed . I am responsible for investigating the problem, developing the engineering solution and preparing all technical paperwork required to get the issues resolved safely and effectively. The team must work at a very fast pace, as issues often arise that can directly impact the Project critical path. When the work packages are executed in the field, I provide assistance to the field staff in their implementation.

    • Mechanical Field Engineer
      • Jun 2008 - Nov 2011

      I was directly responsible for providing engineering technical support for complex Reactor component installation processes and automated heavy tooling systems. I worked hands on to diagnose mechanical and software errors during tool operation, and developed work solutions to challenges in the field. Other activities involved writing work procedures, daily progress reports and technical documents, training technicians and trades personnel, and acting as a technical advisor in a clean room atmosphere.

    • Project Engineer
      • Aug 2007 - Sep 2010

      In parallel to my technical responsibilities above, I held the lead role on a number of large scope construction projects. Responsibilities included but were not limited to: interpreting contracts and providing cost estimates to new addendums, detailed scheduling, work scope integration with the rest of the Project and with the Client, and ensuring all required documentation is approved for construction. I provided detailed progress reports to senior management and met regularly with Clients to ensure issues and objectives are communicated thoroughly.

    • Canada
    • Government Administration
    • 700 & Above Employee
    • Junior Engineer
      • Jul 2006 - Jul 2007

      I was responsible for authoring Design Requirement and Design Description documents for a number of reactor components for AECL's ACR-1000 and Enhanced Candu 6. I performed engineering calculations in the development of these components' detailed design. I was responsible for authoring Design Requirement and Design Description documents for a number of reactor components for AECL's ACR-1000 and Enhanced Candu 6. I performed engineering calculations in the development of these components' detailed design.

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Engineering Intern
      • May 2005 - Sep 2005

      Worked in gas fields fracturing, cementing, and coil tubing. Worked in gas fields fracturing, cementing, and coil tubing.

    • Canada
    • Government Administration
    • 700 & Above Employee
    • Preventative Maintenance Coordinator
      • May 2004 - Sep 2004

      Set-up a preventative maintenance program from scratch at large, multi-complex agriculture centre. Set-up a preventative maintenance program from scratch at large, multi-complex agriculture centre.

Education

  • University of New Brunswick
    BSc, Mechanical Engineering; ME
    2001 - 2006

Community

You need to have a working account to view this content. Click here to join now