Krunal Prajapati

Project Engineer at BuildQ Group
  • Claim this Profile
Contact Information
Location
Greater Sydney Area, AU

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Australia
    • Real Estate
    • 1 - 100 Employee
    • Project Engineer
      • May 2019 - Present

      • Engaged with clients to understand their construction requirements; followed by cost estimation, preparation of tender and contract specifications • Coordinate with different consultants, including architects, engineers, subcontractors, and regulatory authorities, to ensure timely approval and compliance with statutory requirements, project specifications, and industry standards • Created and executed construction project plans, including schedules, budgets, and resource allocation, to achieve key milestones, and timely project completion • Procured subcontractors and suppliers, issuing scopes of work efficient project completion and optimal resource utilization • Conducted site visits, identified and promptly addressed implementation issues, ensuring smooth project execution • Took charge of organizing financial files to facilitate efficient access to reports, invoices, and contracts for timely approval and disbursal of financial commitments • Collaboratively supported team members and allocated responsibilities to achieve overall team success • Created comprehensive SOPs and custom templates using Buildxact and Asana to standardize processes, increase operational efficiency, and drive cost savings within the team Show less

    • India
    • Civil Engineering
    • 1 - 100 Employee
    • Design Engineer
      • Oct 2017 - Jan 2019

      • Developed structural design concepts using AutoCAD and performed computer simulations to analyze structure under various loads • Calculated sizes of various concrete elements and structural steel required to withstand design load • Coordinated with architects, clients and other stakeholders to resolve design conflicts while maintaining accurate records of drawings, schedules, and specifications • Carried out site visits to inspect and ensure compliance of steel reinforcement work with structural drawings Show less

    • Site Manager
      • Jun 2014 - Oct 2017

      • Planned and coordinated site work to optimize resource allocation and minimize delays • Calculated material BOQ using drawings for procuring the same and conducted quality tests to ensure compliance • Prepared and submitted daily progress reports to construction head • Collaborated with architects, structural engineers, and stakeholders for seamless project execution • Planned and coordinated site work to optimize resource allocation and minimize delays • Calculated material BOQ using drawings for procuring the same and conducted quality tests to ensure compliance • Prepared and submitted daily progress reports to construction head • Collaborated with architects, structural engineers, and stakeholders for seamless project execution

    • India
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Civil Engineer
      • May 2012 - May 2014

      • Executed various construction tasks, including plot leveling, excavation, pathways, bungalow construction, sewage lines, electrical works, and interior finishing • Conducted quantity surveying and estimating based on detailed drawings • Procured construction materials through effective negotiation and ensured their quality upon arrival • Implemented weekly work planning with subcontractors • Successfully completed projects within budget and scheduled timelines • Executed various construction tasks, including plot leveling, excavation, pathways, bungalow construction, sewage lines, electrical works, and interior finishing • Conducted quantity surveying and estimating based on detailed drawings • Procured construction materials through effective negotiation and ensured their quality upon arrival • Implemented weekly work planning with subcontractors • Successfully completed projects within budget and scheduled timelines

    • Graduate Engineer
      • Jul 2011 - Apr 2012

      • Oversaw activities from geotechnical investigation to sub-structure construction • Ensured dimensional accuracy and resolved conflicts in structural and architectural drawings • Implemented rigorous quality control measures and conducted material testing on-site • Oversaw activities from geotechnical investigation to sub-structure construction • Ensured dimensional accuracy and resolved conflicts in structural and architectural drawings • Implemented rigorous quality control measures and conducted material testing on-site

Education

  • Veermata Jijabai Technological Institute (VJTI)
    Bachelor of Technology - BTech, Civil Engineering
    2007 - 2011

Community

You need to have a working account to view this content. Click here to join now