Krittin Chunarong
Electrical Design Engineer at Chuchawal Royal Haskoning- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
Certified Professional Data Analyst
DataRockieOct, 2021- Oct, 2024
Experience
-
Chuchawal Royal Haskoning
-
Thailand
-
Construction
-
1 - 100 Employee
-
Electrical Design Engineer
-
Aug 2023 - Present
-
-
-
SPIE Oil & Gas Services
-
France
-
Oil and Gas
-
700 & Above Employee
-
APM Spare Parts Engineer
-
Jun 2022 - May 2023
• Performed asset register with associated technical objects information such as piping and instrumentation diagram, single-line diagram, block diagram, and general layout of wellhead platforms in Qatar using Microsoft Excel.• Prepared and built-Up the spare parts file per equipment (SPL-E) by consolidating technical data from vendor documents such as datasheets, drawings, general arrangements, and installation operation and maintenance manual.• Analyzed and visualized the progress of work reports by each tag of equipment on the wellhead platform using VLOOKUP and Pivot Table on Microsoft Excel.• Developed Excel VBA code for merging all SPL-E files of each wellhead platform project into a single master file. Show less
-
-
APM Spare Parts Engineer
-
Jun 2022 - May 2023
-
-
-
Siemens Energy
-
Renewable Energy Power Generation
-
700 & Above Employee
-
Project Engineer
-
Feb 2021 - Jul 2021
• Managed the time of the projects by establishing a schedule for constructing 115 kV containerized GIS substations using Microsoft Excel. • Coordinated with subcontractors for technical documents from electrical design engineers to meet customer requirements. • Worked with other team members such as project managers, project administrators, sales engineers, quality and EHS managers, and foreman to resolve technical problems and expedient the project procedures. • Arranged meetings with customers and subcontractors for follow-up schedules and technical procedures. Show less
-
-
-
Black & Veatch
-
United States
-
Engineering Services
-
700 & Above Employee
-
Engineer Intern
-
Jun 2019 - Aug 2019
• Drafted and back-checked one and three-line schematic diagram of 115 kV substation. • Quantified BOM (Bill of Materials) of 115 kV substation using Bluebeam software. • Wired DC schematic diagram of 500kV substation. • Drafted and back-checked one and three-line schematic diagram of 115 kV substation. • Quantified BOM (Bill of Materials) of 115 kV substation using Bluebeam software. • Wired DC schematic diagram of 500kV substation.
-
-
Education
-
Chulalongkorn University
Bachelor of Engineering - BE, Electrical Engineering : Power and Communication Major