Kseniia Shtorm
Designer at Van der Hoeven Horticultural Projects- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Van der Hoeven Horticultural Projects
-
Netherlands
-
Construction
-
1 - 100 Employee
-
Designer
-
Aug 2022 - Present
-
-
-
Universum Project
-
Real Estate
-
1 - 100 Employee
-
Project manager assistant
-
Jul 2021 - Feb 2022
* Involved in preparation of project documentation – FEED and Detail design documentation in cooperation with designers, engineers; * Reduction of the planned budget by 15% due to in-depth verification of tender proposals of subcontractors and material suppliers, checking compliance with project offers documentation * Prepared Time plan, Budget over $1.5 mln and budget plan for implementation; * Validated budgeted cost of work performed reported by the project suppliers and contractors reports in a week/month/quarter; * Assisted the Project Manager using EVM (Earned value management); * Registered the project cost changes; * Prepared regular reports for meetings with clients. Show less
-
-
-
Colliers
-
Canada
-
Real Estate
-
700 & Above Employee
-
Quantity surveyor
-
Feb 2020 - Jun 2021
Object: Engineering, repair and other fit-out works on the fourth and fifth floors of the office JTI Russia * Prepared Budget over $6 mln. and budget plan for implementation; * Prepared of Tender Documents comprising Preliminaries, Conditions of Contract and for pricing by the contractors; * Reduced tender proposals of subcontractors and material suppliers by 8%. Thanks to negotiations with the contractor where I participated; * Prepared of the Tender report for the client; * Reduced project costs while concluding subcontracts; * Validated budgeted work costs performed and reported by project suppliers and contractors in a week/month/quarter; * Registered the project cost changes; * Assisted the Project Manager using EVM (Earned value management); * Estimated completed work, oversing bills and arranging payments; * Supported the finance control team. Show less
-
-
-
ООО "АвангардСтройКомплекс"
-
Санкт-Петербург, Россия
-
Leading Cost Engineer
-
Jun 2019 - Feb 2020
Objects: Reconstraction V.G. Khlopin Radium Institute; * Analysis of tender documentation (including Detail design documentation, MEP systems), preparing pre-tender costs (including development of estimate documentation), formalization tender documents for agreement with clients; * Negotiated protection of estimate documentation with the client to make sure the cost project is estimated in line with the clients requirements; * Prepared budget plan for implementation; * Validated budgeted cost of work performed reported by the project suppliers and contractors reports in a format and frequency that provides clear visibility of the status of expenditure against budgets for internal use; * Registered the project cost changes; * Worked with the scheduling team, the architect engineers project controls team and finance control team. Show less
-
-
-
ООО "ЦЭСиМ"
-
Yaroslavl Region, Russian Federation
-
Leading Cost Engineer
-
May 2017 - May 2019
Objects: Construction of a multifunctional shopping complex "LENTA" with a transformer substation; Construction of an apartment building with smart home technology. * Conducted a Feasibility Study based on the FEED and Detail design documentation; * Prepared and maintaining cost and cash forecasts in alignment with the CBS (Cost breakdown structure) and WBS (Work breakdown structure); * Prepared Budgets (over $5 mln and over $1mln) and budget plans for implementation; cost estimates of the Detailed design document, including work, materials; * Reduced tender proposals of subcontractors and material suppliers by 15%; * Negotiated and approval of cost estimate documentation with customers, contractors and subcontractors; * Was collecting information on work done quantities, materials to the construction site; * Validated budgeted cost of work performed reported by the project suppliers and contractors reports in a format and frequency that provides clear visibility of the status of expenditure against budgets for internal use; * Registered the project cost changes; * Was supporting the finance control and investment case teams; * Was valuing completed work, oversing bills and arranging payments. Show less
-
-
-
ООО Всеобъемлющие решения
-
Moscow, Russian Federation
-
Cost Engineer
-
Mar 2016 - Jan 2017
Object: Reconstruction systems burglar alarm, automatic fire alarm, fire alarm and evacuation control in the branches of the Central Bank * Conducted a Feasibility Study based on the FEED and Detail design documentation; * Prepared cost estimates of the Detailed design document, including work, materials and time; * Approval of cost estimate documentation with customers, contractors and subcontractors; * Checking and analysing weekly / monthly statements submitted by contractors. Show less
-
-
-
ЗАО УК ОПЭК
-
Vladimir Region, Russian Federation
-
Engineer
-
Oct 2012 - Jun 2014
Object: Reconstruction Vladimir CHP * Checked FEED and Detail design documentation (AFC status) accordance to the standards and technical conditions, rules; * Checked completeness of construction materials on matching with project solutions, existing engineering drawings and factory documentation; * Matched and checked of the volume completed work with Detail design documentation, preparing and agreement process Certificate of Acceptance; * Prepared, corrected, storaged, accounting as-built documentation; * Maintenance of business correspondence on behalf of general contractor with contractor companies and the customer’s enterprise. Show less
-
-
Education
-
Vladimir State University named after Aleksanr Grigorevich and Nikolai Stoletovy (VlSU)
Engineer's degree -
St. Petersburg Regional Center for Construction Pricing
-
Peter the Great St.Petersburg Polytechnic University
-
ЦНТИ ПРОГРЕСС
-
Interregional public organization "Union of Cost Engineer"