Kyle Felton

Senior Project Manager at JB Pacific
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
San Diego Metropolitan Area

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • OSHA 30 Hour Safety
    OSHA
    Apr, 2013
    - Nov, 2024
  • USACE CQM for Contractors - #784
    Kugan & Associates
    Sep, 2013
    - Nov, 2024

Experience

    • United States
    • Construction
    • 1 - 100 Employee
    • Senior Project Manager
      • Mar 2022 - Present

    • Project Manager
      • Oct 2020 - Sep 2022

    • United States
    • Construction
    • 1 - 100 Employee
    • Project Manager
      • Feb 2016 - Oct 2020

    • Assistant Project Manager
      • Jun 2014 - Feb 2016

  • Kevcon Inc,
    • Greater San Diego Area
    • Project Engineer
      • Mar 2013 - Jun 2014

      Field Engineer for Kevcon Inc. a Service Disabled Veteran Owned Small Business. Duties Include: Managing submittals for several projects including; quality control, specification and plan cross references and timely turnaround. Close out field engineer for projects as needed to keep superintendents free to address the most pressing projects. Assisting project manager as needed to ensure an efficient and profitable project. Field Engineer for Kevcon Inc. a Service Disabled Veteran Owned Small Business. Duties Include: Managing submittals for several projects including; quality control, specification and plan cross references and timely turnaround. Close out field engineer for projects as needed to keep superintendents free to address the most pressing projects. Assisting project manager as needed to ensure an efficient and profitable project.

  • FDH Engineering, Inc.
    • St. Louis MO and San Diego CA
    • Project Manager 1
      • Apr 2011 - Mar 2013

      • Estimating project costs including material take offs, mobilization, and labor involved in order to ensure that a 10% profit margin is met or exceeded for all work. • Managing and coordinating jobs each month ranging from single day in house field work to month long sub-contracted work. • Reporting billed work and projections with budgets based on workload and schedules to the Director on a weekly basis. • Estimating project costs including material take offs, mobilization, and labor involved in order to ensure that a 10% profit margin is met or exceeded for all work. • Managing and coordinating jobs each month ranging from single day in house field work to month long sub-contracted work. • Reporting billed work and projections with budgets based on workload and schedules to the Director on a weekly basis.

    • Assistant Project Manager
      • May 2010 - Jan 2011

      Home Builder May 2010 ­ March 2011 · Responsible for contractual reviews and final contract pricing, coordinating with lenders, sales and closings reporting. Participated in value engineering with project managers. · Construction estimating, cross referenced project managers reports. Established positive relationships with vendors and St. Louis Co. building & code office, pulled permits. Home Builder May 2010 ­ March 2011 · Responsible for contractual reviews and final contract pricing, coordinating with lenders, sales and closings reporting. Participated in value engineering with project managers. · Construction estimating, cross referenced project managers reports. Established positive relationships with vendors and St. Louis Co. building & code office, pulled permits.

    • Construction Manager
      • Sep 2009 - Apr 2010

      · Leadership involved concept development, promoting, fundraising, supervision and project management of the Fall 2008 "Blitz Build" as 500 MSU students built a Habitat home. · Served as liaison between Habitat and the suppliers of donated materials.; · Completely remodeled an entire three-bedroom duplex. Remodeled a bi-level home from carpet to ceiling. Installed new oak hardwood flooring in a three-bedroom house. Redesigned and built second-story deck to meet structural codes. · Gutted a two-story, Victorian house in Lafayette Square and replaced all floors down to subfloor with mahogany wood floors. Re-designed bedroom wall configuration. Show less

    • Construction Intern
      • May 2009 - Sep 2009

      · Worked on completion stages of a 9 story Courtyard by Marriott complex in Texas · Responsible for quality control, posting ASI, site preparation for sub-contractors. · Participated in daily project management meetings, observed 3 week schedule cycles, reported progress of sub contractor work crews to maintain schedule. · Worked on completion stages of a 9 story Courtyard by Marriott complex in Texas · Responsible for quality control, posting ASI, site preparation for sub-contractors. · Participated in daily project management meetings, observed 3 week schedule cycles, reported progress of sub contractor work crews to maintain schedule.

Education

  • Missouri State University
    Bachelor of Science (B.S.), Construction Management
    2006 - 2010

Community

You need to have a working account to view this content. Click here to join now