Kristen Farrington, PE, PTOE, RSP1

Project Engineer at Vectura Consulting Services
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater New Orleans Region

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Civil Engineering
    • 1 - 100 Employee
    • Project Engineer
      • Mar 2021 - Present

    • United States
    • Design Services
    • 100 - 200 Employee
    • Project Designer
      • Aug 2018 - Mar 2021

    • Transportation EIT II
      • Aug 2017 - Mar 2021

    • United States
    • Civil Engineering
    • 300 - 400 Employee
    • Transportation EIT
      • Jun 2014 - Aug 2017

      Assist with the preparation of plans, specifications and estimates for roadway design projects. Perform traffic analysis studies including corridor studies and traffic impact analyses, as well as speed and safety studies. Develop Synchro analyses for corridor studies and traffic impact analyses, and assist with the preparation of technical reports. Assist with the preparation of plans, specifications and estimates for roadway design projects. Perform traffic analysis studies including corridor studies and traffic impact analyses, as well as speed and safety studies. Develop Synchro analyses for corridor studies and traffic impact analyses, and assist with the preparation of technical reports.

    • United States
    • Civil Engineering
    • 300 - 400 Employee
    • Student Intern
      • May 2013 - Apr 2014

      Assisted with the compilation of initial and final data submittals for three LA DOTD projects in St. Tammany, Livingston and Ascension Parish. Responsible for the calculations of heavy vehicle percentages and peak hour time intervals. Assisted in the QA-QC of raw data, report figures, SIDRA analyses. Analyzed and summarized crash reports for corridors of approximately 10 miles. Responsible for determining conflict points at existing intersections and intersections with future geometric improvements. Created AutoCad figures for corridors with up to 50 intersections. Served as a runner between Neel-Schaffer and LA DOTD. Show less

    • Student Intern
      • Aug 2012 - Apr 2013

      Assisted with design review submittals for Louisiana Department of Transportation and Development bridge replacement projects. Assisted with design review submittals for Louisiana Department of Transportation and Development bridge replacement projects.

Education

  • Louisiana State University
    Bachelor of Science (B.S.), Civil Engineering
    2010 - 2014

Community

You need to have a working account to view this content. Click here to join now